Latest Podcast Street AddressInterested in this information?Contact us, Elgin, TX 77862
Operational
Fully operational facility
Operated by:

Ocean Blockchain: Bastrop Project

Year Built: 2024
░░░░░ Request Dataset MW
Operational Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Bastrop Project One, an active high-density cryptocurrency mining facility developed by Kevin Hsu (founder of Ocean Blockchain and AcroHash) in Elgin, Bastrop County, features a 150,000-square-foot footprint.

Map and Nearby Locations

This Facility
Ocean Blockchain Sites
Nearby Facilities

PointInterested in this information?Contact us Power Growth Over Time

+60% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Hub BetaInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us EdgeConneX: AUS04
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
NN milesInterested in this information?Contact us EdgeConneX: AUS11
EdgeConneX is developing two new 730,000 sq ft data centers, EDCAUS11 and EDCAUS12, in Bastrop County, Texas.
NN milesInterested in this information?Contact us EdgeConneX: AUS03
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
NN milesInterested in this information?Contact us EdgeConneX: AUS12
EdgeConneX is developing two new 730,000 sq ft data centers, EDCAUS11 and EDCAUS12, in Bastrop County, Texas.
NN milesInterested in this information?Contact us EdgeConneX: AUS02
The upcoming AUS02 facility is designed as a massive two-story structure, set to encompass 578,000 square feet (approximately 54,000 square meters) of high-density data center space.
NN milesInterested in this information?Contact us EdgeConneX: AUS01
Located in the tech-forward Cedar Creek area of Bastrop County, EdgeConneX AUS01 is the high-performance anchor of a massive new data center campus.
NN milesInterested in this information?Contact us Tesla: Austin Dojo
Data center is reportedly on the South Side of the massive Tesla Gigafactory.
NN milesInterested in this information?Contact us BlackChamber: Project Longhorn Expansion
Project Longhorn Expansion covers the future phases of BlackChamber's Project Longhorn campus in Cedar Creek, Bastrop County, about 26 miles southeast of downtown Austin. It includes a planned second building similar in size to Building One and room for two more buildings. Pacifico Energy is developing the campus's on-site gas-fired power plant.

Operating Company

Operated by:

Ocean Blockchain is a technology infrastructure provider specializing in high-performance, net carbon-neutral data centers and software solutions. The company provides hosting facilities and specialized equipment tailored for digital asset mining. Its purpose-built facilities are designed to offer infrastructure engineered specifically to support high-density hardware deployments.

0
Facilities
0
Markets

News See all

Read Sabey Data Centers Pilots HVO Diesel Replacement at Austin Data Center
[Sabey Data Centers](https://baxtel.com/data-centers/sabey-data-centers) has started a pilot using hydrotreated vegetable oil (HVO) as a diesel replacement in backup generators at its Austin campus...

Sabey Data Centers Pilots HVO Diesel Replacement at Austin Data Center

October 30, 2026 Sabey Data Centers

Sabey Data Centers has started a pilot using hydrotreated vegetable oil (HVO) as a diesel replacement in backup generators at its Austin campus. The company is testing the renewable fuel as the primary fuel source for those generators, according to Sabey's announcement. Sabey says the pilot...

Read more
Read Big Watt, PowerHouse Win Taylor Approval for 1GW Texas Data Center Campus
Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for the Taylor Technology Campus, a 664-acre hyperscale project immediat...

Big Watt, PowerHouse Win Taylor Approval for 1GW Texas Data Center Campus

October 15, 2026 PowerHouse Data Centers

Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for the Taylor Technology Campus, a 664-acre hyperscale project immediately east of the city that could reach one gigawatt of capacity. The joint venture announced the...

Read more
Read Big Watt, PowerHouse Win Approval for 1GW Behind-the-Meter Texas Campus
Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for Taylor Technology Campus, a 664-acre data center and power project e...

Big Watt, PowerHouse Win Approval for 1GW Behind-the-Meter Texas Campus

October 15, 2026 PowerHouse Data Centers

Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for Taylor Technology Campus, a 664-acre data center and power project east of the city that could reach one gigawatt of capacity. In a joint press release, the partners...

Read more
Read Taylor Approves 1GW Gas-Fired Data Center Campus for Big Watt, PowerHouse
Taylor City Council voted 5-0 on Oct. 8 to annex and approve a development agreement for Taylor Technology Campus, a 664-acre hyperscale project east of Taylor that Big Watt Digital and PowerHouse ...

Taylor Approves 1GW Gas-Fired Data Center Campus for Big Watt, PowerHouse

October 15, 2026 PowerHouse Data Centers

Taylor City Council voted 5-0 on Oct. 8 to annex and approve a development agreement for Taylor Technology Campus, a 664-acre hyperscale project east of Taylor that Big Watt Digital and PowerHouse Data Centers say could support up to one gigawatt. The partners announced the approval in a Business...

Read more
Read Project Longhorn Files $366M First Building at Anthropic-Linked Texas Campus
The first data center building at the 2,842-acre Cedar Creek campus being developed by [Pacifico Energy](https://baxtel.com/data-centers/pacifico-energy) and [BlackChamber Group](https://baxtel.com...

Project Longhorn Files $366M First Building at Anthropic-Linked Texas Campus

October 11, 2026 Pacifico Energy

The first data center building at the 2,842-acre Cedar Creek campus being developed by Pacifico Energy and BlackChamber Group is on file with the Texas Department of Licensing and Regulation. The October 7 filing, reported by Community Impact, outlines a $366 million building at the Bastrop...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.