Pace to Develop 100MW Data Center in Glasscock County, Texas
April 27, 2026
Texas
CoreWeave has secured an 8-year lease agreement with Core Scientific for a 118,000 square feet of compute space at 3301 Hibbetts Road in Austin, Texas. This facility will host CoreWeave's infrastructure and support its GPU cloud compute workloads. The deal is valued at over $100 million, with $97.8 million allocated for lease payments over the 8-year term.
| Distance | Site | About |
|---|---|---|
| 0.06 miles | Crypto Mining Data Center Request Dataset |
In 2024, Core Scientific acquired this facility in Austin, Texas. The site was formerly used to house Hewlett Packard's hosting business, including high-performance computing.
|
| 3.40 miles | LOGIX Austin (1905 E 6th) |
Acquired by LOGIX, the Alpheus site is east of Austin's central business district. Located on East 6th Street, it features a multiple carrier Internet backbone, dual backup power supplies
|
| 3.49 miles | Lumen Austin 3 (500 Chicon) |
|
| 3.99 miles | 7620 Metro - Digital Realty |
The Digital facility is on 11.28 acres of land and features a 62,000-sq-ft building. The data center is full, with 100% of the space occupied with long-term lease tenants but there is additional land build another 135,000 sq ft facility.
|
| 4.04 miles | CyrusOne Austin I |
Also known as the Austin Met Center. CyrusOne has announced that this facility will close. Customers will be moved to other CyrusOne sites in Austin.
|
| 4.12 miles | Switch: Austin 1 (ADC) |
Operated since 2003.
Austin 1 is located on the Southeast side of Austin, on Data Foundry’s Disaster Recovery Campus.
|
| 4.14 miles | 7401 E Ben White - Digital Realty |
7401 E. Ben White Blvd. is a three-building portfolio comprised of two single-story data centers and one single-story call center, which are located in southeast Austin.
|
| 4.28 miles | Tesla: Austin Dojo |
Data center is reportedly on the South Side of the massive Tesla Gigafactory.
|
| 4.29 miles | Digital Realty: AUS11 |
The building has 75,000 gross square feet with a 30-foot clearance height capable of supporting two floors inside the building. The site has diverse underground electrical ductbanks from a nearby substations. The facility offers access to seven fiber optic providers in close proximity to the building
|
| 4.42 miles | University of Texas: Austin |
The Texas Advanced Computing Center (TACC) on the Austin campus hosts a 26,000 sq ft Tier III data center.
|
| 4.49 miles | DPO: Texas |
Digital Power Optimization partners with Schneider for data centers at Texas wind farms.
|
| 4.71 miles | LightEdge Austin1 Montopolis |
OnRamp Staffs the site 24/7/365
Power Densities up to 30kW / Rack
Outside of 100 year and 500 Year Flood Plains
|
| 4.71 miles | Lumen Austin 4 | |
| 4.77 miles | CyrusOne Austin II |
Supports 250 wpsf with the ability to support over 1,000 wpsf
Raised Floor: 48"
|
| 4.80 miles | DataCanopy: Austin, TX |
Data Canopy's Austin, TX facility delivers exceptional connectivity and 100% power uptime within a state-of-the-art environment secured by industry-leading features.
|
| 4.80 miles | CyrusOne: Austin III |
CyrusOne's AUS3 data center is projected to be the company's largest facility in Austin, spanning 172,000 total square feet, which includes 120,000 square feet of colocation space (CSF) and over 25,000 square feet of Class A office space.
|
| 5.01 miles | Verizon: 2100 HWY 35 |
Former XO Communications site
|
| 5.29 miles | LightEdge Austin2 Burleson |
The site was formerly operated by OnRamp before being acquired in July 2018.
|
| 5.40 miles | Element Critical Austin |
In 2021, Element Critical acquired the building from vXchnge.
|
| 5.44 miles | Switch: Smith School Rd |
Switch Inc. reportedly intends to build a 300,000-square-foot (27,870 sqm) data center alongside a new Austin Energy substation.
|
| 5.61 miles | Switch: Texas 2 |
2nd building on the former Data Foundry Campus
|
| 5.63 miles | Switch: Texas 1 |
Built in 2011, Texas 1 resides on the Data Ranch. The 40-acre campus has plenty of expansion capability. The campus can grow to over 1 million sqft and 100 MW of power.
The first phase of Data Foundry's Texas 2 site was opened in 2018.
|
| 5.67 miles | American Tower: Austin |
In 2020, Communications infrastructure company American Tower launched its Edge data center in Austin, Texas.
|
| 5.74 miles | Lumen Austin 1 (4207 Smith School) | |
| 9.78 miles | Verizon: 11501 Domain |
Formerly an XO site
|
| 10.69 miles | EdgeConneX: Austin AUS01 |
Located in the tech-forward Cedar Creek area of Bastrop County, EdgeConneX AUS01 is the high-performance anchor of a massive new data center campus.
|
| 10.88 miles | EdgeConneX: AUS03 |
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
|
| 11.07 miles | EdgeConneX: AUS04 |
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
|
| 11.09 miles | EdgeConneX: AUS02 |
The upcoming AUS02 facility is designed as a massive two-story structure, set to encompass 578,000 square feet (approximately 54,000 square meters) of high-density data center space.
|
| 12.98 miles | DataBank Austin AUS1 |
|
| 14.93 miles | Skybox: Austin 2 |
Skybox and Prologis have developed a state-of-the-art data center at 2515 South Kenney Fort Boulevard in Pflugerville, representing a $548 million investment.
|
| 14.95 miles | Switch: Round Rock East Campus |
Switch is constructing a new data center facility in Rock Round, Texas, located outside of Austin. The site spans 32.48 acres and is situated north of Louis Henna Boulevard and east of Greenlawn Boulevard in the Rock Round area.
|
| 14.96 miles | Skybox Austin |
|
| 14.99 miles | Hyperscale Data Center Request Dataset |
Amazon operates a data center in the Round Rock area of Austin, Texas.
|
| 15.10 miles | Switch Austin "The Rock" |
First announced in 2021, Switch's 'The Rock' data center in Texas will span 1.5 million square feet (140,000 sqm), and was first approved by the local council in July 2021. The campus is on land adjacent to a number of Dell-owned facilities in Round Rock, Texas.
|
| 15.15 miles | Sabey Austin |
Sabey Austin is Sabey Data Centers' new purpose-built data center campus located at 1300 Louis Henna Blvd. The two-building campus, when complete, will offer 430,000 square feet of reliable colocation.
|
| 15.16 miles | Switch: 300 Dell Way |
Switch is building another data center in Round Rock on a plot east of South Mays Street and north of Dell Way. The data center will span 173,895 square feet of gross floor area.
|
| 15.30 miles | Sabey: Austin 1B |
Sabey Data Centers has begun construction on the second building at its Austin, Texas campus.
|
| 18.12 miles | Iron Mountain Hutto |
|
| 19.75 miles | Colovore: Hutto, TX |
Colovore is developing a liquid-cooled data center outside Austin, Texas, featuring a 180,000-square-foot (16,720-square-meter) data center and a 13,000-square-foot office complex.
|
CoreWeave is a specialized cloud provider, delivering a massive scale of GPU compute resources.
An NVIDIA Elite Cloud Solutions Provider for Compute and Visualization, CoreWeave builds cloud solutions for compute intensive use cases - VFX and Rendering, Machine Learning and AI, Batch Processing, and Pixel Streaming.
April 27, 2026
Texas
April 10, 2026
Texas
April 08, 2026
Texas
April 04, 2026
CoreWeave
April 02, 2026
Texas
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas