Point PrimeInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Burlington, TX 76519
Under Construction
New facility under construction
Operated by:

OpenAI Stargate: Milam County, TX

Year Planned: 2027
Utility Provider: Oncor
Ownership: OpenAI leased from sb energy, which owns the land and buildings (master building: sb energy: milam county 1, #12336). the building.
This site is leased from SB Energy in the SB Energy: Milam County 1 building

OpenAI's Stargate data center in Milam County, Texas, sits on SB Energy's campus beside its Orion Solar Belt. SB Energy, a SoftBank Group company, owns the land and both buildings and runs the facility. An OpenAI affiliate leases both buildings under 15-year triple-net leases signed in January 2026. OpenAI designed the buildings and supplies its own servers and accelerators.

Site History

  • September 2025: OpenAI, Oracle and SoftBank name Milam County one of five new Stargate sites, with SoftBank's SB Energy as the partner.
  • January 2026: OpenAI and SoftBank each invest $500 million in SB Energy. An OpenAI affiliate signs leases for both buildings.
  • April 2026: Vertical construction proceeds on both buildings.

Project Profile

  • Landlord: SB Energy, through Milam County DC, LLC
  • Tenant: Orion DC I, LLC, an OpenAI affiliate, guaranteed by OpenAI Global, LLC
  • Lease: 15-year triple-net terms with two 10-year extensions
  • Buildings: SB Energy: Milam County 1 and SB Energy: Milam County 2

Map and Nearby Locations

This Facility
OpenAI Sites
Nearby Facilities

Prime TowerInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Campus UltraInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us SB Energy: Milam County 2
SB Energy's second data center building on its Milam County campus near Burlington, Texas. An OpenAI affiliate leases the building, which draws power from SB Energy's adjacent Orion solar plants.
NN milesInterested in this information?Contact us SB Energy: Milam County 1
SB Energy's first data center building on its Milam County campus near Burlington, Texas. An OpenAI affiliate leases the single-story, four-hall building, which draws power from SB Energy's adjacent Orion solar plants.
NN milesInterested in this information?Contact us Rowan: AUS02
The $780 million AUS02 project will see the construction of a single-story building totaling 500,000 sq ft (46,451 sqm).
NN milesInterested in this information?Contact us Rowan: AUS03
AUS03 is part of Rowan Infrastructure's Project Temple in Texas.
NN milesInterested in this information?Contact us Rowan: AUS01
Rowan Digital Infrastructure has officially commenced construction on its hyperscale data center campus, known as "Project Temple," in Temple, Texas.
NN milesInterested in this information?Contact us Rowan: Moriah DC
Originally announced in 2021, Rowan’s Moriah Data Center in Temple’s Synergy Park was completed in 2023. After the tenant vacated the property in 2024, Rowan shifted plans to convert the facility into a warehouse.

Operating Company

Operated by:
0
Facilities
0
Markets

News See all

Read Sabey Data Centers Pilots HVO Diesel Replacement at Austin Data Center
[Sabey Data Centers](https://baxtel.com/data-centers/sabey-data-centers) has started a pilot using hydrotreated vegetable oil (HVO) as a diesel replacement in backup generators at its Austin campus...

Sabey Data Centers Pilots HVO Diesel Replacement at Austin Data Center

October 30, 2026 Sabey Data Centers

Sabey Data Centers has started a pilot using hydrotreated vegetable oil (HVO) as a diesel replacement in backup generators at its Austin campus. The company is testing the renewable fuel as the primary fuel source for those generators, according to Sabey's announcement. Sabey says the pilot will...

Read more
Read Clayco and Kiewit Top Out First Building at Project Jupiter in New Mexico
Clayco and Kiewit New Mexico Co. topped out the 855,000-square-foot first building at Project Jupiter, a data center campus in Doña Ana County, [New Mexico](https://baxtel.com/regions/new-mexico). ...

Clayco and Kiewit Top Out First Building at Project Jupiter in New Mexico

October 27, 2026 STACK INFRASTRUCTURE

Clayco and Kiewit New Mexico Co. topped out the 855,000-square-foot first building at Project Jupiter, a data center campus in Doña Ana County, New Mexico. The contractors placed the final structural beam atop the building, completing its primary structural framework, Clayco announced on October...

Read more
Read OpenAI Seeks Permit To Fill 72 Acres Of Wetlands At Project Camellia
OpenAI has applied for a federal permit to fill 72 acres of wetlands at its Project Camellia data center campus in Georgia. The U.S. Army Corps of Engineers' Savannah District is taking public comm...

OpenAI Seeks Permit To Fill 72 Acres Of Wetlands At Project Camellia

October 26, 2026 OpenAI

OpenAI has applied for a federal permit to fill 72 acres of wetlands at its Project Camellia data center campus in Georgia. The U.S. Army Corps of Engineers' Savannah District is taking public comments on the application through Nov. 4, the Savannah Morning News reported. The campus is planned...

Read more
Read Big Watt, PowerHouse Win Taylor Approval for 1GW Texas Data Center Campus
Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for the Taylor Technology Campus, a 664-acre hyperscale project immediat...

Big Watt, PowerHouse Win Taylor Approval for 1GW Texas Data Center Campus

October 15, 2026 PowerHouse Data Centers

Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for the Taylor Technology Campus, a 664-acre hyperscale project immediately east of the city that could reach one gigawatt of capacity. The joint venture announced the...

Read more
Read Big Watt, PowerHouse Win Approval for 1GW Behind-the-Meter Texas Campus
Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for Taylor Technology Campus, a 664-acre data center and power project e...

Big Watt, PowerHouse Win Approval for 1GW Behind-the-Meter Texas Campus

October 15, 2026 PowerHouse Data Centers

Taylor City Council voted 5-0 on Oct. 8 to approve a development agreement with Big Watt Digital and PowerHouse Data Centers for Taylor Technology Campus, a 664-acre data center and power project east of the city that could reach one gigawatt of capacity. In a joint press release, the partners...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?