Colocation Austin - Data Centers

Latest Podcast

The Austin data center market is located in the state of Texas within Americas. Austin has 113 facilities.

The top providers in Austin are Riot Platforms (1 site) and BitDeer with 2 facilities . The most popular facilities are Sabey Austin 1A and Switch: Texas 1.

Read More

Market Facts

Austin Data Center Map

Austin Power Growth Over Time

+50% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Data Centers in Austin

Name Company Size Status Type
LOGIX Austin (1905 E 6th) LOGIX Fiber Networks Small Operational Carrier
CyrusOne Austin I CyrusOne Small Operational Carrier-Neutral
CyrusOne Austin II CyrusOne Small Operational Carrier-Neutral
CyrusOne: Austin III CyrusOne Medium Operational, Planned Carrier-Neutral
DataBank Austin AUS1 DataBank Extra Small Operational Carrier-Neutral
Digital Realty: AUS11 Digital Realty Trust Small Operational Carrier-Neutral
7620 Metro - Digital Realty Digital Realty Trust Small Operational Carrier-Neutral
7401 E Ben White - Digital Realty Digital Realty Trust Small Operational Carrier-Neutral
EdgeConneX: AUS01 EdgeConneX Large Construction Carrier-Neutral
EdgeConneX: AUS02 EdgeConneX Large Planned Carrier-Neutral
EdgeConneX: AUS03 EdgeConneX Large Planned Carrier-Neutral
EdgeConneX: AUS04 EdgeConneX Large Planned Carrier-Neutral
EdgeConneX: AUS11 EdgeConneX Large Construction Carrier-Neutral
EdgeConneX: AUS12 EdgeConneX Large Construction Carrier-Neutral
Lumen Austin 1 (4207 Smith School) Lumen Technologies Small Operational Carrier
Lumen Austin 3 (500 Chicon) Lumen Technologies Extra Small Operational Carrier
Lumen Austin 4 Lumen Technologies Extra Small Operational Carrier
Sabey Austin 1A Sabey Data Centers Medium Operational Carrier-Neutral
Sabey: Austin 1B Sabey Data Centers Large Construction, Planned Carrier-Neutral
Sabey: San Macros, TX Sabey Data Centers Withdrawn Carrier-Neutral
Verizon: 2100 HWY 35 Verizon Enterprise Extra Small Operational Carrier
Verizon: 11501 Domain Verizon Enterprise Extra Small Operational Carrier
Switch: Austin 1 (ADC) Switch Small Operational Carrier-Neutral
Switch: Texas 1 Switch Small Operational, Planned Carrier-Neutral
Switch: Texas 2 Switch Medium Operational, Planned Carrier-Neutral
Switch Austin "The Rock" Switch Large Operational Carrier-Neutral
Switch: Texas 3 Switch Medium Planned Carrier-Neutral
Switch: Round Rock East Campus Switch Large Planned Carrier-Neutral
Switch: AUS05 EVO DC Switch Medium Construction Carrier-Neutral
DataCanopy: Austin, TX DataCanopy Extra Small Operational, Planned Carrier-Neutral
Iron Mountain Hutto Iron Mountain Extra Large Planned Carrier-Neutral
Skybox: Austin 1 Skybox Datacenters Medium Operational Carrier-Neutral
Skybox: Hutto 1 Skybox Datacenters Large Operational Carrier-Neutral
Skybox: Austin 2 Skybox Datacenters Medium Operational Carrier-Neutral
Skybox: Hutto 2 Skybox Datacenters Large Construction Carrier-Neutral
Skybox: Hutto 3 Skybox Datacenters Large Construction Carrier-Neutral
Skybox: Hutto 4 Skybox Datacenters Extra Large Construction Carrier-Neutral
Skybox: Hutto 5 Skybox Datacenters Extra Large Planned Carrier-Neutral
Skybox: Hutto 6 Skybox Datacenters Extra Large Planned Carrier-Neutral
Skybox: Round Rock, TX Skybox Datacenters Large Construction Carrier-Neutral
LightEdge Austin1 Montopolis LightEdge Solutions Extra Small Operational Carrier-Neutral
LightEdge Austin2 Burleson LightEdge Solutions Small Operational, Planned Carrier-Neutral
Highlander SM One: San Marcos, TX Unknown Company Withdrawn Real Estate
Element Critical Austin Element Critical Small Operational, Planned Carrier-Neutral
Element Critical: Austin 2 Element Critical Small Planned, Prospective Expansion Carrier-Neutral
Valley ProInterested in this information?Contact us Meta Extra Large Construction, Operational Hyperscale
Citigroup: Georgetown Citigroup Small Operational Fintech
Campus PrimeInterested in this information?Contact us Google Large Operational Hyperscale
Core ParkInterested in this information?Contact us Google Large Construction Hyperscale
NorthInterested in this information?Contact us Google Large Construction Hyperscale
Prime: AUS01-01 Prime Data Centers Large Construction Carrier-Neutral
Prime: AUS01-02 Prime Data Centers Large Planned Carrier-Neutral
Prime: AUS01-03 Prime Data Centers Large Planned Carrier-Neutral
Prime: AUS01-04 Prime Data Centers Large Planned Carrier-Neutral
Prime: AUS01-05 Prime Data Centers Large Planned Carrier-Neutral
Prime: AUS01-06 Prime Data Centers Large Planned Carrier-Neutral
Prime: AUS01-07 Prime Data Centers Large Planned Carrier-Neutral
Prime: AUS01-08 Prime Data Centers Large Planned Carrier-Neutral
West PlazaInterested in this information?Contact us Amazon AWS Large Operational Hyperscale
Point ThreeInterested in this information?Contact us Amazon AWS Land Bank Hyperscale
American Tower: Austin American Tower Corporation Extra Small Operational Carrier-Neutral
Colovore: Hutto AUS01 Colovore Large Planned Carrier-Neutral
Rowan: Moriah DC Rowan Digital Infrastructure Decommissioned Carrier-Neutral
Rowan: AUS01 Rowan Digital Infrastructure Large Construction Carrier-Neutral
Rowan: AUS02 Rowan Digital Infrastructure Large Construction Carrier-Neutral
Rowan: AUS03 Rowan Digital Infrastructure Large Planned Carrier-Neutral
PlazaInterested in this information?Contact us Riot Platforms Extra Large Operational Crypto Miner Hosting
Core Scientific: Austin, TX Core Scientific Medium Operational HPC
CoreWeave: Austin, TX CoreWeave Medium Operational, Planned Neocloud
PowerHouse: Austin PowerHouse Data Centers Land Bank Carrier-Neutral
Edged Energy: Martindale 1 Edged Energy Extra Large Construction Carrier-Neutral
Edged Energy: Martindale 2 Edged Energy Extra Large Planned Carrier-Neutral
BitDeer: Rockdale, TX BitDeer Extra Large Construction, Operational HPC
BitDeer: Milam County, TX BitDeer Land Bank HPC
Tract: Caldwell Valley Tract Extra Large Planned, Prospective Expansion Real Estate
Tesla: Austin Dojo Tesla Extra Large Operational, Planned Enterprise
KDC: Comal 1 KDC Real Estate Development & Investments Large Construction Real Estate
KDC: Comal 2 KDC Real Estate Development & Investments Large Planned Real Estate
KDC: Comal 3 KDC Real Estate Development & Investments Large Planned Real Estate
KDC: Comal 4 KDC Real Estate Development & Investments Large Planned Real Estate
KDC: Comal 5 KDC Real Estate Development & Investments Large Planned Real Estate
KDC: Comal 6 KDC Real Estate Development & Investments Large Planned Real Estate
Plaza PlusInterested in this information?Contact us OpenAI Construction Hyperscale
CloudBurst: San Marcos 1 CloudBurst Data Centers, Inc. Large Construction Carrier-Neutral
CloudBurst: San Marcos 2 CloudBurst Data Centers, Inc. Large Construction Carrier-Neutral
CloudBurst: San Marcos 3 CloudBurst Data Centers, Inc. Large Construction Carrier-Neutral
CloudBurst: San Marcos 4 CloudBurst Data Centers, Inc. Large Construction Carrier-Neutral
CloudBurst: San Marcos 5 CloudBurst Data Centers, Inc. Large Planned Carrier-Neutral
CloudBurst: San Marcos 6 CloudBurst Data Centers, Inc. Large Planned Carrier-Neutral
CloudBurst: San Marcos 7 CloudBurst Data Centers, Inc. Large Planned Carrier-Neutral
CloudBurst: San Marcos 8 CloudBurst Data Centers, Inc. Large Planned Carrier-Neutral
CloudBurst: San Marcos 9 CloudBurst Data Centers, Inc. Large Planned Carrier-Neutral
CloudBurst: San Marcos 10 CloudBurst Data Centers, Inc. Large Planned Carrier-Neutral
CloudBurst: San Marcos 11 CloudBurst Data Centers, Inc. Large Planned Carrier-Neutral
CloudBurst: San Marcos 12 CloudBurst Data Centers, Inc. Large Planned Carrier-Neutral
Connect Data Centers: Temple 1 Connect Data Centers Small Construction Real Estate
Connect: Temple 2 Connect Data Centers Large Construction, Planned Real Estate
Blueprint: Taylor DC Blueprint Data Centers In Doubt Carrier-Neutral
Blueprint: Georgetown DC Blueprint Data Centers Medium Construction Carrier-Neutral
BlackChamber: Project Longhorn Building 1 BlackChamber Group Extra Large Planned Real Estate
BlackChamber: Project Longhorn Expansion BlackChamber Group Extra Large Land Bank, Planned, Prospective Expansion Real Estate
University of Texas: Austin University of Texas Extra Small Operational Education
Prominent Property: Jarrell 1 Prominent Property Group Medium Planned Real Estate
Prominent Property: Jarrell Expansion Prominent Property Group Extra Large Planned Real Estate
Zydeco Development: Hutto, Texas Zydeco Development Withdrawn Real Estate
ValleyInterested in this information?Contact us Ocean Blockchain Extra Large Operational Crypto Miner Hosting
Onmine: Killeen, Texas Onmine In Doubt Energy
AMD: Rockdale, TX AMD Large Construction, Operational, Planned, Prospective Expansion Carrier-Neutral
SB Energy: Milam County 1 SB Energy Extra Large Construction Real Estate
SB Energy: Milam County 2 SB Energy Extra Large Construction Real Estate
SB Energy: Cosmos Tech Campus SB Energy Large Construction Real Estate
Yarrington: Palomino Alpha Yarrington Land In Doubt Real Estate

Largest Providers in Austin

Riot Platforms
Site
Power
Operational
1
700.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
BitDeer
Site
Power
Operational
1
563.0
Construction
1
Planned
0
Prospective Expansion
0
Land Bank
1
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider
SB Energy
Site
Power
Operational
0
0.0
Construction
3
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
3
View Provider
Skybox Datacenters
Site
Power
Operational
3
108.0
Construction
4
Planned
2
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
7
View Provider

Largest Data Centers in Austin

Location About Total SqFt Power (MW)
PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset
BitDeer: Rockdale, TX
Bitdeer operates its long-standing Rockdale data center at the former Alcoa industrial complex an...
NN Request Dataset
Valley ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset
RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset NN Request Dataset
Tesla: Austin Dojo
Data center is reportedly on the South Side of the massive Tesla Gigafactory.
NN Request Dataset

Sites Under Construction in Austin

Location Building SqFt Power (MW) Estimated Launch
Skybox: Round Rock, TX 250,000 SqFt 75 Megawatts
EdgeConneX: AUS12 730,000 SqFt 100 Megawatts
EdgeConneX: AUS11 730,000 SqFt 100 Megawatts
EdgeConneX: AUS01 578,000 SqFt 96 Megawatts Q2 2027
Rowan: AUS02 500,000 SqFt 100 Megawatts
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030

Data Center Events in Austin See all

5 events
Event Starts in Details
65 days
View ERCOT Power NEXT 2027
Organized by:
Infocast
Type:
Data Center Power
Description:

ERCOT Power NEXT is a three-day executive power and energy conference organized by Infocast, taking place January 25–27, 2027, at the Hilton Austin in Austin, Texas. Expanding on Infocast's long-running ERCOT Market Summit, the event convenes more than 800 participants and over 115 speakers across 29 sessions. Attendees include wholesale power generators, electric utilities, ERCOT officials, st...

283 days
View Datacloud USA x Metro Connect Fall 2027
Organized by:
Datacloud
Type:
Data Center Telecom & Networks
Description:

Datacloud USA x Metro Connect Fall is an executive digital infrastructure conference co-located with Metro Connect Fall, uniting the data center, cloud, and fiber sectors. Organized by Datacloud, the 2027 edition takes place from August 31 through September 2, 2027, at the Fairmont Austin in Austin, Texas, with pre-conference activities opening on August 30. The gathering convenes approximately...

296 days
View ACP RECHARGE: Energy Storage Conference 2027
Organized by:
American Clean Power Association
Type:
Power
Description:

ACP RECHARGE is the annual energy storage conference of the American Clean Power Association (ACP). The 2027 edition takes place September 13 to 15, 2027, at the Austin Marriott Downtown in Austin, Texas. Registration for 2027 has not opened yet. The 2026 edition, held in Aurora, Colorado, drew 600 attendees, more than 75 speakers, and 15 exhibitors. Programming Focus The 2027 program has not b...

317 days
View GCPA Fall Conference 2027
Organized by:
Gulf Coast Power Association
Type:
Data Center Power
Description:

The Gulf Coast Power Association's Fall 2027 Conference runs October 4 to 6, 2027, at the AT&T Hotel & Conference Center in Austin, Texas. It is GCPA's largest yearly meeting on ERCOT and Gulf Coast power markets. Registration opens in summer 2027. No agenda, speakers, or sponsors are published yet. The 2025 fall conference drew 875 attendees, and the 2026 edition projected 850+. Programming Fo...

681 days
View GCPA Fall Conference 2028
Organized by:
Gulf Coast Power Association
Type:
Data Center Power
Description:

The Gulf Coast Power Association has scheduled its Fall 2028 Conference for October 2 to 4, 2028, in Austin, Texas. GCPA has not announced a venue, agenda, or registration date. Its 2025, 2026, and 2027 fall conferences use the AT&T Hotel & Conference Center. The fall meeting is GCPA's largest, with 875 attendees in 2025. Who Should Attend Data center developers and operators active in Texas Ut...

About This Metro

Austin Data Center Providers

  • Data Foundry is a local headquartered provider that also dominates in the market. Data Foundry has 3 sites, although we count it as 2 since two of the datacenters are on the same campus. 

    • Data Ranch (Texas 1 and Texas 2)
    • Austin 1
  • CyrusOne has 2 sites on the West side of Austin

Get Quotes

Related News See all

Read Blackstone Digital Infrastructure Trust Buys 75% of AWS Joint Ventures for $5B
[Blackstone Digital Infrastructure Trust](https://www.sec.gov/Archives/edgar/data/2100161/000119312526461954/d115778dex991.htm) has agreed to buy a majority stake in two Amazon Web Services data ce...

Blackstone Digital Infrastructure Trust Buys 75% of AWS Joint Ventures for $5B

November 17, 2026 Amazon AWS

Blackstone Digital Infrastructure Trust has agreed to buy a majority stake in two Amazon Web Services data center joint ventures for about $5 billion. The trust takes a 75% interest in the ventures, which own 13 newly constructed powered shells, and Amazon Web Services keeps the remaining 25%....

Read more
Read TensorWave Signs Six-Year Deal To Supply OpenAI 457MW of AMD Capacity
TensorWave has signed a six-year agreement to supply OpenAI with 457MW of dedicated AI capacity across multiple [United States](https://baxtel.com/regions/united-states) data center sites, [the com...

TensorWave Signs Six-Year Deal To Supply OpenAI 457MW of AMD Capacity

November 17, 2026 OpenAI

TensorWave has signed a six-year agreement to supply OpenAI with 457MW of dedicated AI capacity across multiple United States data center sites, the company said. TensorWave deploys and operates the infrastructure, and OpenAI takes the full deployment as a single tenant under the contract. The...

Read more
Read Google Signs 50MW Superhot Geothermal PPA With Quaise in Oregon
Google will buy 50MW of superhot geothermal power from Quaise Energy's Project Obsidian in Central Oregon under a [power purchase agreement](https://www.quaise.com/news/quaise-energy-signs-50-mw-ge...

Google Signs 50MW Superhot Geothermal PPA With Quaise in Oregon

November 17, 2026 Google

Google will buy 50MW of superhot geothermal power from Quaise Energy's Project Obsidian in Central Oregon under a power purchase agreement announced Nov. 17. Quaise develops and operates Project Obsidian and will generate the electricity and sell it to Google under the agreement. The power is...

Read more
Read AWS Breaks Ground on $7 Billion Project Rise Campus in Indiana
Amazon Web Services has begun construction on its $7 billion Project Rise data center campus in Wheatfield, Indiana ([Times of Northwest Indiana](https://nwitimes.com/news/local/collection_3ea669e7...

AWS Breaks Ground on $7 Billion Project Rise Campus in Indiana

November 16, 2026 Amazon AWS

Amazon Web Services has begun construction on its $7 billion Project Rise data center campus in Wheatfield, Indiana (Times of Northwest Indiana). Jasper County planners cleared the project in June (Rensselaer Republican). Amazon Web Services is spending a combined $33 billion on Indiana data...

Read more
Read Core Scientific to Exit Bitcoin Mining as Colocation Billing Reaches 485MW
Core Scientific plans to end Bitcoin mining by the end of 2026 and operate only as a high-density colocation provider in 2027. The Nasdaq-listed operator said in its [third-quarter 2026 results](ht...

Core Scientific to Exit Bitcoin Mining as Colocation Billing Reaches 485MW

November 16, 2026 Core Scientific

Core Scientific plans to end Bitcoin mining by the end of 2026 and operate only as a high-density colocation provider in 2027. The Nasdaq-listed operator said in its third-quarter 2026 results that it billed 485MW of colocation capacity at September 30, up from 395MW at the end of June....

Read more
Read Core Scientific Files $1.3B Plan for 285MW Hunt County Data Center
Core Scientific has registered a $1.3 billion plan to build a data center building at its [285MW Hunt County campus](https://baxtel.com/data-center/core-scientific-hunt-county-tx) outside Dallas. T...

Core Scientific Files $1.3B Plan for 285MW Hunt County Data Center

November 16, 2026 Core Scientific

Core Scientific has registered a $1.3 billion plan to build a data center building at its 285MW Hunt County campus outside Dallas. The filing with the Texas Department of Licensing and Regulation covers a 341,326 sq ft core-and-shell building at 4852 County Road 3507 in Quinlan, about 53 miles...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...

Documents

Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.