HubInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Elgin, TX 77862
Operational
Fully operational facility
Operated by:

Ocean Blockchain: Bastrop Project

Year Built: 2024
░░░░ Request Dataset MW
Total Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Bastrop Project One, an active high-density cryptocurrency mining facility developed by Kevin Hsu (founder of Ocean Blockchain and AcroHash) in Elgin, Bastrop County, features a 150,000-square-foot footprint.

Map and Nearby Locations

This Facility
Ocean Blockchain Sites
Nearby Facilities

West ValleyInterested in this information?Contact us Power Growth Over Time

+60% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Station ProInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us EdgeConneX: AUS04
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
NN milesInterested in this information?Contact us EdgeConneX: AUS03
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
NN milesInterested in this information?Contact us EdgeConneX: Austin AUS12
EdgeConneX is developing two new 730,000 sq ft data centers, EDCAUS11 and EDCAUS12, in Bastrop County, Texas.
NN milesInterested in this information?Contact us EdgeConneX: Austin AUS11
EdgeConneX is developing two new 730,000 sq ft data centers, EDCAUS11 and EDCAUS12, in Bastrop County, Texas.
NN milesInterested in this information?Contact us EdgeConneX: AUS02
The upcoming AUS02 facility is designed as a massive two-story structure, set to encompass 578,000 square feet (approximately 54,000 square meters) of high-density data center space.
NN milesInterested in this information?Contact us EdgeConneX: Austin AUS01
Located in the tech-forward Cedar Creek area of Bastrop County, EdgeConneX AUS01 is the high-performance anchor of a massive new data center campus.
NN milesInterested in this information?Contact us Tesla: Austin Dojo
Data center is reportedly on the South Side of the massive Tesla Gigafactory.
NN milesInterested in this information?Contact us Central HubInterested in this information?Contact us
Amazon Data Services has further expanded its Texas footprint by acquiring 1,300 acres of land near Cedar Creek in Bastrop County, located roughly 30 miles southeast of Austin.

Operating Company

Operated by:

Ocean Blockchain is a technology infrastructure provider specializing in high-performance, net carbon-neutral data centers and software solutions. The company provides hosting facilities and specialized equipment tailored for digital asset mining. Its purpose-built facilities are designed to offer infrastructure engineered specifically to support high-density hardware deployments.

0
Facilities
0
Markets

News See all

Read AI Drives Environmental Concerns Over Rise in Data Center Growth Across Central Texas
AI Drives Environmental Concerns Over Rise in Data Center Growth Across Central Texas

AI Drives Environmental Concerns Over Rise in Data Center Growth Across Central Texas

February 13, 2025 Austin

What's causing the growth in data centers in Austin, TX? The answer is AI. Data centers and large AI consumers, like the Texas Advanced Computing Center’s supercomputers, require enormous amounts of energy and water, raising environmental concerns. Our research reveals there are 386 data centers...

Read more
Read Hydrogen demonstration facility launches in Austin, Texas
Hydrogen demonstration facility launches in Austin, Texas

Hydrogen demonstration facility launches in Austin, Texas

April 29, 2024 Austin

A hydrogen demonstration facility has launched in Austin, Texas and will help provide power to the Texas Advanced Computing Center (TACC) data center via a fuel cell. The project – located at the University of Texas (UT) J.J. Pickle Research Campus in Austin – is a collaboration between GTI...

Read more
Read A 1.4 Million-square-foot Data Center Campus Outside Austin, Texas In Works
A 1.4 Million-square-foot Data Center Campus Outside Austin, Texas In Works

A 1.4 Million-square-foot Data Center Campus Outside Austin, Texas In Works

February 03, 2023 Austin

In Texas, a proposal for four data centers has been submitted on the location of a long-proposed private airport. The application for the 'Bastrop Project' data center was submitted to the Texas Department of Licensing and Regulation (TDLR) this month. The application is for a new construction of...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?