In 2022, Meta announced plans for a mega expansion of the Eagle Mountain Site. This latest addition, consisting of two buildings, will increase the campus by approximately 2 million square feet.
In 2022, Meta announced plans for a mega expansion of the Eagle Mountain Site. This latest addition, consisting of two buildings, will increase the campus by approximately 2 million square feet.
This data center is a part of Meta's Gallatin Campus in Nashville.
Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.
Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.
Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.
Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.
Facebook data center campus in the White Oak Technology Park will use solar power and 100 percent renewable energy.
Facebook, is looking to expand its data center campus near Richmond, Virginia.
Facebook data center campus in the White Oak Technology Park will use solar power and 100 percent renewable energy.
Meta is dramatically scaling its Hyperion data center campus in Richland Parish, Louisiana, into a massive AI infrastructure hub.
The Meta data center in Kuna, Idaho, spans 960,000 square feet, represents an $800 million capital investment, and is part of Meta's global network of 19 data centers, which includes 15 locations within the United States.
This data center is a part of Meta's Kuna Campus in Idaho.
Meta's Mesa data center was first announced in August 2021, is a greenfield development of a five-building campus encompassing over 2.5 million square feet of data center and admin space.
Meta operates a data center campus in New Albany, Ohio, located at 1 Community Circle. The New Albany site consists of five data centers, spanning a total of 2.5 million square feet.
This data center is a part of Meta's Gallatin Campus in Nashville.
In May 2020, Facebook acquired land to build a 970,000 sqft data center in Gallatin, TN
This data center is a part of Meta's Eagle Mountain campus in Utah.
The Campus, situated at 1275 North Community Circle, began construction in 2018. The first data center on this site became fully operational in 2021.
In 2022, Meta announced plans for a mega expansion of the Eagle Mountain Site. This latest addition, consisting of two buildings, will increase the campus by approximately 2 million square feet.
Meta owns 212 hectares of land at Andrup near Esbjerg for a planned hyperscale data center campus known as Project Ember, but the project has been on hold since 2022 as the company redesigns its data center architecture for AI workloads and awaits grid capacity from Energinet.
This facility is part of Meta's Hyperion Campus in Richland Parish, Louisiana.
This facility is part of Meta's Hyperion Campus in Richland Parish, Louisiana.
Meta confirmed plans to develop a $10 billion data center campus in Richland Parish, Louisiana.
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
Meta is building a major new data center campus near Talavera de la Reina, Spain, located about 78 miles (125 km) southwest of Madrid.
The Prometheus data center campus in New Albany, Ohio, serves as a primary hub for Meta's AI training infrastructure.
This facility is part of Meta's Hyperion Campus in Richland Parish, Louisiana.
Later phases of Meta's 607-acre Piqua campus at Farrington and Washington Roads in Piqua, Ohio, beyond the two filed buildings.
First of two planned data center buildings, about 350,000 square feet, on Meta's Piqua campus at the northeast corner of Farrington and Washington Roads.
Second of two planned data center buildings, about 350,000 square feet, on the north half of Meta's Piqua campus at Farrington and Washington Roads.
This facility is part of Meta's El Paso data center campus in West Texas.
This facility is part of Meta's El Paso data center campus in West Texas.
This facility is part of Meta's El Paso data center campus in West Texas.
This facility is part of Meta's $800 million data center campus in Montgomery County, Alabama.
This facility is part of Meta's $800 million data center campus in Montgomery County, Alabama.
This facility is part of Meta's $800 million data center campus in Montgomery County, Alabama.
Meta, formerly known as Facebook is building a $800 million data center in Montgomery County.
This data center is a part of Meta's Altoona Campus in Iowa.
This facility is part of Meta's El Paso data center campus in West Texas.
This facility is part of Meta's Kansas City Campus in Missouri.
This facility is part of Meta's Kansas City Campus in Missouri.
This record holds the later phase of Meta's Sturgeon County AI campus northeast of Edmonton, which builds the campus out to its full planned scale.
DeKalb 4 is the fourth building on Meta's DeKalb, Illinois campus, part of the expansion beyond the first H-shaped building.
When completed, the Fort Worth site will be Facebook’s largest data center to date, four buildings connected to form two “H” shapes, plus one standalone center, for a total of 20 data hall
DeKalb 5 is the fifth building on Meta's DeKalb, Illinois campus, part of the expansion beyond the first H-shaped building.
Meta’s $42 million acquisition of the Clover Valley Road parcel through its subsidiary Sidecat LLC marks a strategic expansion of the Prometheus AI Supercluster in New Albany, Ohio.
Meta is reportedly partnering with Sify Technologies to develop a massive data center in Visakhapatnam, Andhra Pradesh.
North Carolina Data Center Corridor
The second data center on Meta's Forest City campus, built on the former Mako Marine factory site. It mirrors Building 1 with about 370,000 sq ft and four data suites.
This facility is part of Meta's Hyperion Campus in Richland Parish, Louisiana.
This facility is part of Meta's Hyperion Campus in Richland Parish, Louisiana.
This facility is part of Meta's Hyperion Campus in Richland Parish, Louisiana.
This facility is part of Meta's Hyperion Campus in Richland Parish, Louisiana.
Meta is investing over $1 billion to build a 700,000-square-foot data center in Beaver Dam, Wisconsin, its 30th facility globally.
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
Facebook's $750 million datacenter project in Huntsville was previously known by the codename “Starbelt.” The data center is located in the North Huntsville Industrial Park and was expected to launch in 2020, but was delayed until late 2021.
Project Splitrock, the proposed 1,077-acre Meta-backed data center in Howell Township, was officially withdrawn by developers in December 2025 just hours before a final vote by the Board of Trustees.
Meta, operating through its subsidiary Valoa Networks, is advancing plans for a massive data center campus in the municipality of Ii, located in Finland’s Northern Ostrobothnia region.
This facility is part of Meta's Huntsville Campus in Alabama.
This facility is part of Meta's Huntsville Campus in Alabama.
This facility is part of Meta's Huntsville Campus in Alabama.
This facility is part of Meta's Huntsville Campus in Alabama.
This facility is part of Meta's Huntsville Campus in Alabama.
This facility is part of Meta's Huntsville Campus in Alabama.
Meta has broken ground on its first Oklahoma data center at Fair Oaks Innovation Park in east Tulsa.
This facility is part of Meta's Project Domino in Lebanon, Indiana.
This facility is part of Meta's Project Domino in Lebanon, Indiana.
This facility is part of Meta's Project Domino in Lebanon, Indiana.
This facility is part of Meta's Project Domino in Lebanon, Indiana.
This facility is part of Meta's Project Domino in Lebanon, Indiana.
This facility is part of Meta's Project Domino in Lebanon, Indiana.
This facility is part of Meta's Project Domino in Lebanon, Indiana.
This facility is part of Meta's Project Domino in Lebanon, Indiana.
This facility is part of Meta's Project Domino in Lebanon, Indiana.
This facility is part of Meta's Project Domino in Lebanon, Indiana.
This facility is part of Meta's Project Domino in Lebanon, Indiana.
Meta’s $1.2 billion data center in Temple, Texas, is now operational and serving live traffic, representing the company's first facility featuring its new AI-optimized architecture.
This data center is a part of Meta's Prineville Campus in Oregon.
In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.
In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.
The company broke ground on the campus in 2010, and its first data center became operational in 2011. The Prineville site consists of a total of 4.6 million square feet of space.
Project Domino is planned to include 12 data center buildings along with a dedicated AI-Network facility, providing over 4.6 million square feet of compute infrastructure.
This facility is a part of Meta's Mesa Campus in Arizona.
DeKalb 1 is one half of the first H-shaped building on Meta's DeKalb, Illinois campus, which opened in November 2023.
Meta Platforms, formerly known as Facebook, operates a large data center campus in Altoona, Iowa, located at 100 Share Way NW.
This facility is part of Meta's El Paso data center campus in West Texas.
This facility is part of Meta's El Paso data center campus in West Texas.
This facility is part of Meta's El Paso data center campus in West Texas.
This facility is part of Meta's El Paso data center campus in West Texas.
This facility is part of Meta's El Paso data center campus in West Texas.
This facility is part of Meta's El Paso data center campus in West Texas.
This facility is part of Meta's El Paso data center campus in West Texas.
Meta is constructing a data center campus in El Paso near the Texas-New Mexico state line, utilizing an updated AI-first architectural design.
Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.
This facility is a part of Meta's Mesa Campus in Arizona.
Meta's proposed data center in Zeewolde, Netherlands was permanently cancelled in July 2022 after intense environmental and political opposition led to the project's zoning plan being struck down by the Council of State in September 2023.
Meta's second Luleå building and the first built with its Rapid Deployment Data Center design, using about 250 factory-built Emerson modules assembled on site from 2014.
This data center is a part of Meta's Eagle Mountain campus in Utah.
Meta's third and largest Luleå building, about 50,000 m² and 380 m long, built 2019-2021 by John Sisk & Son on land bought from Luleå kommun in 2018.
ODN5 was one of two further data hall buildings Meta planned on adjoining land at its Odense campus. Meta cancelled the project in December 2022 after earthworks and foundations had started.
Second building on Meta's Clonee campus, a mirror of CLN1 that shares its administration building.
ODN6 was the southern of two further data hall buildings Meta planned on adjoining land at its Odense campus, due to be built first. Meta cancelled the project in December 2022.
Western-section building on Meta's Clonee campus (RA/180671), sharing a 5,710 m² administration building with CLN6 and using StatePoint liquid cooling.
ODN2 is the west bar of the two original data hall buildings on Meta's Odense campus in Tietgenbyen, Denmark, sharing an administration building with ODN1.
This data center is a part of Meta's Prineville Campus in Oregon.
In 2026, Meta announced its fourth expansion plan for its data center campus in Eagle Mountain, Utah. This fourth expansion includes plans to build three new data center buildings.
In 2026, Meta announced its fourth expansion plan for its data center campus in Eagle Mountain, Utah. This fourth expansion includes plans to build three new data center buildings.
In 2026, Meta announced its fourth expansion plan for its data center campus in Eagle Mountain, Utah. This fourth expansion includes plans to build three new data center buildings.
Meta will be investing $800 million to develop a data center campus spanning almost 700,000 sq ft (65,030 sqm). The company expects the data center to be operational in 2026.
This data center is a part of Meta's Eagle Mountain campus in Utah.
North Carolina Data Center Corridor
Meta's Forest City cold storage building: three 25,000 sq ft data halls built for rarely accessed photos, with no UPS and one small standby generator.
This facility is part of Hyperscale OperatorInterested in this information?Contact us's data center campus in Montgomery County, Alabama.
This facility is part of Hyperscale OperatorInterested in this information?Contact us's $800 million data center campus in Montgomery County, Alabama.
This facility is part of Hyperscale OperatorInterested in this information?Contact us's data center campus in Montgomery County, Alabama.
This facility is part of Hyperscale OperatorInterested in this information?Contact us's data center campus in Montgomery County, Alabama.
The first of Meta's three Luleå buildings and its first data center outside the U.S. Built 2011-2013 by NCC, DPR and Fortis, the 290,000 sq ft building holds four data halls cooled by outside air.
The first data center building on Meta's Clonee campus: a single-storey, 25,400 m² building with four data halls, linked to CLN2 by a shared administration building. Facebook broke ground in April 2016.
The original plan called for 900,000 sqft data center space and a 70,000 office space. Facebook has since announced an expansion that will bring the complex to 2.6 million square feet. The first data center comes online in 2019.
This data center is a part of Meta's Altoona Campus in Iowa.
This data center is a part of Meta's Altoona Campus in Iowa.
This data center is a part of Meta's Prineville Campus in Oregon.
This data center is a part of Meta's Prineville Campus in Oregon.
ODN1 is one of the two original data hall buildings on Meta's Odense campus in Tietgenbyen, Denmark. It shares an administration building with ODN2, uses indirect evaporative air cooling and has 18 Caterpillar diesel generators.
Meta’s planned Davenport data center, filed through subsidiary Vemerald LLC, is a two-building campus of about 715,000 square feet on roughly 328–350 acres in north Davenport, Iowa.
This data center is a part of Meta's Prineville Campus in Oregon.
This data center is a part of Meta's Prineville Campus in Oregon.
North Carolina Data Center Corridor
The first data center on Meta's Forest City campus: a two-level building of about 370,000 sq ft with four data suites, each with its own air-handling penthouse. Facebook broke ground in November 2010.
This data center is a part of Meta's Gallatin Campus in Nashville.
DeKalb 2 is the second half of the first H-shaped building on Meta's DeKalb, Illinois campus, which opened in November 2023.
Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.
Meta Platforms Inc., through its subsidiary Jimnist LLC, has acquired over 200 acres of land in Rosemount located along County Road 42 and Blaine Avenue in February 2025.
Facebook data center campus in the White Oak Technology Park will use solar power and 100 percent renewable energy.
Western-section building on Meta's Clonee campus (RA/180671), sharing a 5,710 m² administration building with CLN5 and using StatePoint liquid cooling.
Third building on Meta's Clonee campus: a single-bar building with its own administration and distribution space.
ODN3 is the third data hall building on Meta's Odense campus in Tietgenbyen, Denmark: a single bar of nearly 30,000 m² that Meta started in October 2020.
This facility is a part of Meta's Mesa Campus in Arizona.
Facebook data center campus in the White Oak Technology Park will use solar power and 100 percent renewable energy.
This data center is a part of Meta's Altoona Campus in Iowa.
Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.
Facebook data center campus in the White Oak Technology Park will use solar power and 100 percent renewable energy.
Meta, the parent company of Facebook, announced it will build an $800 million data center in Rosemount.
In 2025, Meta Platforms (formerly known as Facebook) launched a data center campus in Kansas City, Missouri, located at 801 NW 128th Street.
Meta, the social media giant, is investing $800 million to develop its newest data center campus in Aiken County, South Carolina.
This data center is a part of Meta's Altoona Campus in Iowa.
This data center is a part of Meta's Altoona Campus in Iowa.
This data center is a part of Meta's Altoona Campus in Iowa.
This data center is a part of Meta's Altoona Campus in Iowa.
This data center is a part of Meta's Prineville Campus in Oregon.
DeKalb 3 is the third building on Meta's DeKalb, Illinois campus, part of the expansion beyond the first H-shaped building.
This data center is a part of Meta's Altoona Campus in Iowa.
This data center is a part of Meta's Prineville Campus in Oregon.
This data center is a part of Meta's Prineville Campus in Oregon.
This data center is a part of Meta's New Albany Campus in Ohio.
This data center is a part of Meta's New Albany Campus in Ohio.
This data center is a part of Meta's Eagle Mountain campus in Utah.
This data center is a part of Meta's Gallatin Campus in Nashville.
In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.
This facility is a part of Meta's Mesa Campus in Arizona.
North Carolina Data Center Corridor
The third and largest data center on Meta's Forest City campus, about 480,000 sq ft. Facebook announced it in October 2015 with more than $200 million of investment.
This data center is a part of Meta's New Albany Campus in Ohio.
Facebook, is looking to expand its data center campus outside Richmond, Virginia.
Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.
This data center is a part of Meta's New Albany Campus in Ohio.
Meta is building its first Canadian data centre, a gigawatt-scale AI campus on about 1,750 acres in Sturgeon County, northeast of Edmonton. It is Meta's 33rd data centre worldwide.
Meta is building a 715,000 sq ft (66,425 sqm) data center campus in Cheyenne, Wyoming.
Meta is building a 715,000 sq ft (66,425 sqm) data center campus in Cheyenne, Wyoming.
The Bowling Green Data Center, a 715,000-square-foot (66,425 sqm) facility, is being built on a 280-acre site in Middleton Township, Wood County.
October 29, 2026 Richmond
Google is considering a 1,200MW data center campus on about 1,000 acres in Goochland County, Virginia, the county confirmed on Oct. 28. The county's announcement named Google as the company behind a project that appeared in Virginia regulatory filings in July without an identified owner. Google...
Read more
October 26, 2026 Finland
Finland's Licensing and Supervision Authority has told Google subsidiary Tuike Finland to keep preparatory work at its Muhos and Kajaani data center sites suspended. The agency set an Oct. 23 deadline for felling, excavation, blasting and road building to stop at both sites, according to its...
Read more
October 26, 2026 Dallas
Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94.4 million, Forum Edge AI said on Oct. 26, reflecting GPU capacity and associated CPU management node...
Read more
October 23, 2026 Singapore
ZTE launched the ZXEDC M8000 Intelligent Computing Micro-Module at Data Center World Asia in Singapore, an integrated IT pod built for AI data centers. The company announced the product in a release published Oct. 20 (ZTE). The module combines an enclosed cold aisle, liquid-cooled racks, network...
Read more
October 22, 2026 Atlanta
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...
Read more
October 21, 2026 Ohio
Cleveland City Council voted on the night of Oct. 19 to extend the city's moratorium on new data centers through Jan. 29, 2027, or until council enacts permanent rules. The extension keeps zoning permits and occupancy certificates frozen for new standalone data centers and also covers expansions...