Ntirety Vancouver
Former Hostway hosting site at 550 Burrard Street in downtown Vancouver, later carried under the Ntirety brand.
Former Hostway hosting site at 550 Burrard Street in downtown Vancouver, later carried under the Ntirety brand.
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
Located in downtown Louisville, the colocation and managed hosting data center is equipped with advanced features and security.
This is a former Hosting.com facility that was acquired from Ntirety in 2023.
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
Data Canopy's Austin, TX facility delivers exceptional connectivity and 100% power uptime within a state-of-the-art environment secured by industry-leading features.
Located in downtown, the CIN2 data center facility is used for production colocation, backup and recovery, and business continuity.
46+ cabinet positions and a 16-cabinet private cage suite. Multiple private cage options available to be segmented.
Located in Delaware just outside of Philadelphia, DataCanopy's Newark colocation and managed hosting data center is equipped with advanced features and security.
This facility has been audited under SOC 2 and SOC 3 requirements.
Located in the heart of Denver, the HOSTING N+1 data center is housed in a historic Ford Model T factory.
October 14, 2026 Alabama
Data center and energy infrastructure developer Digi Power X has secured a $200 million debt financing commitment, syndicated by Goldman Sachs and provided by an unnamed major lender. The funding will support its 40MW data center in Columbiana, Alabama, which is being built in two phases: 15MW by...
Read more
October 11, 2026 Austin
The first data center building at the 2,842-acre Cedar Creek campus being developed by Pacifico Energy and BlackChamber Group is on file with the Texas Department of Licensing and Regulation. The October 7 filing, reported by Community Impact, outlines a $366 million building at the Bastrop...
Read more
October 04, 2026 New Jersey
Newly obtained public records show that a 300-megawatt data center under construction in Vineland, New Jersey, ran 62 unpermitted natural gas generators for nearly a year and released an estimated 140 tons of smog-forming nitrogen oxides before state regulators intervened, according to an...
Read more
October 03, 2026 San Francisco Bay Area
San Francisco startup NetworkOcean says it has become the first company to run customer AI workloads from a solar-powered floating data center. The company operated a single Nvidia H100 GPU powered by a 20kW solar array during a trial in San Francisco Bay. The customer was not disclosed....
Read more
September 26, 2026 Alabama
The U.S. Department of Energy said on September 24 that it intends to put $1.9 billion of federal funding behind 31 grid-improvement projects in 26 states, a package aimed at adding transfer capacity for data centers and other large loads. Recipients will put up $3.35 billion more, bringing the...
Read more
August 07, 2026 Dallas
PowerHouse Data Centers is planning a new campus near Fort Worth, Texas. First reported by NBC, engineering firm Kimley-Horn has filed plans for a data center on about 88 acres in Westlake, north of Fort Worth. The proposed site is at 13580 Denton Highway, near US Highway 377 and Westport...
Read more
Jan 05, 2026 Eric Bell Dallas
Go to Podcast