CyrusOne: Austin III

Latest Podcast
Bldg III
OperationalPlanned
Operational with future phases planned
Operated by:

CyrusOne: Austin III

Year Built: 2015
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

CyrusOne's AUS3 data center is projected to be the company's largest facility in Austin, spanning 172,000 total square feet, which includes 120,000 square feet of colocation space (CSF) and over 25,000 square feet of Class A office space.

Power


• Multiple levels of redundancy available within same footprint (e.g. N, 2N, Distributed Redundant)
• Two - 400MW capacity substations with dual underground, concrete encased feeds from electrical substations
• Multiple Mitsubishi 750kVA/750kW UPS systems; each power leg has two dedicated UPS systems with VRLA battery backup
• Dual input static transfer switches feed PDUs
• Scalable 2.25MW MTU generators dedicated to each power leg- 48-hour belly tank with each generator at full-load (longer run times at partial load).
• Containerized power rooms, featuring pre-installed and pre-tested UPS and switchgear equipment for faster time to market

Map and Nearby Locations:

Bldg III
CyrusOne Sites
Nearby Facilities

Sites within 15 miles of CyrusOne: Austin III

Distance Site About
0.18 miles DataCanopy: Austin, TX
Data Canopy's Austin, TX facility delivers exceptional connectivity and 100% power uptime within a state-of-the-art environment secured by industry-leading features.
0.20 miles CyrusOne Austin II
Supports 250 wpsf with the ability to support over 1,000 wpsf Raised Floor: 48"
0.51 miles LightEdge Austin2 Burleson
The site was formerly operated by OnRamp before being acquired in July 2018.
0.52 miles Digital Realty: AUS11
The building has 75,000 gross square feet with a 30-foot clearance height capable of supporting two floors inside the building. The site has diverse underground electrical ductbanks from a nearby substations. The facility offers access to seven fiber optic providers in close proximity to the building
0.67 miles 7401 E Ben White - Digital Realty
7401 E. Ben White Blvd. is a three-building portfolio comprised of two single-story data centers and one single-story call center, which are located in southeast Austin.
0.68 miles Switch: Austin 1 (ADC)
Operated since 2003. Austin 1 is located on the Southeast side of Austin, on Data Foundry’s Disaster Recovery Campus.
0.75 miles Switch: Smith School Rd
Switch Inc. reportedly intends to build a 300,000-square-foot (27,870 sqm) data center alongside a new Austin Energy substation.
0.76 miles CyrusOne Austin I
Also known as the Austin Met Center. CyrusOne has announced that this facility will close. Customers will be moved to other CyrusOne sites in Austin.
0.83 miles 7620 Metro - Digital Realty
The Digital facility is on 11.28 acres of land and features a 62,000-sq-ft building. The data center is full, with 100% of the space occupied with long-term lease tenants but there is additional land build another 135,000 sq ft facility.
0.86 miles Lumen Austin 4
0.86 miles LightEdge Austin1 Montopolis
OnRamp Staffs the site 24/7/365 Power Densities up to 30kW / Rack Outside of 100 year and 500 Year Flood Plains
0.90 miles Switch: Texas 2
2nd building on the former Data Foundry Campus
0.93 miles Switch: Texas 1
Built in 2011, Texas 1 resides on the Data Ranch. The 40-acre campus has plenty of expansion capability. The campus can grow to over 1 million sqft and 100 MW of power. The first phase of Data Foundry's Texas 2 site was opened in 2018.
0.98 miles Lumen Austin 1 (4207 Smith School)
3.13 miles Verizon: 2100 HWY 35
Former XO Communications site
3.95 miles LOGIX Austin (1905 E 6th)
Acquired by LOGIX, the Alpheus site is east of Austin's central business district. Located on East 6th Street, it features a multiple carrier Internet backbone, dual backup power supplies
4.00 miles Lumen Austin 3 (500 Chicon)
4.74 miles Crypto Mining Data Center Request Dataset
In 2024, Core Scientific acquired this facility in Austin, Texas. The site was formerly used to house Hewlett Packard's hosting business, including high-performance computing.
4.80 miles Hyperscale Data Center Request Dataset
CoreWeave has secured an 8-year lease agreement with Core Scientific for a 118,000 square feet of compute space at 3301 Hibbetts Road in Austin, Texas.
5.14 miles DPO: Texas
Digital Power Optimization partners with Schneider for data centers at Texas wind farms.
5.49 miles Tesla: Austin Dojo
Data center is reportedly on the South Side of the massive Tesla Gigafactory.
6.06 miles University of Texas: Austin
The Texas Advanced Computing Center (TACC) on the Austin campus hosts a 26,000 sq ft Tier III data center.
6.11 miles American Tower: Austin
In 2020, Communications infrastructure company American Tower launched its Edge data center in Austin, Texas.
9.33 miles EdgeConneX: Austin AUS01
Located in the tech-forward Cedar Creek area of Bastrop County, EdgeConneX AUS01 is the high-performance anchor of a massive new data center campus.
9.40 miles Element Critical Austin
In 2021, Element Critical acquired the building from vXchnge.
9.67 miles EdgeConneX: AUS03
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
9.77 miles EdgeConneX: AUS02
The upcoming AUS02 facility is designed as a massive two-story structure, set to encompass 578,000 square feet (approximately 54,000 square meters) of high-density data center space.
9.90 miles EdgeConneX: AUS04
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
13.54 miles Verizon: 11501 Domain
Formerly an XO site
16.31 miles DataBank Austin AUS1
19.19 miles Hyperscale Data Center Request Dataset
Amazon operates a data center in the Round Rock area of Austin, Texas.
19.44 miles Switch: Round Rock East Campus
Switch is constructing a new data center facility in Rock Round, Texas, located outside of Austin. The site spans 32.48 acres and is situated north of Louis Henna Boulevard and east of Greenlawn Boulevard in the Rock Round area.
19.49 miles Switch Austin "The Rock"
First announced in 2021, Switch's 'The Rock' data center in Texas will span 1.5 million square feet (140,000 sqm), and was first approved by the local council in July 2021. The campus is on land adjacent to a number of Dell-owned facilities in Round Rock, Texas.
19.58 miles Switch: 300 Dell Way
Switch is building another data center in Round Rock on a plot east of South Mays Street and north of Dell Way. The data center will span 173,895 square feet of gross floor area.
19.58 miles Skybox: Austin 2
Skybox and Prologis have developed a state-of-the-art data center at 2515 South Kenney Fort Boulevard in Pflugerville, representing a $548 million investment.
19.62 miles Skybox Austin
19.69 miles Sabey Austin
Sabey Austin is Sabey Data Centers' new purpose-built data center campus located at 1300 Louis Henna Blvd. The two-building campus, when complete, will offer 430,000 square feet of reliable colocation.
19.80 miles Prime: Austin 2
The facility is a part of Prime's Austin Data Center Campus in Texas.
19.82 miles Prime: Austin, TX
Prime Data Centers is building a $1.3 billion data center campus in Caldwell County, outside of Austin, Texas
19.83 miles Sabey: Austin 1B
Sabey Data Centers has begun construction on the second building at its Austin, Texas campus.
19.97 miles Prime: Austin 3
The facility is a part of Prime's Austin Data Center Campus in Texas.

CyrusOne: Austin III Data Center Photos (See all)

CyrusOne launched Austin-3 Data Center in 2015
Source: CyrusOne

Operating Company

Operated by:

CyrusOne is a data center owner, operator, and developer that manages more than 50 facilities, with its footprint concentrated in the U.S. and Europe. The company is based in Dallas and was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in a transaction valued at approximately 15 billion dollars including debt.

Its portfolio centers on hyperscale and enterprise colocation across multi-building campuses. CyrusOne has also pursued international growth initiatives alongside its core North American and European markets.

CyrusOne History:

  • March 2022: Taken private by funds managed by KKR and Global Infrastructure Partners in an approximately 15 billion dollar all-cash transaction including debt.
  • July 2015: Acquired Cervalis, adding four data centers and two disaster recovery sites in the New York metro.
  • July 2014: Acquired Cervalis
  • January 2013: Completed initial public offering on NASDAQ as a carve-out of Cincinnati Bell’s data center business.
  • June 2010: Cincinnati Bell acquired CyrusOne for approximately 525 million dollars.
  • 2000: Founded by David Ferdman.
118
Facilities
13
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?