Digital Realty: AUS11

Latest Podcast 7500 Metro Center Drive
Operational
Fully operational facility
Operated by:

Digital Realty: AUS11

Year Built: 2012
Floors: 2
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

The building has 75,000 gross square feet with a 30-foot clearance height capable of supporting two floors inside the building. The site has diverse underground electrical ductbanks from a nearby substations. The facility offers access to seven fiber optic providers in close proximity to the building

Power:


  • Dual 8 MW underground electrical feeds from redundant substations
  • Substations are on different nodes of the local 138 kV transmission system
  • 2,500 kVA delivered by 480V services to each suite
  • Four (4) 625 kVA UPS systems configured as 2N
  • One (1) 2 MW generator per TKD plus one (1) shared redundant 2 MW configured as N+1

Building:


  • Tailored private office areas can be customized
  • Meeting rooms
  • On-site secure storage deliveries

Raised Floor Area:


  • 30 ft from slab to underside of lowest joists
  • 36 in raised floor
  • Acoustical ceiling tile installed at 12 ft above finished floor

Map and Nearby Locations

7500 Metro Center Drive
Digital Realty Trust Sites
Nearby Facilities

Digital Realty: AUS11 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Digital Realty: AUS11

Distance Site About
0.16 miles 7401 E Ben White - Digital Realty
7401 E. Ben White Blvd. is a three-building portfolio comprised of two single-story data centers and one single-story call center, which are located in southeast Austin.
0.21 miles Switch: Austin 1 (ADC)
Operated since 2003. Austin 1 is located on the Southeast side of Austin, on Data Foundry’s Disaster Recovery Campus.
0.26 miles CyrusOne Austin I
Also known as the Austin Met Center. CyrusOne has announced that this facility will close. Customers will be moved to other CyrusOne sites in Austin.
0.31 miles 7620 Metro - Digital Realty
The Digital facility is on 11.28 acres of land and features a 62,000-sq-ft building. The data center is full, with 100% of the space occupied with long-term lease tenants but there is additional land build another 135,000 sq ft facility.
0.49 miles CyrusOne Austin II
Supports 250 wpsf with the ability to support over 1,000 wpsf Raised Floor: 48"
0.51 miles DataCanopy: Austin, TX
Data Canopy's Austin, TX facility delivers exceptional connectivity and 100% power uptime within a state-of-the-art environment secured by industry-leading features.
0.52 miles CyrusOne: Austin III
CyrusOne's AUS3 data center is projected to be the company's largest facility in Austin, spanning 172,000 total square feet, which includes 120,000 square feet of colocation space (CSF) and over 25,000 square feet of Class A office space.
1.03 miles LightEdge Austin2 Burleson
The site was formerly operated by OnRamp before being acquired in July 2018.
1.03 miles LightEdge Austin1 Montopolis
OnRamp Staffs the site 24/7/365 Power Densities up to 30kW / Rack Outside of 100 year and 500 Year Flood Plains
1.03 miles Lumen Austin 4
1.25 miles Switch: Texas 3
Texas 3 (AUS03) is Switch's planned third data center on the Data Ranch campus in southeast Austin, a building of about 300,000 sq ft on the campus's vacant eastern lots next to a planned Austin Energy substation.
1.39 miles Switch: Texas 2
Texas 2 is the second building on Switch's Data Ranch campus in southeast Austin. Data Foundry opened its first phase in 2018, and Switch bought it in 2021.
1.45 miles Switch: Texas 1
Texas 1 is the first building on Switch's Data Ranch campus in southeast Austin. Data Foundry built the single-story, 130,000 sq ft data center in 2010-2011 with three data halls, and Switch bought it in 2021.
1.50 miles Lumen Austin 1 (4207 Smith School)
3.17 miles Verizon: 2100 HWY 35
Former XO Communications site
3.70 miles LOGIX Austin (1905 E 6th)
Acquired by LOGIX, the Alpheus site is east of Austin's central business district. Located on East 6th Street, it features a multiple carrier Internet backbone, dual backup power supplies
3.77 miles Lumen Austin 3 (500 Chicon)
4.23 miles Core Scientific: Austin, TX
In 2024, Core Scientific acquired this facility in Austin, Texas. The site was formerly used to house Hewlett Packard's hosting business, including high-performance computing.
4.29 miles CoreWeave: Austin, TX
CoreWeave has secured an 8-year lease agreement with Core Scientific for a 118,000 square feet of compute space at 3301 Hibbetts Road in Austin, Texas.
5.07 miles Tesla: Austin Dojo
Data center is reportedly on the South Side of the massive Tesla Gigafactory.
5.82 miles University of Texas: Austin
The Texas Advanced Computing Center (TACC) on the Austin campus hosts a 26,000 sq ft Tier III data center.
6.00 miles American Tower: Austin
In 2020, Communications infrastructure company American Tower launched its Edge data center in Austin, Texas.
8.99 miles Element Critical Austin
Element Critical Austin is a carrier-neutral colocation data center on North Interstate 35 in north Austin, Texas. Element Critical acquired the facility from vXchnge in 2021. It offers ready-to-deploy cabinets and secure cages, with staff on site around the clock.
9.24 miles EdgeConneX: AUS01
Located in the tech-forward Cedar Creek area of Bastrop County, EdgeConneX AUS01 is the high-performance anchor of a massive new data center campus.
9.57 miles EdgeConneX: AUS03
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
9.62 miles EdgeConneX: AUS11
EdgeConneX is developing two new 730,000 sq ft data centers, EDCAUS11 and EDCAUS12, in Bastrop County, Texas.
9.68 miles EdgeConneX: AUS02
The upcoming AUS02 facility is designed as a massive two-story structure, set to encompass 578,000 square feet (approximately 54,000 square meters) of high-density data center space.
9.74 miles EdgeConneX: AUS12
EdgeConneX is developing two new 730,000 sq ft data centers, EDCAUS11 and EDCAUS12, in Bastrop County, Texas.
9.79 miles EdgeConneX: AUS04
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
11.49 miles South RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.17 miles Verizon: 11501 Domain
Formerly an XO site
14.80 miles Station AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.48 miles SB Energy: Cosmos Tech Campus
The Cosmos Technology Campus is a SoftBank/SB Energy-backed redevelopment of the former 3M campus in Northwest Austin, Texas.
16.01 miles DataBank Austin AUS1
18.68 miles BlackChamber: Project Longhorn Expansion
Project Longhorn Expansion covers the future phases of BlackChamber's Project Longhorn campus in Cedar Creek, Bastrop County, about 26 miles southeast of downtown Austin. It includes a planned second building similar in size to Building One and room for two more buildings. Pacifico Energy is developing the campus's on-site gas-fired power plant.
18.78 miles Plaza OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.92 miles BlackChamber: Project Longhorn Building 1
Project Longhorn Building One is the first of two planned data center buildings on a roughly 2,800-acre campus in Cedar Creek, Bastrop County, about 26 miles southeast of downtown Austin. Black Chamber Partners is developing the data center. Pacifico Energy is developing an on-site gas-fired power plant to serve the campus.
19.00 miles Switch: Round Rock East Campus
Switch is constructing a new data center facility in Rock Round, Texas, located outside of Austin. The site spans 32.48 acres and is situated north of Louis Henna Boulevard and east of Greenlawn Boulevard in the Rock Round area.
19.06 miles Switch Austin "The Rock"
First announced in 2021, Switch's 'The Rock' data center in Texas will span 1.5 million square feet (140,000 sqm), and was first approved by the local council in July 2021. The campus is on land adjacent to a number of Dell-owned facilities in Round Rock, Texas.
19.11 miles Skybox: Austin 2
Skybox and Prologis have developed a state-of-the-art data center at 2515 South Kenney Fort Boulevard in Pflugerville, representing a $548 million investment.
19.15 miles Switch: AUS05 EVO DC
Switch is building another data center in Round Rock on a plot east of South Mays Street and north of Dell Way. The data center will span 72,600 sq ft of gross floor area.
19.15 miles Skybox: Austin 1
19.24 miles Sabey Austin 1A
Sabey Austin is Sabey Data Centers' new purpose-built data center campus located at 1300 Louis Henna Blvd. The two-building campus, when complete, will offer 430,000 square feet of reliable colocation.
19.38 miles Sabey: Austin 1B
Sabey Data Centers has begun construction on the second building at its Austin, Texas campus.

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake
[Goodman Group](https://baxtel.com/data-centers/goodman-group) and [Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) moved to buy up to 9.9% of Australian operator [NEXTDC](htt...

Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake

November 05, 2026 NEXTDC

Goodman Group and Digital Realty moved to buy up to 9.9% of Australian operator NEXTDC at a 45.5% premium to the previous close. The buyers offered A$9.50 a share through an aftermarket bookbuild, a purchase Reuters valued at about A$715 million (US$501 million) after reviewing the term sheet....

Read more
Read Sabey Data Centers Pilots HVO Diesel Replacement at Austin Data Center
[Sabey Data Centers](https://baxtel.com/data-centers/sabey-data-centers) has started a pilot using hydrotreated vegetable oil (HVO) as a diesel replacement in backup generators at its Austin campus...

Sabey Data Centers Pilots HVO Diesel Replacement at Austin Data Center

October 30, 2026 Sabey Data Centers

Sabey Data Centers has started a pilot using hydrotreated vegetable oil (HVO) as a diesel replacement in backup generators at its Austin campus. The company is testing the renewable fuel as the primary fuel source for those generators, according to Sabey's announcement. Sabey says the pilot...

Read more
Read Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) wants to build its first [Indiana](https://baxtel.com/regions/indiana) data centers in Kokomo, proposing a three-building camp...

Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana

October 17, 2026 Digital Realty Trust

Digital Realty wants to build its first Indiana data centers in Kokomo, proposing a three-building campus with roughly 1GW of IT capacity on 476 acres of greenfield land. The global REIT published a project page for the development after city officials confirmed its interest earlier this month,...

Read more
Read Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site...

Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

October 16, 2026 Digital Realty Trust

Digital Realty is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site plan that calls for roughly 1GW of IT capacity and completion in 2033. The company published the details on its Kokomo project page, and Kokomo Mayor Tyler...

Read more
Read Big Watt, PowerHouse Win Taylor Approval for 1GW Texas Data Center Campus
Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for the Taylor Technology Campus, a 664-acre hyperscale project immediat...

Big Watt, PowerHouse Win Taylor Approval for 1GW Texas Data Center Campus

October 15, 2026 PowerHouse Data Centers

Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for the Taylor Technology Campus, a 664-acre hyperscale project immediately east of the city that could reach one gigawatt of capacity. The joint venture announced the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.