EdgeConneX

EdgeConneX is a data center provider specializing in providing colocation facilities to host content at the edge of the network. The company provide Space, Power & Connectivity for content, network, colocation, CDNs and service providers, as well as wireless carriers, telecommunications companies, and commercial property owners. EdgeConneX has created a new Edge for traditional networks offering superior performance and economics.

EdgeConneX Data Center Map

EdgeConneX Locations

The upcoming AUS02 facility is designed as a massive two-story structure, set to encompass 578,000 square feet (approximately 54,000 square meters) of high-density data center space.

The data center operator EdgeConneX has reportedly secured a 15-year lease for the Digital Ursus site with Greykite European Real Estate Fund I, its affiliates, and White Star Real Estate.

The EdgeConneX WAW02 facility, a hyperscale, carrier-neutral, Tier-3 designed data center offering N+1 configuration, launched in Warsaw, Poland, in 2022.

The site was acquired from Linxdatacenter in November 2018. The facility also offers connectivity to the neighboring LIM-Building ecosystem via a diverse fiber path.

Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.

In August 2022, EdgeConneX acquired an additional plot of land in Schiphol and planned to build the AMS07 facility.

  • Customer work spaces are available
  • Raised Floor: 30"
  • EdgeConnex has rights to adjacent space to accommodate expansion.

EdgeConneX's Amsterdam Campus is located in Schiphol-Rijk. The campus features both multi-tenant colocation and single-tenant facilities with over 34,000 sqm of total space.

EdgeConneX acquired a 45,000 sqm (484,375 sq ft) land parcel in Bekasi in December 2024. The site is adjacent to its existing Jakarta campus and will be used for expansion.

Copy
R

In Germany’s tightening data center market, EdgeConneX is making a strategic push into the Frankfurt metropolitan area with a proposed campus in Maintal.

The EdgeConneX data center campus in Cyberjaya (KUL2) will encompass nine buildings across 30 acres, offering the scalable capacity and power to accommodate a diverse range of customer needs in the future.

  • Customer work spaces are available
  • Raised Floor: 30"
  • EdgeConnex has rights to adjacent space to accommodate expansion.

Located in the tech-forward Cedar Creek area of Bastrop County, EdgeConneX AUS01 is the high-performance anchor of a massive new data center campus.

The proposed EdgeConneX data center project in Pickaway County, Ohio, involves the development of 680 acres of farmland in the village of Ashville.

Local officials in Ashville, Ohio, blocked the expansion of a proposed EdgeConneX data center in February 2026. Although the company owns an initial 200-acre plot, their request to annex an additional 490 acres was denied.

Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.

EdgeConnex initially built a 4,500sqm data centre (DUB01) in 2016 and later extended that facility further before adding a new 1,500sqm data hall in 2017.

EdgeConneX is building a massive data center campus on a 93-acre land parcel it has owned since 2017 through Loop 202 & Elliot Road LLC.

EdgeConnex ATL01 facility spans 29,527 square feet and features two data halls. Within this facility, 6,322 square feet of raised floor space is dedicated to tenant racks, allowing for flexible colocation and infrastructure deployment.

EdgeConneX EDCAMS06 data center is located in Schiphol-Rijk, Amsterdam. In August 2022, EdgeConneX began construction on its 6th data center in Schiphol, and in 2024 it came online.

EdgeConneX has broken ground on a 200MW AI-ready data center campus in Kyotanabe, Greater Osaka, Japan, spanning approximately 130,000 sqm (1.4 million sq ft). Construction began in March 2026, with the first 28MW phase expected online by early 2028, followed by phased expansion to full capacity.

This facility was acquired by EdgeConneX as part of its 2021 acquisition of Global Data Center (GDC), an Israel-based data centre operator.

EdgeConneX acquired land in the Neve Yamin Industrial Area in 2023, with plans to develop its fourth Israeli data centre on the site.

This facility was acquired by EdgeConneX as part of its 2021 acquisition of Global Data Center (GDC), an Israel-based data centre operator.

EdgeConneX and Aboitiz InfraCapital are partnering to build a network of hyperscale data centers in the Philippines, beginning with two facilities in metropolitan Manila.

  • Customer work spaces are available
  • Raised Floor: 30"
  • EdgeConnex has rights to adjacent space to accommodate expansion.

Located in Tianjin's Beichen District, this facility is part of Chayora's Tianjin Campus with a designed capacity of 3000-4000 racks.

The Chayora Tianjin Data Center Campus, launched October 2020, is China's first data center with full Uptime Institute Tier III certification for design, facility and operations.

Chayora is developing a new data center campus in Shanghai, China. The project, first unveiled in November 2021, will span 8.5 acres and feature three five-story buildings.

Located in Tianjin's Beichen District, this facility is part of Chayora's Tianjin Campus with a designed capacity of 3000-4000 racks.

TJ7, situated in Tianjin's Beichen District, is part of Chayora's Tianjin Campus. This data center facility may comprise 2 or 3 separate buildings and is designed to accommodate 2000-3000 racks.

Located in Tianjin's Beichen District, this facility is part of Chayora's Tianjin Campus with a designed capacity of 3000-4000 racks.

Located in Tianjin's Beichen District, this facility is part of Chayora's Tianjin Campus with a designed capacity of 3000-4000 racks.

Located in Tianjin's Beichen District, this facility is part of Chayora's Tianjin Campus with a designed capacity of 3000-4000 racks.

EdgeConneX Data Center Photos (See all)

Exterior View
Source: Baxtel
Yellow = EdgeConnex's data center
Pink = Space for lease
Space Adjacent to Existing Data Center
Source: Baxtel

Yellow = EdgeConnex's data center
Pink = Space for lease

Edgeconnex Sits Next to an Electrical Substation
Source: Baxtel
Outside of 4005 S Mendenhall Road
Source: Baxtel
EdgeConnex Dublin
Source: Baxtel
EdgeConnex at 1541 Pama Lane in Las Vegas
Source: Baxtel
The Pama Technology Center is a four building complex
Edgeconnex is located in the Pama Technology Center
Source: Baxtel

The Pama Technology Center is a four building complex

Outside of Edgeconnex Denver
Source: Baxtel
Satellite view of EdgeConnex at 1510 Prime West Parkway in Katy
Source: Google Maps
ATL02 Rendering
Source: Baxtel
ATL01 Rendering
Source: Baxtel
Edgeconnex in Southfield, MI
Source: Baxtel
Rendering of Edgeconnex Barcelona which is scheduled to be delivered in Q4 2021
Source: Baxtel
Plans to add DUB4 AND DUB5 and a Gas power generator plant
Source: Baxtel
Rendering of the GTN facility
Source: Baxtel
Edgeconnex Dublin Campus
Source: EdgeConneX
Data center development proposed at Jahnstrasse Campus in Heusenstamm
Source: Google Maps
EdgeConneX acquired an industrial building in Ohio
Source: EdgeConneX
EdgeConneX reportedly secured a 15-year lease for the Digital Ursus site
Source: Greykite
EdgeConneX acquired a 180-acre parcel near AUS01 in Bastrop, Texas.
Source: Bastrop CAD