Rowan: AUS02
Rowan: AUS02 is building 2 of 3 on Rowan Digital Infrastructure's Project Temple data center campus on Bob White Road in east Temple, Texas.
Rowan Digital Infrastructure is a US data center developer that designs and delivers hyperscale campuses for large cloud and AI customers. The company is part of Quinbrook Infrastructure Partners and began in 2020 as a joint venture with Birch Infrastructure, and has been referred to as Rowan Green Data.
Its current US pipeline includes three campuses at the Quantum Frederick park in Maryland, the Cinco campus near San Antonio, Texas, a site in Temple, Texas, and the Percheron campus in Oregon. Verified capacity figures include a 300 MW Percheron plan in Morrow County, Oregon, and a 300 MW Cinco campus in Medina County, Texas.
Rowan: AUS02 is building 2 of 3 on Rowan Digital Infrastructure's Project Temple data center campus on Bob White Road in east Temple, Texas.
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
Rowan: AUS03 is the third building planned on Rowan Digital Infrastructure's Project Temple campus in east Temple, Texas, on the site the City of Temple calls the Lasso Building.
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
This facility is one of the three data center buildings of Rowan Digital Infrastructure's Fredrick III campus in Maryland.
This facility is one of the three data center buildings of Rowan Digital Infrastructure's Fredrick III campus in Maryland.
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
Rowan Digital Infrastructure plans to develop a data center campus totaling 777,150 sq ft (72,200 sqm) across 151 acres in Frederick County, Maryland.
Bauxite III will span 591,913 sq ft (54,990 sqm) across a 55-acre site, comprising three data center buildings.
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
Bauxite II will span 822,620 sq ft (76,400 sqm) on a 111.5-acre site, comprising four data center buildings.
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
Rowan plans to develop a 1.125 million sq ft (104,515 sqm) data center complex totaling four buildings. Construction is slated to begin in 2024
Outside of Oregon and Temple, Rowan Green Data is planning a data center site in California named as Project Matterhorn.
Rowan Data Centers has announced plans for a campus in Forest Grove, Portland, OR. Preliminary plans for the Project Meriwether development call for 150 MW of capacity.
Project Pirate is Rowan Digital Infrastructure's planned second data center campus near Lytle in Medina County, across the road from its Cinco campus.
U.S. data center company Rowan Digital Infrastructure has started construction on its Cinco data center campus, a hyperscale project located near San Antonio, Texas.
Rowan: AUS01 is building 1 of 3 on Rowan Digital Infrastructure's Project Temple data center campus on Bob White Road in east Temple, Texas.
Former bitcoin mining data center in Temple's Synergy Park, Texas, that Rowan built for Rhodium. Rhodium left in late 2024, and Rowan began converting the building into a warehouse in January 2026.
Rowan: AUS04 is Rowan Digital Infrastructure's Project Stampede, a two-building data center campus under construction in Temple's Synergy Park, Texas.
Rowan: Ranger is Rowan Digital Infrastructure's Project Ranger, a planned single-building data center east of US 190 in Temple, Texas.
November 24, 2026 California
Proper Voltage launched the Salt Vault battery cabinet on Nov. 19, with sodium-ion cells from UNIGRID for data center uninterruptible power supply systems (GlobeNewswire). Proper Voltage, based in Carlsbad, California, designs and integrates the cabinet and supplies its battery operating system,...
Read more
November 17, 2026 Oregon
Google will buy 50MW of superhot geothermal power from Quaise Energy's Project Obsidian in Central Oregon under a power purchase agreement announced Nov. 17. Quaise develops and operates Project Obsidian and will generate the electricity and sell it to Google under the agreement. The power is...
Read more
November 16, 2026 Oregon
Oregon Representative Maxine Dexter introduced a bill to ban new data centers on federal lands managed by the U.S. Forest Service and the Interior Department. The Nov. 11 measure, H.R. 11002, is the Protecting Our Public Lands from Data Centers Act. It would block the development, sale, or...
Read more
November 03, 2026 California
California Resources and Bloom Energy signed a memorandum of understanding to jointly evaluate 1GW or more of solid-oxide fuel cell generation in California. The non-binding agreement names data centers, utilities, community choice aggregators, municipalities, and other industrial users as...
Read more
October 30, 2026 Austin
Sabey Data Centers has started a pilot using hydrotreated vegetable oil (HVO) as a diesel replacement in backup generators at its Austin campus. The company is testing the renewable fuel as the primary fuel source for those generators, according to Sabey's announcement. Sabey says the pilot...
Read more
October 28, 2026 California
PG&E's data center pipeline reached 12,870 MW in September, up from 12,710 MW at the end of June. The utility furnished the figures with its third-quarter 2026 earnings materials on October 22. Large load beyond an initial 1.8 GW sits on a list of work that will be delayed or deferred....
Read moreTell us what you're looking for. We respond within one business day.