Cloud PointInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Social Circle, GA 30025
Operational
Fully operational facility
Operated by:

Meta Newton Campus (Atlanta)

Short Code: Building 1
Year Built: 2021
Utility Provider: Walton Electric Membership Corporation (EMC)
Floors: 2

Sites on this Campus:

  • Central PlazaInterested in this information?Contact us
  • GlobalInterested in this information?Contact us
  • Park BetaInterested in this information?Contact us
  • BetaInterested in this information?Contact us
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023. It is powered by 100 percent clean and renewable energy and cooled using outside air.
The data complex stands at Stanton Springs near the Shire pharmaceutical plant along I-20, about 40 miles east of Atlanta.

Solar Power:

  • 102.5 megawatt solar farm in Blakely came online in 2019
  • 107 megawatt Snipesville II in Denton, GA came online in 2021

Map and Nearby Locations

This Facility
Meta Sites
Nearby Facilities

CampusInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Metro PlazaInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Metro CampusInterested in this information?Contact us
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
NN milesInterested in this information?Contact us Edge StationInterested in this information?Contact us
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
NN milesInterested in this information?Contact us Global CenterInterested in this information?Contact us
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
NN milesInterested in this information?Contact us AlphaInterested in this information?Contact us
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
NN milesInterested in this information?Contact us Newton County Expansion
NN milesInterested in this information?Contact us Newton County Technology Park.
The proposed development could reach 2.56 million square feet (237,830 square meters) at full capacity, spread across nine buildings.
NN milesInterested in this information?Contact us Sailfish Investors: Social Circle Expansion
NN milesInterested in this information?Contact us Sailfish Investors: Social Circle, GA
Sailfish Investors, a real estate investment and operating platform, aims to develop a 1.78 million sq ft data center site along Social Circle Parkway.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Founded in 2004, Facebook needs no introduction as the world's largest social network. All the status updates, family photos and videos add up and create a need for a massive amount of storage and compute. Facebook maintains a growing stable of data centers spread across the world.

0
Facilities
0
Markets

News See all

Read Meta Signs for GPU Capacity at Firmus AI Factories in Southeast Asia
[Meta](https://baxtel.com/data-centers/meta) has signed strategic AI infrastructure agreements with Australian AI factory developer [Firmus Technologies](https://baxtel.com/data-centers/firmus-tech...

Meta Signs for GPU Capacity at Firmus AI Factories in Southeast Asia

September 30, 2026 Firmus Technologies

Meta has signed strategic AI infrastructure agreements with Australian AI factory developer Firmus Technologies for GPU compute capacity at Firmus sites across Southeast Asia, the companies announced Tuesday. The agreements cover contracted capacity plus options to expand, and Capital Brief...

Read more
Read Meta Signs Deal to Use AI Capacity at Firmus Data Centers in Southeast Asia
Meta has agreed to lease AI compute capacity from Australian neocloud Firmus across its upcoming Southeast Asian data centers. The deal expands an existing partnership under which Meta leases Nvidi...

Meta Signs Deal to Use AI Capacity at Firmus Data Centers in Southeast Asia

September 30, 2026 Meta

Meta has agreed to lease AI compute capacity from Australian neocloud Firmus across its upcoming Southeast Asian data centers. The deal expands an existing partnership under which Meta leases Nvidia GB300 NVL72 capacity at Firmus’ Melbourne facility. Firmus is developing AI factories with DayOne...

Read more
Read Meta’s $1.2B Data Center In Kuna, Idaho, Goes Live
Meta’s Kuna, Idaho Data Center Is Now Operational Meta has begun serving traffic from its data center in Kuna, Idaho. The company announced the campus in 2022, initially planning to invest $800 mil...

Meta’s $1.2B Data Center In Kuna, Idaho, Goes Live

September 04, 2026 Meta

Meta’s Kuna, Idaho Data Center Is Now Operational Meta has begun serving traffic from its data center in Kuna, Idaho. The company announced the campus in 2022, initially planning to invest $800 million in a 960,000 sq ft (89,187 sqm) facility. The project was later temporarily paused for redesign...

Read more
Read Meta Expands Louisiana Data Center Campus To 5GW
Meta plans to more than double its Richland Parish, Louisiana, data center campus to 5GW of capacity. The site, known as the Hyperion data center project, was previously planned as a 2GW developmen...

Meta Expands Louisiana Data Center Campus To 5GW

July 13, 2026 Meta

Meta plans to more than double its Richland Parish, Louisiana, data center campus to 5GW of capacity. The site, known as the Hyperion data center project, was previously planned as a 2GW development. Announced in late 2024, Hyperion was originally designed as a 4 million sq ft (372,000 sqm)...

Read more
Read Meta Plans $9.17 Billion Gigawatt-Scale Data Center in Alberta, Canada
Meta is planning a 1GW data center in Sturgeon County, Alberta, marking the company’s first facility in Canada. The project represents a CA$13 billion (US$9.17 billion) investment and could scale u...

Meta Plans $9.17 Billion Gigawatt-Scale Data Center in Alberta, Canada

July 09, 2026 Meta

Meta is planning a 1GW data center in Sturgeon County, Alberta, marking the company’s first facility in Canada. The project represents a CA$13 billion (US$9.17 billion) investment and could scale up to 1.8GW of capacity. The AI-focused facility will use a closed-loop liquid cooling system and is...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?