Iron Mountain Hutto

Latest Podcast County Road 404
Planned
Future facility in planning stage
Operated by:

Iron Mountain Hutto

Site planned for 2030 and has expansions through 2033
Lot Size: 500 acres

A seven-building hyperscale data center campus is planned by Iron Mountain near Hutto, just outside Austin. The roughly 500-acre site along FM 3349 is being developed as a multi-phase campus with dedicated substation infrastructure to support large-scale deployments. This project marks Iron Mountain’s first major expansion into the Texas market and is aimed at accommodating hyperscale and AI-driven demand. Initial phases are expected to come online around 2030, with full buildout details still pending.

Map and Nearby Locations

County Road 404
Iron Mountain Sites
Nearby Facilities

Iron Mountain Hutto Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Iron Mountain Hutto

Distance Site About
3.68 miles Skybox: Hutto 5
Skybox Datacenters and Prologis are building a massive 600-megawatt campus near Austin, Texas which will offer up to 4 million square feet of data center space.
3.72 miles Skybox: Hutto 4
Skybox Datacenters and Prologis are building a massive 600-megawatt campus near Austin, Texas which will offer up to 4 million square feet of data center space.
3.76 miles Skybox: Hutto PowerCampus
Skybox Datacenters and Prologis are building a massive 600-megawatt campus near Austin, Texas which will offer up to 4 million square feet of data center space.
3.85 miles Skybox: Hutto 2
Skybox Datacenters and Prologis are building a massive 600-megawatt campus near Austin, Texas which will offer up to 4 million square feet of data center space.
3.95 miles Skybox: Hutto 7
Skybox Datacenters and Prologis are building a massive 600-megawatt campus near Austin, Texas which will offer up to 4 million square feet of data center space.
3.98 miles Skybox: Hutto 6
Skybox Datacenters and Prologis are building a massive 600-megawatt campus near Austin, Texas which will offer up to 4 million square feet of data center space.
4.95 miles KDC: Comal 4
This facility is part of KDC's 'Project Comal,' situated near Austin.
4.99 miles KDC: Comal 5
This facility is part of KDC's 'Project Comal,' situated near Austin.
5.03 miles KDC: Comal 6
This facility is part of KDC's 'Project Comal,' situated near Austin.
5.23 miles KDC: Project Comal
The Taylor City Council has approved "Project Comal," a data center campus to be built on a 220-acre site northeast of Austin.
5.27 miles KDC: Comal 2
This facility is part of KDC's 'Project Comal,' situated near Austin.
5.31 miles KDC: Comal 3
This facility is part of KDC's 'Project Comal,' situated near Austin.
5.64 miles Colovore: Hutto, TX
Colovore is developing a liquid-cooled data center outside Austin, Texas, featuring a 180,000-square-foot (16,720-square-meter) data center and a 13,000-square-foot office complex.
5.80 miles Zydeco Development: Hutto, Texas
Following the formal withdrawal of its rezoning application, Zydeco Development Corporation has halted plans for its proposed data center in Hutto, Texas.
7.38 miles Skybox Austin
7.48 miles Skybox: Austin 2
Skybox and Prologis have developed a state-of-the-art data center at 2515 South Kenney Fort Boulevard in Pflugerville, representing a $548 million investment.
8.59 miles Blueprint: Taylor DC
US data center firm Blueprint Data Centers is investing $10 billion to develop a 52-acre site.
8.79 miles Sabey Austin
Sabey Austin is Sabey Data Centers' new purpose-built data center campus located at 1300 Louis Henna Blvd. The two-building campus, when complete, will offer 430,000 square feet of reliable colocation.
8.91 miles Sabey: Austin 1B
Sabey Data Centers has begun construction on the second building at its Austin, Texas campus.
9.36 miles Switch: Round Rock East Campus
Switch is constructing a new data center facility in Rock Round, Texas, located outside of Austin. The site spans 32.48 acres and is situated north of Louis Henna Boulevard and east of Greenlawn Boulevard in the Rock Round area.
9.47 miles Skybox: Round Rock, TX
The Round Rock City Council has unanimously approved a rezoning request from Skybox Datacenters to develop a 30-acre facility in the Austin, Texas area.
10.05 miles Switch: 300 Dell Way
Switch is building another data center in Round Rock on a plot east of South Mays Street and north of Dell Way. The data center will span 173,895 square feet of gross floor area.
10.32 miles Switch Austin "The Rock"
First announced in 2021, Switch's 'The Rock' data center in Texas will span 1.5 million square feet (140,000 sqm), and was first approved by the local council in July 2021. The campus is on land adjacent to a number of Dell-owned facilities in Round Rock, Texas.
11.83 miles Cloud ParkInterested in this information?Contact us
Amazon operates a data center in the Round Rock area of Austin, Texas.
12.24 miles Blueprint: Georgetown DC
US data center firm Blueprint Data Centers is investing $160 million to develop a 10-acre data center in Georgetown.
13.19 miles Citigroup: Georgetown
The Georgetown site was launched in 2008 and is LEED Gold Certified.
14.65 miles Verizon: 11501 Domain
Formerly an XO site
15.48 miles Element Critical Austin
In 2021, Element Critical acquired the building from vXchnge.
16.30 miles DataBank Austin AUS1
18.12 miles CoreWeave: Austin, TX
CoreWeave has secured an 8-year lease agreement with Core Scientific for a 118,000 square feet of compute space at 3301 Hibbetts Road in Austin, Texas.
18.18 miles Core Scientific: Austin, TX
In 2024, Core Scientific acquired this facility in Austin, Texas. The site was formerly used to house Hewlett Packard's hosting business, including high-performance computing.
18.21 miles Core TowerInterested in this information?Contact us
Bastrop Project One, an active high-density cryptocurrency mining facility developed by Kevin Hsu (founder of Ocean Blockchain and AcroHash) in Elgin, Bastrop County, features a 150,000-square-foot footprint.
19.23 miles Tesla: Austin Dojo
Data center is reportedly on the South Side of the massive Tesla Gigafactory.
19.75 miles University of Texas: Austin
The Texas Advanced Computing Center (TACC) on the Austin campus hosts a 26,000 sq ft Tier III data center.

Operating Company

Operated by:

Iron Mountain Data Centers is the data center business of Iron Mountain Incorporated and operates sites in the United States and Europe, with an India platform built through its partnership with Web Werks. In January 2018 it closed the acquisition of IO Data Centers, adding facilities in Phoenix and Scottsdale, Arizona, Edison, New Jersey, and Columbus, Ohio. In May 2018 it acquired EvoSwitch Netherlands, expanding into the Amsterdam market, and in 2019 it added capacity in Amsterdam and London. In India, Iron Mountain formed a joint venture with Web Werks in 2021 and in April 2025 it announced full ownership and a rebrand to Iron Mountain Data Centers India. Iron Mountain Incorporated was founded in 1951.

Iron Mountain Data Centers History:

  • In April 2025, acquired the remaining stake in Web Werks and rebranded the India business to Iron Mountain Data Centers.
  • 2021: Formed a joint venture with Web Werks to develop and operate data centers in India.
  • May 2018: Acquired EvoSwitch Netherlands, expanding into the Amsterdam market.
  • January 2018: Closed the acquisition of IO Data Centers’ U.S. operations.
  • 1951: Iron Mountain Incorporated was founded.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Texas Grid Audit Pauses New Data Center Approvals Across ERCOT
Texas Governor Greg Abbott has ordered an audit of every data center advancing through ERCOT's interconnection process before additional projects can move forward. ERCOT has paused its Batch Zero l...

Texas Grid Audit Pauses New Data Center Approvals Across ERCOT

August 06, 2026 Texas

Texas Governor Greg Abbott has ordered an audit of every data center advancing through ERCOT's interconnection process before additional projects can move forward. ERCOT has paused its Batch Zero large-load review, creating a new schedule risk for developers. The order is serious, but it is not a...

Read more
Read PowerPlay AI and Sharon AI Plan 400MW Gas-Powered Data Centre in Texas
PowerPlay AI has unveiled plans for a 400MW behind-the-meter natural gas-powered AI data centre near Abilene, Texas, through a joint venture with neocloud provider Sharon AI. The companies said sit...

PowerPlay AI and Sharon AI Plan 400MW Gas-Powered Data Centre in Texas

July 30, 2026 Texas

PowerPlay AI has unveiled plans for a 400MW behind-the-meter natural gas-powered AI data centre near Abilene, Texas, through a joint venture with neocloud provider Sharon AI. The companies said site planning and land acquisition have been completed, with work now focused on securing gas supply...

Read more
Read Rowan Plans Second Building at Temple, Texas Data Centre Campus
US data centre firm Rowan has filed plans to expand its Temple, Texas campus. The company is proposing AUS02 Building 2 at 1855 Bob White Road in Bell County. The $780 million project will deliver ...

Rowan Plans Second Building at Temple, Texas Data Centre Campus

July 29, 2026 Texas

US data centre firm Rowan has filed plans to expand its Temple, Texas campus. The company is proposing AUS02 Building 2 at 1855 Bob White Road in Bell County. The $780 million project will deliver a 500,000 sq ft (46,451 sqm) single-storey facility. Construction is scheduled from August 2026 to...

Read more
Read Flexential Acquires 110 Acres Near Dallas for 108MW Data Centre Campus
Flexential has acquired 110 acres in Kaufman County, Texas, for its fourth and largest data centre development in the Dallas-Fort Worth area. Located in Talty, the first phase will deliver a 375,00...

Flexential Acquires 110 Acres Near Dallas for 108MW Data Centre Campus

July 28, 2026 Texas

Flexential has acquired 110 acres in Kaufman County, Texas, for its fourth and largest data centre development in the Dallas-Fort Worth area. Located in Talty, the first phase will deliver a 375,000 sq ft (34,840 sqm) facility with 36MW of capacity, supporting wholesale and multi-tenant...

Read more
Read Lawsuit Targets Vantage, VoltaGrid Over San Antonio Off-Grid Data Centre Project
Several environmental groups have threatened to sue Vantage Data Centers and VoltaGrid over two planned natural gas-powered off-grid data centres near San Antonio, Texas. The Environmental Integrit...

Lawsuit Targets Vantage, VoltaGrid Over San Antonio Off-Grid Data Centre Project

July 24, 2026 Texas

Several environmental groups have threatened to sue Vantage Data Centers and VoltaGrid over two planned natural gas-powered off-grid data centres near San Antonio, Texas. The Environmental Integrity Project, the Sierra Club, and Public Citizen allege the companies failed to obtain the required...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?