North America Data Centers & Colo

Login to Add Favorite Login to Request Pricing

The North America Data Center Map Has 2006 Sites

Search North America's Data Centers


North America Data Center List

56 Marietta Carrier Hotel - Digital Realty
56 Marietta Street NW
Atlanta, GA 30303
Located in Atlanta
  • 152,650 Gross SqFt
  • 10.0 Megawatts

56 Marietta is a Carrier Hotel and one of the most popular buildings in the Atlanta data center market.

Equinix Ashburn Campus
21715 Filligree Court
Ashburn, VA 20147
Located in Ashburn: Data Center Alley
  • 573,032 Gross SqFt
  • 37.0 Megawatts

Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.

RagingWire Ashburn VA3
21583 Megawatt Drive
Ashburn VA 20147
Located in Ashburn: Data Center Alley
  • 245,000 Gross SqFt
  • 16.0 Megawatts

RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.

Iron Mountain Northern Virginia (Manassas)
11650 Hayden Rd
Manassas, VA 20109
Located in Northern Virginia
  • 100,000 Gross SqFt
  • 10.5 Megawatts

Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.

  • VA-1, the first building on the campus, is a 165,000Sqft facility with 10.5 MW of power.
Digital Realty Loudoun Ashburn Campus
43881 Devin Shafron Drive
Ashburn, VA 20146
Located in Ashburn: Data Center Alley
  • 80.0 Megawatts
  • 1,700,000 Building SqFt

The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.


Top Data Center Providers in North America

Sites Sites Gross SqFt Gross SqFt Power (MW) Power (MW)
Digital Realty Trust 126 14,553,143 1486.93
Equinix 73 6,425,712 398.95
Cyxtera Technologies 48 3,840,886 353.80
CyrusOne 38 3,534,945 525.70
Sungard Availability Services 38 2,500,624 21.15
{{ provider.company_name }} {{ provider.sites_count_for_region }} {{ provider.sqft_for_region }} {{ provider.power_mw_for_region }}

Largest Data Centers in North America

Gross SqFt Gross SqFt Power (MW) Power (MW)
350 E Cermak - Digital Realty 1,133,391 100.00
Markley: One Summer Street 800,000 30.00
Google Douglas County Georgia 800,000 78.80
Microsoft Quincy MWH 800,000 100.00
Microsoft Chicago Northlake 707,244 198.00
{{ datacenter.site_name }} {{ datacenter.total_gross_sqft }} {{ datacenter.total_power_mw }}

Top North America Datacenter Markets by # of Sites

Loading...

Top North America Datacenter Markets by Power Capacity (MW)

Loading...


June 2019

CBRE North American Data Center Report (H1 2019)

Map produced by TAG, the Technology Association of Georgia.
Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
MAREA and BRUSA cables are now landing in Virginia Beach. The Virginia Beach landing port provides an alternative to NY and Flordia landing stations.
The lot currently has a 211,125-square-foot, two-story church, child care center, and
private school building.
The building is owned by Allied REIT
One of three campuses in the US East (Ohio) Region
This is an original piece commissioned for the Altoona Data Center by @Micah Crandall-Bear and Shaun Burner.
The license plate wall at the Altoona Data Center was created with plates and pieces from West End Architectural Salvage & Coffee Shop in Des Moines
An illustration of Iron Mountain's new Phoenix data center, which will feature 48MW of capacity in two phases. First 24 MW is scheduled to be delivered in June 2019
The expansion lot for Iron Mountain Phoenix campus is marked with a red box. IO Data Centers LLC originally acquired the land in 2016 for $8.55 million.
Apple built a 50MW solar power plant on 300 acres in Florence, Ariz., which is used to power its Mesa data center.
DRT's Webb Chapel data center utilizes Aesthetically pleasing cylinders on the roof to hide mechanical infrastructure
Digital Realty Trust's campus in North Houston contains several other colocation providers including Level3 and Sungard.
One of Equinix's NOCs is located at SV2 in Santa Clara
The Old State Line Generating Plant in Hammond, Indiana before it was demolished to make way for the new data center development
Outside of Iron Mountain's Denver Data Center
Street view of AT&T's data center in Palo Alto
A crew insulates and sides the old Daugherty Hardware store on Sixth Avenue East in Duluth. The building now is known as the Sixth Avenue Building and will house offices for Essentia Health System
Pittock Block is in Portland downtown. The image shows the building's distance to the Pearl District and Oldtown areas.
Phase I is 15 MWs
Phase 2 will be 30 MWs
Phase 3 will be up to 45 MWs
Diagram showing that Fiber Connect is available between Equinix facilities in New York and Northern New Jersey metros
Located in the heart of Silicon Valley near Highway 101, this data center is strategically placed on major fiber routes and near three cost-effective sub-stations of the power grids of Silicon Vall...
OKC data center celebration as employees & workers held a topping out ceremony. Each signed a pillar.
Minnesota's carrier hotel
eBay has deployed 4,920 servers in these containerized data centers on the roof of its new data center in Phoenix.
It's hard to get a good shot of the building with so many trees.
We will be developing a campus next to our existing facility that will be home to two new buildings. This new construction will bring our total Prineville footprint to more than 3.2 million square ...
This stacking plan shows the layout of CH1, CH2, and CH4 in the building. The Telx (now Digital Realty) Meet-Me-Room on the 2nd floor. Financial Exchanges such as BATS, CME, and ICE are also noted.
Exterior view of the original Palo Alto Internet Exchange (PAIX) building
Sign describing that the SV8 location was also the first school in Palo Alto. Established in 1893.
The map on the wall represents Equinix's focus on Interconnection
Just after construction and ready to be filled
Equinix received a $1 million rebate from Southern California Edison (SCE) for upgrades to the LA3 facility that boosted energy efficiency. The rebate is part of SCE’s program offered to businesses...
Front Entrance of Equinix's MI1 site. Circa 2018
150,000 square foot VA1 data center is an EPA's ENERGY STAR certified facility with 14.4 megawatts of high density critical IT power.
FastE anyone?
The data center is sandwiched between Tierpoint and Cisco Systems data centers
From Left to Right: Laramie Dorris, VP Design & Construction, Kellie Teal-Guess, CPO (Chief People Officer), Gary Caplinger, Allen Mayor Pro Tem Baine Brooks, Allen City Council Member John Hatem, ...
The building's exterior skin acts like a mirror
The practice of "topping out" a new building can be traced to the ancient Scandinavian religious rite of placing a tree atop a new building to appease the tree-dwelling spirits displaced in its con...
The Pama Technology Center is a four building complex
Andrew Silvestri, Google head of data center public policy & community development; Gov. Steve Sisolak; U.S. Rep. Susie Lee, D-Nevada; U.S. Sen. Jacky Rosen, D-Nevada; Jacqueline Fuller, vice presi...
Andrew Silvestri, Google head of data center public policy & community development, at the construction site during a Google Nevada data center investment announcement in Henderson on Monday, July ...
Photo taken in March 2019
The stacking plan diagram shows the building's tenants and high level layout with in the building
The diagram shows the building's 9th floor MMR and POE fiber paths from the street into the building
8th Colo and 9th floor MMR areas.
The Antennas Have a Good View
The data center is expected to be completed in Spring of 2019.
The Fremont 2 Colocation Facility is arranged with “warm and cold” rows. The front of each cabinet faces a cold row, drawing air from the front and venting through the rear to the warm row.
Phase I on the Alliance Texas development is pictured
The new Santa Clara data center will be ready in 2020.
The campus could potentially reachj $785 million
Photo taken in May 2019
The site's address is 12200 Herbert Wayne Court
3000 Skyline is well situated to take advantage of the East Dallas Fiber Loop, which provides redundant connectivity to Dallas’ major carrier hotels, including 1950 Stemmons, 2323 Bryan, 400 South ...
416 MWs?!
The site was previously built and operated by Infomart before rebranding to STACK in January 2019.
This squeaky clean space on the 6th floor has everything but the computers. Note the absence of raised floors. In this facility, servers will be placed on concrete slabs. Air supply travels through...
The 5th floor houses the data center's uninterruptable power supply systems and backup batteries. The UPS room itself is redundant, too. There are four of these UPS rooms.
The chiller plant on the 4th floor of the data center is comprised of condenser water pumps and risers that are responsible for maintaining the appropriate temperature in the data center. The ceili...
Large fiber trays are needed to support all the interconnection at Toronto's carrier hotel.
Cologix's Vancouver 2 site
The site was built next to Equinix's TR2 site in downtown Toronto
There is an administrative building between the two data center phases.
Left to right: Senator Michael Roberson, Commissioner Steve Sisolak, Switch Founder and CEO Rob Roy, UNLV’s Metal Rebel Robot, Governor Brian Sandoval, Senator Aaron Ford and Dr. Paul Oh celebrate ...
The 12,690 sq ft greenfield DC BLOX Huntsville data center is capable of delivering up to 20 MW of power
The site opened in 2018.
The building features 30,000 square feet of customer office space, a modern cafeteria, a gym area with workout machines, and unique recreation space featuring a climbing wall, circular slide and a ...
The facility was acquired in 2019 by GI Partners in a sale-leaseback transaction
The semiconductor manufacturing facility 'bones' provides an excellent weight-bearing structure for the data center
The building was previously to be the Barker Brothers Furniture Store building. Picture was taken circa 1926
Cosentry acquired the facility from Red Anvil in 2013
SubTopolis hosts an annual Groundhog Run for the last 35+ years. The event, 5K and 10K runs hare typically hosted in January
RagingWire has spent money to money to build in data center amenities and good aesthetics. The lobby of VA3 is no exception.
The 78-acre fenced campus can support up to 7 buildings with a total critical power load of 108 MW.
RagingWire plans 7 buildings on the campus. VA3, VA4, VA5, VA6, VA7, VA8, and VA9.
Equinix offers the Fiber Connect product between EQIX AT1 (at 180 Peachtree) and EQIX AT2/3 (at 56 Marietta)
Before it was a data center, the building held a major department store. The store was called Davison's before rebranding as Macy's. The store closed its doors in 2003.
Anyone up for a game of Ping Pong?
Data Center Layout of showing the colocation rooms, Meet Me Room, Mechanical, and Switch Gear.
Taken during a TechPalooza event in June 2018
The Fremont 1 Data Center includes 12 rows of 84 cabinets each (1,008 total)
The QTS Princeton Solar Array is a 14.1 Megawatt Photovoltaic System, one of the largest, privately owned, net metered photovoltaic systems in the Western Hemisphere. The Solar Array occupies appro...
Conduits bringing in external fiber networks
The walls still have rock walls
In this photo taken Dec. 14, 2016, overhead pipes carry water from an underground reservoir to help cool the data center systems at Iron Mountain's underground data center in Butler County, Pennsyl...
The facility serves two primary clients: Northrop Grumman IT and the Virginia Information Technologies Agency, which oversees the state’s technology infrastructure.
Digital Realty’s data center in Chandler, Arizona, is at the southern edge of Phoenix’s sprawl, near a massive Intel plant, and companies like Orbital ATK and Iridium. It is one of the largest in A...
Energy Labs Hybrid Systems utilize a perimeter base frame constructed of Structural Steel to insure minimum deflection
Spartan decor, but functional
The water storage tanks hold up to 240,000 gallons (900,000 liters) of water at any given time. The insulated tanks holds water to be used for cooling the data center.
Yahoo Japan’s data center will be built using Open Compute Project designs for the sake of increasing efficiency. By processing data in the United States, the company claims to have reduced its ele...
The Telx Meet Me Room before being acquired by Digital Realty
The Western Union Building on Hudson Street is approximately 4 blocks from the AT&T Long Lines Building on 6th Street
A construction crane collapsed in Lower Manhattan Feb 5th 2016, crushing a row of parked cars and killing one man and injuring several others.
Suites available as of 2017
The inertia flywheel provides conditioned uninterrupted power to data center equipment
Ready for a customer deployment
Suite 4004 is 500 kW and 4,631 square feet.
Note the width of the yellow fiber trays. There must be alot of cross connects in the facility!
Compass built the data center.
MDC-2 has 3,500 ft² that is equipped to inventory over 500,000 storage tapes.
The data center constructed by Compass and launched in March 2018
TierPoint CEO Jerry Kent, Maryland Lt. Governor Rutherford and other local officials celebrate the grand opening of our newest Maryland facility with a ceremonial ribbon cutting!
Taken during the June 2018 launch of the BWI site
Image created by Digital Realty before the sale of St Louis's two carrier hotels (to Netrality) which are in close proximity to each other.
210 Tucker is owned by Netrality Properties
A logistics specialist uses a tug to move a server rack in one of the data halls at the newly opened Facebook data center in Los Lunas
With portable stations, diagnostic functions easily can be performed throughout the data center.
Photo taken in July 2012
Space inside Netrality interconnected colocation facility at 717 South Wells Chicago
Government officials and representatives of Facebook pose with shovels following the announcement that Facebook will build a data center in Eagle Mountain, Utah.  May 2018.
Jenny Odell, a Bay Area digital artist, was commissioned to jazz up the structure in Mayes County, Oklahoma as part of Google's Data Center Mural Project.

Odell created four circular collages us...
This facility is four stories
Contegix's name is on the building
Phase 2 & 3 with the on-site substations
The double-stacked Caterpillar generators tower above the equipment yard. The 2.5 megawatt units are raised 8 feet above the yard to ensure clearance far above the 500-year flood stage. They are fe...
The cooling plant features evaporative condensing units and can useair- and water-side economization with variable speed CRAHs. CoreSite is able to use economization for about two-thirds of the yea...
Cooling infrastructure on the roof of the Vantage Data Centers V2 facility in Santa Clara
Attendees play shuffleboard during the grand opening party for the V6 building on the Vantage Santa Clara Campus
Facebook is in the process of building a massive data center in Sarpy County south of Papillion.
Lobby with a view of the conference room
The “Black Iron Forest” is a framework of extra-thick steel that supports Switch’s containment systems, but also serves as a thermal storage system, retaining temperature to help keep the room cool...
Colo area with slab floors
Shows the location of the Netrality Properties operated Meet-Me Room on the 6th floor as well as the generator rooms
Note the electrical infrastructure just North of the facility
Note, the door is ajar!
The site was previously built and operated by Infomart before rebranding to STACK in January 2019.
Groundbreaking for Apple's data center expansion in Reno.
The filters seem to go on forever.
Apple built a three of 100-acre solar arrays adjacent to the company's Maiden NC data center. Each solar field will produce 20-megawatts.
In August 2017, Apple announced plans to build a 400,000-square-foot, state-of-the-art data center in Waukee, Iowa, to better serve North American users of iMessage, Siri, the App Store, and other ...
Facility Outside Des Moines Will Run on 100 Percent Renewable Energy
Photo taken in September 2018
The Garland Building at 1200 W 7th was rebranded as West 7th Center
The data center was acquired in April 2016
The buildings and next to each other
Potential floor plan
Meet Me Room at RagingWire's CA3 facility in Sacramento.
Workers finishing up the final conduit tie ins on Corporate Landing Parkway Virginia Beach VA.  Globalinx will now have 3 diverse point of entry conduit systems coming into our Phase I Data Center ...
Google held a launch  event in June 2019.
Photo taken in June 2019
The site was previously built and operated by Infomart before rebranding to STACK in Jan 2019.
The WindChill Module design uses fresh air to cool servers, cooling it using an adiabatic cooling system in which air passes through water flowing through evaporative cooling media. The design uses...
55 S. Market is an iconic 1980’s era building in the historic core of downtown San Jose.
The lot is on the corner of Yuma Road and Bullard Ave in Goodyear.
Workers putting on insulation to the exterior of SV7
CoreSite SV4 was completed in 2011
CoreSite's SV8 building is starting to take shape. (January 2019)
The transport ring connects DataBank's three KC data centers as well as 1102 Grand, Kansas City's telecom hotel
Phase 1 has 6 MW of power and 48,000 square feet of raised floor space
Centrally located, well connected, and completely designed as a data center. This facility offers 20MW of data center critical load with a total electrical service to the building of 40 MW and auto...
For the price of a cross-connect one can order an "extended cross connect" between CoreSite's LA data centers. This allows a customer to deploy in the more robust data center (LA2) while taking adv...
Flexential Compark site has over 2000 feet of high-security perimeter fence, two vertical pivot gates, several security barrier arms and a large 30 foot automated cantilever gate
With over 2000 feet of high security perimeter fence, two vertical pivot gates, several security barrier arms and a large 30 foot automated cantilever gate
Front Entrance of Viawest's data canter in Englewood
Satellite view of the Digital Realty Trust's new building and its proximity to Equinix Ashburn, and Cologix's new site
EQIX SV17 is in the background
The 360 Spear data center is also pictured next to the 365 Main data center. Both buildings are owned by Digital Realty Trust
Equinix doesn't charge for **everything.** Equinix offers complimentary cabinet and rack screws in the San Jose data center
Equinix SV10 represents the newest state-of-the-art Equinix International Business Exchange [IBX] center. This client's 183,000 gsf building consists of a two-story, steel framed building with prec...
The Bloom Energy fuel cell test deployment was 1 Megawatt
A view of the power spine inside SuperNAP complex in Las Vegas, showing the large number of conduits housing power cabling.
The “Black Iron Forest” is a framework of extra-thick steel that supports Switch’s containment systems, but also serves as a thermal storage system, retaining temperature to help keep the room cool...
Site work began in February 2018, just five months after the project was announced, thanks to Henrico County’s fast permitting approval program and the development-ready site at White Oak Technolog...
In September 2018, Facebook announced an expansion from two buildings to five. This graphic shows the layout
Involta also owns more than 6,500 fiber route miles throughout Ohio.
Yellow = EdgeConnex's data center
Pink = Space for lease
Bring on the carriers
The building is home to the CBC (and a data center)
The Montreal Gazette's printing plant on St-Jacques St. when it was brand new in 2002. It was sold in 2017 to a data company.
In a gasketed plate and frame heat exchanger, the fluids run counter-currently through the heat exchanger. The hot liquid normally enters through one of the upper connections and leaves through the...
Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Posted in Atlanta

Map produced by TAG, the Technology Association of Georgia.

Boston Metro: Average Power Rates
Posted in Boston Source: JLL
Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Posted in Northern Virginia

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

MAREA and BRUSA cables are now landing in Virginia Beach. The Virginia Beach landing port provides an alternative to NY and Flordia landing stations.
Subsea Cables Landing in Virginia Beach
Posted in Virginia Beach

MAREA and BRUSA cables are now landing in Virginia Beach. The Virginia Beach landing port provides an alternative to NY and Flordia landing stations.

Source: Virginia Beach Economic DEvelopment Board
Map of Virginia Beach Data Centers and Corporate Landing Business Park
Posted in Virginia Beach Source: City of Virginia Beach
Maine Fiber Company paths (Acquired by FiberLight)
Posted in Maine Source: MFC, Inc
Large Content Company Data Centers in Rural Oregon
Posted in Oregon Source: Dan Aguayo - The Oregonian
Dartmouth Regional Technology Center
Posted in FirstLight Lebanon Source: Google Maps
FirstLight Lebanon
Posted in FirstLight Lebanon Source: FirstLight Fiber
Chillers on the Roof of SunGard's site at 401 N Broad
Posted in SunGard Philadelphia (401)
Cologix Minneapolis is located within the 511 Building
Posted in Cologix MIN1, MIN2, and MIN3
QTS Sacramento at 1100 N Market Blvd
Posted in QTS Sacramento Source: QTS
Two MSFT Facilities Built as of 2018 on the TRP Campus
Posted in Microsoft Texas Research Park Source: Google Maps
310 Marlboro St in Keene
Posted in FirstLight Keene
The lot currently has a 211,125-square-foot, two-story church, child care center, and
private school building.
Cologix Land Acquisition in Ashburn
Posted in Cologix Ashburn ASH1

The lot currently has a 211,125-square-foot, two-story church, child care center, and
private school building.

Source: Board of Supervisors
The Christian Fellowship Church will be Converted into a Cologix Data Center
Posted in Cologix Ashburn ASH1
Chillers on the Roof
Posted in Cologix Toronto TOR2
The building is owned by Allied REIT
Exterior of 905 King Street
Posted in Cologix Toronto TOR2

The building is owned by Allied REIT

Lobby of 905 King Street
Posted in Cologix Toronto TOR2 Source: Allied Properties REIT
Exterior of 3004 Irving Blvd in Dallas
Posted in TierPoint Dallas (Colo4)
One of three campuses in the US East (Ohio) Region
AWS's New Albany Campus (US East: Ohio)
Posted in Amazon New Albany

One of three campuses in the US East (Ohio) Region

Rendering of the Planned Vantage Campus in Goodyear, AZ
Posted in Vantage Phoenix Source: Vantage Data Centers
Facebook Facility at 100 Share Way NW
Posted in Facebook Altoona Iowa Source: Des Moines Register
This is an original piece commissioned for the Altoona Data Center by @Micah Crandall-Bear and Shaun Burner.
Original Artwork
Posted in Facebook Altoona Iowa

This is an original piece commissioned for the Altoona Data Center by @Micah Crandall-Bear and Shaun Burner.

Source: Facebook
The license plate wall at the Altoona Data Center was created with plates and pieces from West End Architectural Salvage & Coffee Shop in Des Moines
Altoona Artwork
Posted in Facebook Altoona Iowa

The license plate wall at the Altoona Data Center was created with plates and pieces from West End Architectural Salvage & Coffee Shop in Des Moines

Source: Facebook
2017 Rendering of the first 5 Buildings on the Facebook Iowa Campus
Posted in Facebook Altoona Iowa Source: Facebook
Data Center Floor at FB Iowa
Posted in Facebook Altoona Iowa
Exterior of BTP at 1401 Russell Street
Posted in TierPoint Baltimore (BTP)
Satellite Image PCM's Data Center
Posted in PCM New Albany Source: Google Maps
Under Construction in 1901
Posted in Wells Building
Front of Wells Building
Posted in Wells Building
Iron Mountain Scottsdale Front Entrance
Posted in Iron Mountain Scottsdale Source: http://www.ironmountain.com/resources/data-sheets-and-brochures/s/scottsdale-data-center
An illustration of Iron Mountain's new Phoenix data center, which will feature 48MW of capacity in two phases. First 24 MW is scheduled to be delivered in June 2019
Rendering of the Expansion building that is adjacent to Iron Mountain's existing facility
Posted in Iron Mountain Phoenix

An illustration of Iron Mountain's new Phoenix data center, which will feature 48MW of capacity in two phases. First 24 MW is scheduled to be delivered in June 2019

The expansion lot for Iron Mountain Phoenix campus is marked with a red box. IO Data Centers LLC originally acquired the land in 2016 for $8.55 million.
Expansion
Posted in Iron Mountain Phoenix

The expansion lot for Iron Mountain Phoenix campus is marked with a red box. IO Data Centers LLC originally acquired the land in 2016 for $8.55 million.

Entrance to Original Data Center
Posted in Iron Mountain Phoenix
Apple built a 50MW solar power plant on 300 acres in Florence, Ariz., which is used to power its Mesa data center.
Apple's 50 MW Solar Farm in Florence AZ
Posted in Apple Mesa

Apple built a 50MW solar power plant on 300 acres in Florence, Ariz., which is used to power its Mesa data center.

Long Hallway
Posted in Apple Mesa Source: Tom Tingle - the Republic
Water Pumps for Cooling Servers
Posted in Apple Mesa Source: Tom Tingle - The Republic
Aerial View
Posted in Apple Mesa
Apple's Global Data NOC in Mesa
Posted in Apple Mesa
Aerial Photo of the 7 Teleport Drive
Posted in Telehouse The Teleport Source: Telehouse
Lightbound at 731 West Henry Street
Posted in Lightbound Indianapolis
Outside of Tierpoint LIT
Posted in TierPoint Little Rock
Facebook Construction in Prineville Circa 2018
Posted in Facebook Prineville Source: KTVZ.com
Front of FB Prineville facility
Posted in Facebook Prineville
FB data center room in Prineville
Posted in Facebook Prineville
Stack Plan at 7th Street Data Center
Posted in CyrusOne Cincinnati 7th Street Source: CyrusOne
Cincinnati Bell Building was built in an Art Deco style
Posted in CyrusOne Cincinnati 7th Street
Equinix SE2 is located within the Westin Building
Posted in Equinix Seattle SE2
CONE facility at 11500 Goldcoast Drive in Cincinnati
Posted in CyrusOne Cincinnati-Goldcoast
CONE's facility at 155 Myers Corners Rd in Wappingers Falls
Posted in CyrusOne Wappingers Falls Source: CyrusOne
Long Brick Facade of the Wappingers Falls Data Center
Posted in CyrusOne Wappingers Falls
Bird's Eye View of DRT's Large Data Center in North Dallas
Posted in 11830 Webb Chapel - Digital Realty Source: Google
DRT's Webb Chapel data center utilizes Aesthetically pleasing cylinders on the roof to hide mechanical infrastructure
The Building uses Aesthetically Pleasing Cylinders on the Roof
Posted in 11830 Webb Chapel - Digital Realty

DRT's Webb Chapel data center utilizes Aesthetically pleasing cylinders on the roof to hide mechanical infrastructure

Aerial View of Digital Realty's Ashburn Campus
Posted in Digital Realty Loudoun Ashburn Campus
Colocation Room inside the Sharp Building
Posted in BinaryNet: Sharp Building Source: Binary Net
Entrance to LA4
Posted in Equinix El Segundo LA4 Source: PARADIGM
Lobby Area
Posted in Equinix El Segundo LA4 Source: PARADIGM
Overhead Infrastructure
Posted in Equinix El Segundo LA4 Source: PARADIGM
SwitchGear for LA4
Posted in Equinix El Segundo LA4 Source: PARADIGM
Cooling Tower for LA4
Posted in Equinix El Segundo LA4
Digital Realty Trust's campus in North Houston contains several other colocation providers including Level3 and Sungard.
Satellite View of Digital Houston Campus
Posted in 12001-12235 North Freeway - Digital Realty

Digital Realty Trust's campus in North Houston contains several other colocation providers including Level3 and Sungard.

Source: Google Maps
EQIX AT4 taken from Interstate North Parkway
Posted in Equinix Atlanta AT4
EQIX AT4 taken from North East Side of Building
Posted in Equinix Atlanta AT4
Digital Realty's Data Center in Bedford, MA
Posted in 55 Middlesex Turnpike - Digital Realty Source: DRT
Front Gate
Posted in 505 N Railroad Ave - Digital Realty Source: Digital Realty Trust
Overhead at Twilight
Posted in 505 N Railroad Ave - Digital Realty Source: CBRE
Equipment Yard
Posted in 505 N Railroad Ave - Digital Realty Source: CBRE
Exterior of 1350 Duane (SV2)
Posted in Equinix Santa Clara SV2
One of Equinix's NOCs is located at SV2 in Santa Clara
Equinix NOC at SV2
Posted in Equinix Santa Clara SV2

One of Equinix's NOCs is located at SV2 in Santa Clara

Outside of Carrierhouse Data Center & Teleport
Posted in Carrierhouse
IAD50, 60, and 71
Posted in Amazon IAD71
DB PIT1 Colocation Floor
Posted in DataBank Pittsburgh PIT1 Source: DataBank
Front of DB's Pine Ridge Data Center
Posted in DataBank Pine Ridge KC2 Source: DataBank
Rendering of the Planned Data Center in Hammond
Posted in Indiana NAP
The Old State Line Generating Plant in Hammond, Indiana before it was demolished to make way for the new data center development
Aerial View of the Old State Line Generating Plant
Posted in Indiana NAP

The Old State Line Generating Plant in Hammond, Indiana before it was demolished to make way for the new data center development

Cisco TXDC1 is on the first 2 floors of the office building
Posted in Cisco Richardson TXDC1
RCDN9 Data Center Floor Layout
Posted in Cisco Richardson TXDC1 Source: Cisco
Satellite View of Flexential Facility at 11900 E Cornell Ave
Posted in Flexential Aurora (Cornell) Source: Google Maps
Inside FORTRUST Denver data center
Posted in Iron Mountain Denver - Fortrust Source: FORTRUST
Outside of Iron Mountain's Denver Data Center
Outside of 4300 Brighton Boulevard
Posted in Iron Mountain Denver - Fortrust

Outside of Iron Mountain's Denver Data Center

Source: Iron Mountain
Street view of AT&T's data center in Palo Alto
Exterior View
Posted in AT&T Palo Alto

Street view of AT&T's data center in Palo Alto

Source: Google Maps
Outside front entrance
Posted in LightEdge Austin Burleson Source: LightEdge
Entrance and Conference Room
Posted in LightEdge Austin Burleson Source: OnRamp
CHI01 Site Layout
Posted in STACK Chicago Source: STACK
Rendering of the STACK expansion facility in Elk Grove
Posted in STACK Chicago Source: STACK
Touring Google's Data Center in The Dalles
Posted in Google The Dalles Oregon Source: Video: https://www.youtube.com/watch?v=zDAYZU4A3w0
Water Vapor (Steam) Rises from the Cooling Towers
Posted in Google The Dalles Oregon Source: Google
Google's Dalles Campus
Posted in Google The Dalles Oregon
Rendering of QTS Phoenix
Posted in QTS Phoenix Source: QTS
Rendering of the T-Mobile Facility in Ft Lauderdale
Posted in T-Mobile Everglades MSO Source: Lincoln Rackhouse
A crew insulates and sides the old Daugherty Hardware store on Sixth Avenue East in Duluth. The building now is known as the Sixth Avenue Building and will house offices for Essentia Health System
Refurbishing Facility in 2012
Posted in Involta Duluth 421 N 6th

A crew insulates and sides the old Daugherty Hardware store on Sixth Avenue East in Duluth. The building now is known as the Sixth Avenue Building and will house offices for Essentia Health System

Source: Duluth News
Cogent Site on Big Beaver Rd
Posted in Cogent Detroit
Tierpoint facility at 108 Bank St Waterbury, CT
Posted in TierPoint Waterbury Source: Google Maps
Exterior from the Street
Posted in 360 Spear - Digital Realty
Champa Telecom Hotel
Posted in 1500 Champa
Digital Realty's Piscataway Campus
Posted in 3 Corporate - Digital Realty
Satellite View of 200 Webro Road
Posted in Cologix Parsippany NNJ3 Source: Google Maps
Exterior of BT Radianz Trading Facility
Posted in BT Radianz: 492 River Road
Street View
Posted in Pittock Internet Exchange Source: Wikipedia: Werewombat
Pittock Block is in Portland downtown. The image shows the building's distance to the Pearl District and Oldtown areas.
Building in Downtown
Posted in Pittock Internet Exchange

Pittock Block is in Portland downtown. The image shows the building's distance to the Pearl District and Oldtown areas.

Lobby & Security Desk
Posted in H5 Atlanta Source: H5 Data Centers
Conference Room
Posted in H5 Atlanta Source: H5 Data Centers
Colocation Room Ready for New Deployments
Posted in H5 Atlanta Source: H5
Site Overview for Building One on Prime's Campus
Posted in Prime Sacramento Source: Prime Data Centers
Phase I is 15 MWs
Phase 2 will be 30 MWs
Phase 3 will be up to 45 MWs
The Prime Campus Will be Built in Three Phases
Posted in Prime Sacramento

Phase I is 15 MWs
Phase 2 will be 30 MWs
Phase 3 will be up to 45 MWs

Source: Prime Data Centers
Exterior of NY5
Posted in Equinix Secaucus NY2, NY4, NY5, NY6 Source: Equinix
Diagram showing that Fiber Connect is available between Equinix facilities in New York and Northern New Jersey metros
Equinix Fiber Connect in NY and NJ
Posted in Equinix Secaucus NY2, NY4, NY5, NY6

Diagram showing that Fiber Connect is available between Equinix facilities in New York and Northern New Jersey metros

Source: Equinix
Exterior of NY6
Posted in Equinix Secaucus NY2, NY4, NY5, NY6 Source: Equinix
Equinix NY6 Security Desk
Posted in Equinix Secaucus NY2, NY4, NY5, NY6 Source: Equinix
NY6 Customer Area
Posted in Equinix Secaucus NY2, NY4, NY5, NY6 Source: Equinix
Equinix Business Suites Room at NY6
Posted in Equinix Secaucus NY2, NY4, NY5, NY6 Source: Equinix
NY6 UPS Room
Posted in Equinix Secaucus NY2, NY4, NY5, NY6 Source: Equinix
SV7 Chiller Plant
Posted in CoreSite SV7
Credit Suisse New Jersey Data Centre
Posted in Credit Suisse: Clifton
Front Entrance to 19701
Posted in ROOT Montreal MTL-R2 Source: ROOT
Located in the heart of Silicon Valley near Highway 101, this data center is strategically placed on major fiber routes and near three cost-effective sub-stations of the power grids of Silicon Vall...
Exterior of 1201 Comstock
Posted in 1201 Comstock - Digital Realty

Located in the heart of Silicon Valley near Highway 101, this data center is strategically placed on major fiber routes and near three cost-effective sub-stations of the power grids of Silicon Valley Power

Source: DRT
Entrance to 23 Fraser
Posted in Beanfield 23 Fraser
Power Cabinets
Posted in Beanfield 23 Fraser Source: Beanfield
Liebert CRAC Unit
Posted in Beanfield 23 Fraser Source: Beanfield
Exterior of US Signal's Madison Data Center
Posted in US Signal Madison Source: US Signal
Outside of Skybox at 22000 Franz Road in Katy TX
Posted in Skybox Houston One
Skybox Houston One Data Hall
Posted in Skybox Houston One
OKC data center celebration as employees & workers held a topping out ceremony. Each signed a pillar.
OKC Employee Topping Out Ceremony in June 2015
Posted in TierPoint Oklahoma City

OKC data center celebration as employees & workers held a topping out ceremony. Each signed a pillar.

Source: TierPoint Twitter
Minnesota's carrier hotel
The 511 Building
Posted in 511 Building - Minnesota Technology Center

Minnesota's carrier hotel

Satellite View
Posted in FirstLight Burlington Source: Google Maps
Inside the Romulus Facilities
Posted in FirstLight Romulus (Seneca Army Depot) Source: FirstLight Fiber
Outside of the Converted Bunkers
Posted in FirstLight Romulus (Seneca Army Depot) Source: FirstLight Fiber
Rear of the Data Center at 572 S Delong Street
Posted in Flexential Downtown Salt Lake (Delong)
Cirrus Campus Buildout Plan
Posted in Cirrus DS View 78
120 E Van Buren
Posted in 120 E Van Buren - Digital Realty Source: www.digitalrealty.com
120 E Van Buren Outside
Posted in 120 E Van Buren - Digital Realty Source: www.digitalrealty.com
Aerial Exterior
Posted in eBay Arizona
A Crane Lifting a Container onto the Roof
Posted in eBay Arizona Source: eBay
eBay has deployed 4,920 servers in these containerized data centers on the roof of its new data center in Phoenix.
Containers on the Roof of "Project Mercury" in Phoenix
Posted in eBay Arizona

eBay has deployed 4,920 servers in these containerized data centers on the roof of its new data center in Phoenix.

Source: eBay
Project Mercury Under Construction in 2010
Posted in eBay Arizona Source: Encore Steel
Data Center Bones
Posted in eBay Arizona Source: Encore Steel
Inside eBay's Project Mercury
Posted in eBay Arizona Source: DPR
Container Canyon" area
Posted in Microsoft Chicago Northlake
Northlake substation on campus
Posted in Microsoft Chicago Northlake
Gens stacked up
Posted in Microsoft Chicago Northlake Source: MH Architects
Cooling Towers
Posted in Microsoft Chicago Northlake Source: MH Architects
Subsea Cable Path from Hillsboro Data Center
Posted in Flexential Brookwood Source: Flexential
Brookwood Data Center at Night
Posted in Flexential Brookwood Source: Wikimedia Commons, M.O. Stevens
Microsoft's Boydton Virginia Data Center
Posted in Microsoft Boydton VA Source: Microsoft Austria
Microsoft's Boydton Data Center Expansion (in Progress) as of 2018
Posted in Microsoft Boydton VA Source: Google Maps
Satellite View of Internap's Montreal Site
Posted in Internap Montreal
It's hard to get a good shot of the building with so many trees.
Site is Surrounded by Trees
Posted in Internap Montreal

It's hard to get a good shot of the building with so many trees.

Satellite View
Posted in vXchnge Portland Source: Google Maps
We will be developing a campus next to our existing facility that will be home to two new buildings. This new construction will bring our total Prineville footprint to more than 3.2 million square ...
Apple Rendering of 4th and 5th Data Centers in Prineville
Posted in Apple Prineville

We will be developing a campus next to our existing facility that will be home to two new buildings. This new construction will bring our total Prineville footprint to more than 3.2 million square feet and will represent an additional investment of $750 million.

Source: https://www.facebook.com/notes/prineville-data-center/growing-our-presence-in-prineville/10155786565698133/
Apple Prineville DC Overhead
Posted in Apple Prineville
City Document from 2016 Showing Apple's Planned Expansion in Prineville
Posted in Apple Prineville Source: City of Prineville
DC1 Exterior View with distinctive Orange Trim
Posted in Urbacon - Richmond Hill, ON Source: Urbacon
Long Hallway Inside DC1
Posted in Urbacon - Richmond Hill, ON Source: Urbacon
This stacking plan shows the layout of CH1, CH2, and CH4 in the building. The Telx (now Digital Realty) Meet-Me-Room on the 2nd floor. Financial Exchanges such as BATS, CME, and ICE are also noted.
Stack Plan for Equinix Facilities in 350 E Cermak
Posted in Equinix Chicago CH1, CH2, & CH4

This stacking plan shows the layout of CH1, CH2, and CH4 in the building. The Telx (now Digital Realty) Meet-Me-Room on the 2nd floor. Financial Exchanges such as BATS, CME, and ICE are also noted.

Source: Equinix
Rooftop view at 350 E Cermak
Posted in Equinix Chicago CH1, CH2, & CH4
Tierpoint at 1111 Olive Street in St. Louis
Posted in TierPoint St Louis-Olive
XO Facility in Maryland Heights
Posted in XO St Louis 2020 Westport
Exterior view of the original Palo Alto Internet Exchange (PAIX) building
The Original PAIX Building
Posted in Equinix Palo Alto SV8

Exterior view of the original Palo Alto Internet Exchange (PAIX) building

PAIX Building
Posted in Equinix Palo Alto SV8 Source: Equinix
PAIX Building Sign
Posted in Equinix Palo Alto SV8 Source: Wikimapia
Telephone Co Building Sign
Posted in Equinix Palo Alto SV8 Source: Wikimapia
Sign describing that the SV8 location was also the first school in Palo Alto. Established in 1893.
PAIX - First Elementary School Sign
Posted in Equinix Palo Alto SV8

Sign describing that the SV8 location was also the first school in Palo Alto. Established in 1893.

Source: Wikimapia
Sign outside of Google Thornton, CO
Posted in Google Denver Thorton
Outside of Tierpoint PHI at 4775 League Island Blvd
Posted in TierPoint Philadelphia
Yahoo's Chicken Coop Design
Posted in Yahoo Lockport NY Source: Stratus Imaging
Yahoo Oath Facility in Lockport
Posted in Yahoo Lockport NY Source: James Neiss
A Yahoo Semi Truck by the Yahoo Chicken Coop Facility in New York
Posted in Yahoo Lockport NY Source: Buffalo News
Electrical Power Room at NY5
Posted in Equinix New York Secaucus NY5 Source: Equinix
The map on the wall represents Equinix's focus on Interconnection
High Ceilings in the Customer Care Space
Posted in Equinix New York Secaucus NY5

The map on the wall represents Equinix's focus on Interconnection

Source: Equinix
The Customer Area includes a Conference Room and the Classic Red Silo
Posted in Equinix New York Secaucus NY5 Source: Equinix
EQIX NY5 Generators
Posted in Equinix New York Secaucus NY5 Source: Equinix
A View Above the Colo Floor
Posted in Equinix New York Secaucus NY5 Source: Equinix
Exterior View from Broad and Noble Streets
Posted in 401 North Broad St - Netrality Philadelphia
3D Visualization Showing Fiber Risers, MMR, and Elevators
Posted in 401 North Broad St - Netrality Philadelphia Source: Netrality
2nd Floor Meet Meet Room Floor Layout
Posted in 401 North Broad St - Netrality Philadelphia Source: Netrality
Mayan inspired Art Deco Adornments
Posted in 401 North Broad St - Netrality Philadelphia
View of 11 Skyline from Parking Lot
Posted in TierPoint Hawthorne
11 Skyline Hawthorne
Posted in TierPoint Hawthorne
HW2: 17 Skyline Drive
Posted in TierPoint Hawthorne
Outside of EQIX SV6 at 444 Toyama Drive
Posted in Equinix Sunnyvale SV6
Entrance and Campus View
Posted in Equinix Culpeper Campus
Rendering of the proposed CyrusOne Quincy Facility
Posted in CyrusOne Quincy
A Row of Cabinets inside of the Grand Rapids East Data Center
Posted in US Signal Grand Rapids East Source: US Signal
Aerial Tierpoint's Bethlehem Facility
Posted in TierPoint Bethlehem
Lobby and Security Desk at LA3
Posted in Equinix El Segundo LA3 Source: DPR
Just after construction and ready to be filled
Colocation Floor Area
Posted in Equinix El Segundo LA3

Just after construction and ready to be filled

Equinix received a $1 million rebate from Southern California Edison (SCE) for upgrades to the LA3 facility that boosted energy efficiency. The rebate is part of SCE’s program offered to businesses...
Rebate for Energy Efficiency
Posted in Equinix El Segundo LA3

Equinix received a $1 million rebate from Southern California Edison (SCE) for upgrades to the LA3 facility that boosted energy efficiency. The rebate is part of SCE’s program offered to businesses to offset capital investments that result in saving energy.

Pictured (left to right): Dave Robbins, Carl Fung, Mario Lopez, Bill Maloney, Duane Mackenzie, Johnny Lopez, Lisa Cagnolatti, Mary Finn, Raouf Abdel, Michael Seikes, Bill Sewell, Tod Sword.

Source: Equinix
Lebanon Floor Plan
Posted in CyrusOne Cincinnati-Lebanon Source: CyrusOne
SE4 at 6906 S. 204th Street in Kent
Posted in Equinix Seattle SE4 Source: Google Maps
Lobby of CH3
Posted in Equinix Chicago CH3 Source: Equinix
Exterior of CH3
Posted in Equinix Chicago CH3 Source: Equinix
NOTA Side View w Red Paint
Posted in NAP of the Americas - Equinix Miami MI1 Source: Phillip Pessar, Flickr https://www.flickr.com/photos/southbeachcars/21847037816
Nap of the Americas - Overhead
Posted in NAP of the Americas - Equinix Miami MI1 Source: Equinix
NAP when owned by Terremark
Posted in NAP of the Americas - Equinix Miami MI1 Source: Terremark
Front Entrance of Equinix's MI1 site. Circa 2018
Front Entrance of NOTA 2018
Posted in NAP of the Americas - Equinix Miami MI1

Front Entrance of Equinix's MI1 site. Circa 2018

Source: Equinix
Databank DFW2 at twilight
Posted in DataBank North Dallas DFW2
150,000 square foot VA1 data center is an EPA's ENERGY STAR certified facility with 14.4 megawatts of high density critical IT power.
Layout Diagram of VA1 Building
Posted in RagingWire Ashburn VA1/VA2

150,000 square foot VA1 data center is an EPA's ENERGY STAR certified facility with 14.4 megawatts of high density critical IT power.

Source: RagingWire
Computer Room Inside VA1
Posted in RagingWire Ashburn VA1/VA2 Source: RagingWire
H5 Colo Stack Plan
Posted in H5 Colo
Outside of 12712 Park Central Dr in Dallas
Posted in H5 Colo Source: H5 Colo
Row of Cabinets in Beanfield's Suite
Posted in Beanfield 905 King St Source: Beanfield
Fire Suppression System
Posted in Beanfield 905 King St Source: Beanfield
UPS in the Beanfield Suite
Posted in Beanfield 905 King St Source: Beanfield
DC Power is Available
Posted in Beanfield 905 King St Source: Beanfield
Fiber Panels
Posted in Beanfield 905 King St Source: Beanfield
FastE anyone?
Panels for Copper Cross Connects
Posted in Beanfield 905 King St

FastE anyone?

Source: Beanfield
Cable Trays within the Beanfield Suite
Posted in Beanfield 905 King St Source: Beanfield
CLE1 is in the The Sterling Building
Posted in DataBank Cleveland CLE1
Roadside View of T5@LA
Posted in T5 LA
Mason Facility
Posted in CyrusOne Cincinnati-Mason Source: CONE
Data Center at 9999 Westover Hills Blvd, San Antonio
Posted in CyrusOne San Antonio I Source: CyrusOne
Aerial View of Cyxtera TPA1
Posted in Cyxtera Tampa TP1 Source: Google Maps
The data center is sandwiched between Tierpoint and Cisco Systems data centers
Location of New CONE Data Center in Allen
Posted in CyrusOne Allen

The data center is sandwiched between Tierpoint and Cisco Systems data centers

From Left to Right: Laramie Dorris, VP Design & Construction, Kellie Teal-Guess, CPO (Chief People Officer), Gary Caplinger, Allen Mayor Pro Tem Baine Brooks, Allen City Council Member John Hatem, ...
Allen data center ground breaking in October 2017
Posted in CyrusOne Allen

From Left to Right: Laramie Dorris, VP Design & Construction, Kellie Teal-Guess, CPO (Chief People Officer), Gary Caplinger, Allen Mayor Pro Tem Baine Brooks, Allen City Council Member John Hatem, EVP, Operations, Design & Construction, Allen Mayor Stephen Terrell, Robert Jackson, General Counsel, Peter Vargas, City Manager Dan Bowman, Executive Director/CEO, AEDC Danny Cowser, Director, Construction & Design

Exterior of the Massive facility
Posted in CyrusOne Allen
New Colocation Room ready for a deployment (Nov 2018)
Posted in CyrusOne Allen Source: CyrusOne
Aerial Map of the Cluster of Data Centers
Posted in 365 Indianapolis Source: Google Maps
Street View of DC74
Posted in Lumos Charlotte (DC74 CLT4) Source: Google Maps
Cooling Tower at IBM Data Center in Boulder
Posted in IBM Boulder Source: IBM
Battery Room
Posted in IBM Boulder Source: IBM
Switch Room
Posted in IBM Boulder
AB3 at 400 Tijeras Ave
Posted in Cyxtera Albuquerque AB3
Exterior View
Posted in CoreSite Somerville BO1 Source: CoreSite
The building's exterior skin acts like a mirror
800 S Hope Mirrored Exterior
Posted in 800 South Hope

The building's exterior skin acts like a mirror

Databank is within the old Federal Reserve Bank building in Dallas
Posted in DataBank Downtown Dallas DFW1
Inside of MDC in Dublin OH
Posted in Metro Data Center Dublin
Map showing Google (Montauk) and Facebook Campus Locations in New Albany Ohio
Posted in Google New Albany Ohio
Entrance to the Underground Data Center
Posted in Iron Mountain Kansas Underground Source: IRM
Outside of 818 W 7th
Posted in Equinix Los Angeles LA2 Source: John F Gaylord
Site Layout in Durham
Posted in CyrusOne Raleigh-Durham I Source: CyrusOne
CONE facility at 2223 Northeast Creek Parkway in Durham
Posted in CyrusOne Raleigh-Durham I
Digital Realty's Data Center in Needham
Posted in 105 Cabot - Digital Realty Source: DRT
Tierpoint at 15 Shattuck Road in Andover
Posted in TierPoint Andover
Proposed Campus Layout
Posted in CloudHQ Ashburn Campus
Topping Out Cermony
Posted in Facebook Newton (Atlanta) Source: Facebook
The practice of "topping out" a new building can be traced to the ancient Scandinavian religious rite of placing a tree atop a new building to appease the tree-dwelling spirits displaced in its con...
Topping Out: Placing the Last Beam on the First Building
Posted in Facebook Newton (Atlanta)

The practice of "topping out" a new building can be traced to the ancient Scandinavian religious rite of placing a tree atop a new building to appease the tree-dwelling spirits displaced in its construction. Long an important component of timber frame building, it migrated initially to England and Northern Europe, thence to the Americas. [Wikipedia]

Source: Facebook
Last Beam Signing at the Newton Data Center
Posted in Facebook Newton (Atlanta) Source: Facebook
Rendering of the Proposed Newton Data Center in Stanton Springs
Posted in Facebook Newton (Atlanta) Source: Facebook
Exterior Entrance
Posted in 2260 E El Segundo - Digital Realty Source: DRT
Inside a DRT Colo Room at 2260
Posted in 2260 E El Segundo - Digital Realty
Computer Room Air Conditioning Units line the Wall of the Colocation Room
Posted in vXchnge Austin
Exterior Front of the Building
Posted in vXchnge Austin
Electrical Switch Room
Posted in vXchnge Austin
Illustration of Planned Renovation
Posted in NJFX New Jersey Fiber Exchange Source: NJFX
JAX2 at 4800 Spring Park Road
Posted in Cologix Jacksonville JAX2
Site Plan for LA3
Posted in CoreSite LA3 Source: ADSP
Rendering of LA3 next to LA2
Posted in CoreSite LA3
EdgeConnex at 1541 Pama Lane in Las Vegas
Posted in EdgeConneX Las Vegas
The Pama Technology Center is a four building complex
Edgeconnex is located in the Pama Technology Center
Posted in EdgeConneX Las Vegas

The Pama Technology Center is a four building complex

Rendering of the Atlanta Campus
Posted in Switch Atlanta: The KEEP Source: Switch
vXchange facility at 111TSP
Posted in vXchnge Jersey City Source: Google Maps
Andrew Silvestri, Google head of data center public policy & community development; Gov. Steve Sisolak; U.S. Rep. Susie Lee, D-Nevada; U.S. Sen. Jacky Rosen, D-Nevada; Jacqueline Fuller, vice presi...
Officials throw a ceremonial shovel of dirt during a Google Nevada data center investment announcement in Henderson on Monday, July 1, 2019, in Las Vegas
Posted in Google Henderson NV

Andrew Silvestri, Google head of data center public policy & community development; Gov. Steve Sisolak; U.S. Rep. Susie Lee, D-Nevada; U.S. Sen. Jacky Rosen, D-Nevada; Jacqueline Fuller, vice president of Google and president of Google.org.; and city of Henderson Mayor Pro tem Dan Shaw

Source: L.E. Baskow/Las Vegas Review-Journal
Andrew Silvestri, Google head of data center public policy & community development, at the construction site during a Google Nevada data center investment announcement in Henderson on Monday, July ...
Andrew Silvestri at the Google launch in July 2019
Posted in Google Henderson NV

Andrew Silvestri, Google head of data center public policy & community development, at the construction site during a Google Nevada data center investment announcement in Henderson on Monday, July 1, 2019, in Las Vegas.

Source: L.E. Baskow/Las Vegas Review-Journal
Photo taken in March 2019
Aerial view of the Google Data Center under construction in Henderson, Nevada
Posted in Google Henderson NV

Photo taken in March 2019

Boundaries of the Google henderson data center campus
Posted in Google Henderson NV
Exterior View of Unisys's Data Center in Egan Minnesota
Posted in Unisys Eagan
Unisys Data Center in Eagan, MN
Posted in Unisys Eagan
The stacking plan diagram shows the building's tenants and high level layout with in the building
165 Halsey Stacking Plan
Posted in 165 Halsey

The stacking plan diagram shows the building's tenants and high level layout with in the building

Exterior View
Posted in 165 Halsey
165 Halsey
Posted in 165 Halsey Source: Tishman Real Estate
Rooftop for 165 Halsey is Filled with Generators and HVAC Chillers
Posted in 165 Halsey
The diagram shows the building's 9th floor MMR and POE fiber paths from the street into the building
3D Visualization Showing Fiber Risers, MMR, and Manholes
Posted in 325 Hudson Street - Netrality New York

The diagram shows the building's 9th floor MMR and POE fiber paths from the street into the building

Source: Jamestown
8th Colo and 9th floor MMR areas.
Meet Me Room Floor Plans
Posted in 325 Hudson Street - Netrality New York

8th Colo and 9th floor MMR areas.

Source: Jamestown
Door to Colo Area
Posted in 325 Hudson Street - Netrality New York Source: Jamestown
Pretty Conduit
Posted in 325 Hudson Street - Netrality New York Source: Jamestown
The Antennas Have a Good View
Rooftop
Posted in 325 Hudson Street - Netrality New York

The Antennas Have a Good View

Source: Jamestown
The data center is expected to be completed in Spring of 2019.
Rendering of Vantage's New Campus in Santa Clara
Posted in Vantage Santa Clara SC2

The data center is expected to be completed in Spring of 2019.

Empty Lot in a Satellite Picture Taken Before Start of Construction
Posted in Vantage Santa Clara SC2 Source: Google Maps
Front Lobby of HE's Fremont 2 Site
Posted in Hurricane Electric Fremont 2 Source: he.net
Entrance at 48233 Warm Springs Blvd
Posted in Hurricane Electric Fremont 2
The Fremont 2 Colocation Facility is arranged with “warm and cold” rows. The front of each cabinet faces a cold row, drawing air from the front and venting through the rear to the warm row.
Hot and Cold Rows
Posted in Hurricane Electric Fremont 2

The Fremont 2 Colocation Facility is arranged with “warm and cold” rows. The front of each cabinet faces a cold row, drawing air from the front and venting through the rear to the warm row.

Source: he.net
Exterior of 720 2nd Street in Oakland
Posted in 720 2nd - Digital Realty
Aerial View of 720 2nd and Port of Oakland
Posted in 720 2nd - Digital Realty
Phase I on the Alliance Texas development is pictured
Facebook is expanding the Fort Worth campus
Posted in Facebook Fort Worth

Phase I on the Alliance Texas development is pictured

Source: Dallasnews.com
Data Center Aisle on the Alliance Campus
Posted in Facebook Fort Worth Source: Facebook
Break Area with Colorful Wall Art
Posted in Facebook Fort Worth Source: Facebook
Admin Building on Campus
Posted in Facebook Fort Worth Source: Facebook
Structured Cabling and Cabinets on FB's Fort Worth Campus
Posted in Facebook Fort Worth Source: Facebook
QuadraNet's Network Operations Center (NOC) in LA
Posted in QuadraNet LAX (Century) Source: Quadranet
The new Santa Clara data center will be ready in 2020.
Rendering of SV1
Posted in Ragingwire Santa Clara SV1

The new Santa Clara data center will be ready in 2020.

Source: RagingWire
Rendering of the Base Isolation System
Posted in Ragingwire Santa Clara SV1 Source: RagingWire
Outside of 350 E Cermak
Posted in 350 E Cermak - Digital Realty
Rendering of DRT's planned 12-story Data Center at 330 East Cermak
Posted in 350 E Cermak - Digital Realty Source: Digital Realty Trust
Rendering of DC Blox Development on former Trinity Steel lot
Posted in DC BLOX Birmingham
Trinity Lot Location
Posted in DC BLOX Birmingham
The campus could potentially reachj $785 million
Phased Plan for the Campus Buildout
Posted in DC BLOX Birmingham

The campus could potentially reachj $785 million

Photo taken in May 2019
DCBlox Almost Ready to Launch
Posted in DC BLOX Birmingham

Photo taken in May 2019

The site's address is 12200 Herbert Wayne Court
Street View of SunGard's Site in Huntersville NC
Posted in SunGard Charlotte

The site's address is 12200 Herbert Wayne Court

Electrical Substation
Posted in 3000 Skyline Dallas
Ready for Development
Posted in 3000 Skyline Dallas
3000 Skyline is well situated to take advantage of the East Dallas Fiber Loop, which provides redundant connectivity to Dallas’ major carrier hotels, including 1950 Stemmons, 2323 Bryan, 400 South ...
Fiber Loop from 3000 to Downtown
Posted in 3000 Skyline Dallas

3000 Skyline is well situated to take advantage of the East Dallas Fiber Loop, which provides redundant connectivity to Dallas’ major carrier hotels, including 1950 Stemmons, 2323 Bryan, 400 South Akard, and 4100 Bryan.

Exterior View
Posted in CloudHQ Manassas MCC1 Source: CloudHQ
Floor Layout for Phases I through IV
Posted in Carrier-1 Source: Carrier-1
Power Room at 1515 Round Table Drive
Posted in Carrier-1 Source: Carrier-1
Exterior View of Carrier-1
Posted in Carrier-1
VA-1 Launch Event in September 2017
Posted in Iron Mountain Northern Virginia (Manassas) Source: WTOP
Building Layout
Posted in STACK Dallas Source: Stack Infra
Aerial Photo of the Alliance Campus
Posted in STACK Dallas Source: STACK
416 MWs?!
STACK Dallas Masterplan
Posted in STACK Dallas

416 MWs?!

Source: STACK
The site was previously built and operated by Infomart before rebranding to STACK in January 2019.
Site Layout for STACK Portland
Posted in STACK Portland

The site was previously built and operated by Infomart before rebranding to STACK in January 2019.

Source: Stack Infra
Aerial View of Infomart Portland
Posted in STACK Portland Source: Infomart Data Centers
Facility Entrance
Posted in CyrusOne Somerset
Hostway's Site is within this Bentall Tower
Posted in Hostway Vancouver
Exterior View
Posted in Sabey Intergate.Manhattan Source: InformationWeek
This squeaky clean space on the 6th floor has everything but the computers. Note the absence of raised floors. In this facility, servers will be placed on concrete slabs. Air supply travels through...
6th Floor Computer Room
Posted in Sabey Intergate.Manhattan

This squeaky clean space on the 6th floor has everything but the computers. Note the absence of raised floors. In this facility, servers will be placed on concrete slabs. Air supply travels through the walls from the computer room air handler units that can be adjusted as necessary.

Source: InformationWeek
Rendering of 6th Floor When When Filled With Rows of Cabinets
Posted in Sabey Intergate.Manhattan Source: Sabey
The 5th floor houses the data center's uninterruptable power supply systems and backup batteries. The UPS room itself is redundant, too. There are four of these UPS rooms.
5th Floor UBS Room
Posted in Sabey Intergate.Manhattan

The 5th floor houses the data center's uninterruptable power supply systems and backup batteries. The UPS room itself is redundant, too. There are four of these UPS rooms.

Source: InformationWeek
The chiller plant on the 4th floor of the data center is comprised of condenser water pumps and risers that are responsible for maintaining the appropriate temperature in the data center. The ceili...
Chiller Plant on the 4th Floor
Posted in Sabey Intergate.Manhattan

The chiller plant on the 4th floor of the data center is comprised of condenser water pumps and risers that are responsible for maintaining the appropriate temperature in the data center. The ceilings in this area are 23 feet high. As the temperature cools down outside the building, the chillers can be dialed back.

Source: InformationWeek
4th Floor Caterpillar Generators
Posted in Sabey Intergate.Manhattan
Verizon Building Before Renovation
Posted in Sabey Intergate.Manhattan
Before - After Renovation
Posted in Sabey Intergate.Manhattan Source: 6sqft.com
Verizon Building After Renovation
Posted in Sabey Intergate.Manhattan
View of 32 Avenue of the Americas from 375 Pearl Street (Sabey)
Posted in Sabey Intergate.Manhattan
NTT Property Was Sold to GI Partners in January 2019
Posted in NTT 2300 W Plano Source: Google Maps
NTT Data in Plano
Posted in NTT 2300 W Plano
NTT Data Sign on Plano Parkway
Posted in NTT 2300 W Plano
Involta in Mario IA
Posted in Involta: Cedar Rapids
Street View
Posted in 151 Front Street Source: Allied
Large fiber trays are needed to support all the interconnection at Toronto's carrier hotel.
Large Fiber Tray at 151
Posted in 151 Front Street

Large fiber trays are needed to support all the interconnection at Toronto's carrier hotel.

Source: Allied
Roof of 151 Front Street is Crowded with Gens and Cooling Equipment
Posted in 151 Front Street Source: Google Maps
Outside of CoreSite's MI1 in Miami
Posted in CoreSite Miami MI1 Source: CoreSite
Security Desk at CoreSite MI1
Posted in CoreSite Miami MI1 Source: CoreSite
Customer Colocation Floor Space at CoreSite's MI1 Site
Posted in CoreSite Miami MI1 Source: CoreSite
Cologix's Vancouver 2 site
1050 West Pender Street
Posted in Cologix VAN2

Cologix's Vancouver 2 site

Outside of the Lenexa Facility
Posted in TierPoint Kansas City-Lenexa
Exterior View of Consolidated Facility at 9669 Lackman Road
Posted in Consolidated Lenexa
Overview of T5's Campus at King Mountain
Posted in T5 Kings Mountain
100 Taylor Carrier Hotel
Posted in H5 San Antonio - 100 Taylor
Drone shot of the facility on 9340 Godwin Drive
Posted in QTS Manassas
The Manassas facility as construction was completing in February 2019
Posted in QTS Manassas
Looking southeast across Front and Parliament streets to the new Downtown Data Centre
Posted in Urbacon Toronto - 281 Front Street Source: Urbacon
Ground Floor Layout
Posted in Urbacon Toronto - 281 Front Street Source: Urbacon
Typical Data Floor
Posted in Urbacon Toronto - 281 Front Street Source: Urbacon
The site was built next to Equinix's TR2 site in downtown Toronto
The Site is Adjacent to Equinix TR2
Posted in Urbacon Toronto - 281 Front Street

The site was built next to Equinix's TR2 site in downtown Toronto

Source: Urbacon
Involta on Technology Drive
Posted in Involta-Duluth
Parking Garage Next to DC Blox's Atlanta
Posted in DC BLOX Atlanta
At Night
Posted in 1025Connect Source: 1025 Connect
1025Connects Vision for a Manhattan Bypass
Posted in 1025Connect
Exterior of Evoque BO1 outside of Boston
Posted in Evoque Watertown BO1
Stackplan
Posted in DataGryd Source: DataGryd
Floor Layout Configuration
Posted in DataGryd Source: DataGryd
There is an administrative building between the two data center phases.
Overhead View of DFW1 and DFW2
Posted in Cyxtera Dallas DFW1

There is an administrative building between the two data center phases.

Source: Google Maps
Power and Cooling Capacities
Posted in Cyxtera Dallas DFW1 Source: Cyxtera
Back of the Data Center
Posted in Cyxtera Dallas DFW1 Source: Google Maps
Customer Colo Room
Posted in Element Critical SV1
1805 Center Park Drive
Posted in TierPoint Charlotte 4
Left to right: Senator Michael Roberson, Commissioner Steve Sisolak, Switch Founder and CEO Rob Roy, UNLV’s Metal Rebel Robot, Governor Brian Sandoval, Senator Aaron Ford and Dr. Paul Oh celebrate ...
Ribbon Cutting during SuperNap 9 Launch
Posted in Switch Las Vegas 9

Left to right: Senator Michael Roberson, Commissioner Steve Sisolak, Switch Founder and CEO Rob Roy, UNLV’s Metal Rebel Robot, Governor Brian Sandoval, Senator Aaron Ford and Dr. Paul Oh celebrate the ribbon-cutting of SuperNAP Las Vegas 9

Source: Switch
Construction of the Ericson Facility Almost Complete in 2016
Posted in Ericson Vaudreuil
Satellite View
Posted in Ericson Vaudreuil Source: Google Maps
200 Paul After Renovation
Posted in 200 Paul (SFR1) Digital Realty
Exterior View
Posted in 111 8th Avenue
Exterior View
Posted in 111 8th Avenue
The 12,690 sq ft greenfield DC BLOX Huntsville data center is capable of delivering up to 20 MW of power
Exterior View
Posted in DC BLOX Huntsville

The 12,690 sq ft greenfield DC BLOX Huntsville data center is capable of delivering up to 20 MW of power

Source: Brasfield & Gorrie
Inside DCBlox Colo Room
Posted in DC BLOX Huntsville
Colocation Room
Posted in DC BLOX Huntsville Source: Brasfield & Gorrie
The site opened in 2018.
Rendering From the Air
Posted in DC BLOX Huntsville

The site opened in 2018.

DC Blox CEO Jeff Uphues Speaks at Ribbon Cutting Ceremony
Posted in DC BLOX Huntsville Source: AI.com, Paul Gattis
Carrollton Facility at Twilight
Posted in CyrusOne Carrollton Source: CyrusOne
The Carrollton Site Layout
Posted in CyrusOne Carrollton Source: CyrusOne
The building features 30,000 square feet of customer office space, a modern cafeteria, a gym area with workout machines, and unique recreation space featuring a climbing wall, circular slide and a ...
Carrollton Amenities
Posted in CyrusOne Carrollton

The building features 30,000 square feet of customer office space, a modern cafeteria, a gym area with workout machines, and unique recreation space featuring a climbing wall, circular slide and a putting green.

Rock Climbing Wall and Putting Green
Posted in CyrusOne Carrollton Source: CyrusOne
The facility was acquired in 2019 by GI Partners in a sale-leaseback transaction
Exterior of NTT Data's Facility in Quincy
Posted in NTT Data Quincy

The facility was acquired in 2019 by GI Partners in a sale-leaseback transaction

Campus plan
Posted in Data Foundry Data Ranch Austin Campus Source: Data Foundry
QTS's Site in Sandston (Richmond)
Posted in QTS Richmond
Aerial Rendering of QTS's Irving Data Center
Posted in QTS Irving Source: Walker Engineering
The semiconductor manufacturing facility 'bones' provides an excellent weight-bearing structure for the data center
Flooring Structure Exposed During Renovation
Posted in QTS Irving

The semiconductor manufacturing facility 'bones' provides an excellent weight-bearing structure for the data center

Front Door Entrance
Posted in QTS Irving
Aerial Rendering of QTS's Irving Data Center
Posted in QTS Irving Source: QTS
Exterior from the Street
Posted in 818 West 7th
The building was previously to be the Barker Brothers Furniture Store building. Picture was taken circa 1926
The Barker Brothers Furniture Store Building
Posted in 818 West 7th

The building was previously to be the Barker Brothers Furniture Store building. Picture was taken circa 1926

Terago's VAN2 Site is Within the 900 W Hastings Tower
Posted in TeraGo Vancouver Vault
Cosentry acquired the facility from Red Anvil in 2013
Photo Taken pre-2016 when the Facility was Operated by Cosentry
Posted in TierPoint Milwaukee-Burnham

Cosentry acquired the facility from Red Anvil in 2013

Source: Cosentry
DataBank's Network Ring in Dallas
Posted in DataBank Dallas DFW3
Artist Rendering of DataBank's Newest Site in Dallas
Posted in DataBank Dallas DFW3 Source: DataBank
Meeting Room at DFW3
Posted in DataBank Dallas DFW3
LEDs Paint a Futuristic Picture
Posted in DataBank Dallas DFW3
Entrance Amenities
Posted in DataBank Dallas DFW3
Layout of the Meritex Lenexa Executive Park Cave
Posted in Cavern Technologies Source: Meritex
Entrance to the Meritex Lenexa Executive Park
Posted in Cavern Technologies
Underground Entrance
Posted in Cavern Technologies Source: Cavern Technologies
Power Room
Posted in Cavern Technologies Source: Cavern Technologies
SubTopolis hosts an annual Groundhog Run for the last 35+ years. The event, 5K and 10K runs hare typically hosted in January
Annual Groundhog Run in the cave
Posted in Cavern Technologies

SubTopolis hosts an annual Groundhog Run for the last 35+ years. The event, 5K and 10K runs hare typically hosted in January

Source: SubTropolis
Satellite View of Midlands Facility in Papillion
Posted in TierPoint Omaha Midlands Source: Google Maps
RagingWire has spent money to money to build in data center amenities and good aesthetics. The lobby of VA3 is no exception.
Lobby of VA3
Posted in RagingWire Ashburn VA3

RagingWire has spent money to money to build in data center amenities and good aesthetics. The lobby of VA3 is no exception.

Source: RagingWire
The 78-acre fenced campus can support up to 7 buildings with a total critical power load of 108 MW.
Planned Ashburn Campus Building Layout
Posted in RagingWire Ashburn VA3

The 78-acre fenced campus can support up to 7 buildings with a total critical power load of 108 MW.

Source: RagingWire
RagingWire plans 7 buildings on the campus. VA3, VA4, VA5, VA6, VA7, VA8, and VA9.
Ashburn Campus Building Overview
Posted in RagingWire Ashburn VA3

RagingWire plans 7 buildings on the campus. VA3, VA4, VA5, VA6, VA7, VA8, and VA9.

Source: RagingWire
Rendering of the Supernap Pyramid Campus
Posted in Switch SUPERNAP Pyramid Grand Rapids
Rendering of the Switch PYRAMID
Posted in Switch SUPERNAP Pyramid Grand Rapids Source: Switch.com
Equinix offers the Fiber Connect product between EQIX AT1 (at 180 Peachtree) and EQIX AT2/3 (at 56 Marietta)
Fiber Connect between AT1 and AT2
Posted in Equinix Atlanta AT1

Equinix offers the Fiber Connect product between EQIX AT1 (at 180 Peachtree) and EQIX AT2/3 (at 56 Marietta)

Source: EQIX
Exterior of 180 Peachtree at Twilight
Posted in Equinix Atlanta AT1
Conduits Galore
Posted in Equinix Atlanta AT1 Source: Stevens & Wilkinson
Before it was a data center, the building held a major department store. The store was called Davison's before rebranding as Macy's. The store closed its doors in 2003.
180 Peachtree Was Formerly a Department Store
Posted in Equinix Atlanta AT1

Before it was a data center, the building held a major department store. The store was called Davison's before rebranding as Macy's. The store closed its doors in 2003.

Anyone up for a game of Ping Pong?
Ping Pong Stadium
Posted in Equinix Atlanta AT1

Anyone up for a game of Ping Pong?

Large Satellite Dish
Posted in 1547 AlohaNAP
Drone View of the CLS
Posted in 1547 AlohaNAP
Data Center Layout of showing the colocation rooms, Meet Me Room, Mechanical, and Switch Gear.
Floor Plan
Posted in 1547 AlohaNAP

Data Center Layout of showing the colocation rooms, Meet Me Room, Mechanical, and Switch Gear.

Outside of 34 St Martin Drive
Posted in TierPoint Marlborough
Taken during a TechPalooza event in June 2018
TierPoint's Staff in Boston
Posted in TierPoint Marlborough

Taken during a TechPalooza event in June 2018

Source: Twitter
Lobby Check-In Desk
Posted in Hurricane Electric Fremont 1 Source: he.net
The Fremont 1 Data Center includes 12 rows of 84 cabinets each (1,008 total)
12 Rows of 84 Cabinets
Posted in Hurricane Electric Fremont 1

The Fremont 1 Data Center includes 12 rows of 84 cabinets each (1,008 total)

Mechanical Room
Posted in QTS Princeton Source: QTS
The QTS Princeton Solar Array is a 14.1 Megawatt Photovoltaic System, one of the largest, privately owned, net metered photovoltaic systems in the Western Hemisphere. The Solar Array occupies appro...
QTS Princeton Solar Array is a 14.1 Megawatt Photovoltaic System
Posted in QTS Princeton

The QTS Princeton Solar Array is a 14.1 Megawatt Photovoltaic System, one of the largest, privately owned, net metered photovoltaic systems in the Western Hemisphere. The Solar Array occupies approximately 50 acres of a 194 acre campus. The PV system contains over 57,000 solar modules, 24 power inverters and was constructed on a portion of the campus that was previously used for an agricultural purpose. The project site is surrounded on two sides by existing residential neighborhoods which resulted in the need to address both the visual and the physical impact of the extensive renewable energy facility on the adjacent community.

Front of the unassuming building
Posted in QTS Princeton
Conduits bringing in external fiber networks
Conduits
Posted in JAX NAP 421 W Church

Conduits bringing in external fiber networks

Source: JAXNAP
Involta data center at 1450 S Eagle Flight Way in Boise
Posted in Involta Boise
vXchnge facility is in the downtown building at 200 W Prospect Ave in Cleveland
Posted in vXchnge Cleveland Source: Google Maps
Inside Disney's Data Center in North Carolina
Posted in Disney Kings Mountain NC Source: EDG2.com
Inside Disney's Data Center in North Carolina
Posted in Disney Kings Mountain NC
Satellite View
Posted in 40 Perimeter Center: Lincoln Rackhouse Source: Google Maps
Digital West's San Luis Obispo Facility
Posted in Digital West Networks
Rendering of DataBanks New ATL1 Site
Posted in DataBank Atlanta ATL1 Source: DataBank
Facility at 7190 Industrial Rd in Florence
Posted in CyrusOne Kentucky Source: CyrusOne
EQIX SV14 at 2960 Corvin Drive
Posted in Equinix Santa Clara SV14
CoreSite Office Area on 1st Floor
Posted in CoreSite Los Angeles (LA1) One Wilshire Source: COR
The Mastercard Campus has Earned Green Building LEED Certification
Posted in Mastercard Technology Campus Missouri
Facility at 1905 E 6th when operated by Alpheus
Posted in LOGIX Austin (1905 E 6th)
One Wilshire
Posted in One Wilshire Building Source: Hines
Doorway to Meet Me Room at One Wilshire
Posted in One Wilshire Building Source: Wired
Vacant and Undeveloped Floor at OW
Posted in One Wilshire Building Source: One-Wilshire.com
Antenna Mast on the Roof of One Wilshire
Posted in One Wilshire Building Source: One-Wilshire.com
Sunset at 624 S Grand Ave
Posted in One Wilshire Building
Entrance to the Underground Data Center
Posted in Iron Mountain The Underground Source: IRM
The walls still have rock walls
NOC at WPA-1
Posted in Iron Mountain The Underground

The walls still have rock walls

In this photo taken Dec. 14, 2016, overhead pipes carry water from an underground reservoir to help cool the data center systems at Iron Mountain's underground data center in Butler County, Pennsyl...
Overhead pipes carry water to cool the data center
Posted in Iron Mountain The Underground

In this photo taken Dec. 14, 2016, overhead pipes carry water from an underground reservoir to help cool the data center systems at Iron Mountain's underground data center in Butler County, Pennsylvania.

Source: DARRELL SAPP, Pittsburgh Post-Gazette
Satellite View Next to IAD74
Posted in Amazon IAD-73
AWS Facility IAD-73
Posted in Amazon IAD-73
The AIS Flagship Building at 9305 Lightwave Ave
Posted in AIS Lightwave (LWDC)
The facility serves two primary clients: Northrop Grumman IT and the Virginia Information Technologies Agency, which oversees the state’s technology infrastructure.
Bird's eye view
Posted in Virginia Information Technologies Agency

The facility serves two primary clients: Northrop Grumman IT and the Virginia Information Technologies Agency, which oversees the state’s technology infrastructure.

Google's Lenoir Facility at Twilight
Posted in Google Lenoir NC Source: Google
Google Sign at Entrance
Posted in Google Lenoir NC
Cologix VAN1 is located with in the Harbour Centre
Posted in Cologix VAN1
Exterior of 3011 Lafayette
Posted in 3011 Lafayette - Digital Realty Source: DRT
Digital Realty’s data center in Chandler, Arizona, is at the southern edge of Phoenix’s sprawl, near a massive Intel plant, and companies like Orbital ATK and Iridium. It is one of the largest in A...
DRT Chandler
Posted in 2121 S Price - Digital Realty

Digital Realty’s data center in Chandler, Arizona, is at the southern edge of Phoenix’s sprawl, near a massive Intel plant, and companies like Orbital ATK and Iridium. It is one of the largest in Arizona.

Source: Center for Land Use Interpretation
Overland is also the QTS headquarters
Posted in QTS Overland Park
AMC's Cage Area at 325 Hudson
Posted in Atlantic Metro LGA1
Construction Almost Complete in 2013
Posted in CyrusOne Chandler Phoenix Campus Source: Bergelectric
First Chandler Facility Under Construction in 2012
Posted in CyrusOne Chandler Phoenix Campus Source: Bergelectric
Data Hall
Posted in CyrusOne Chandler Phoenix Campus Source: CyrusOne
Energy Labs Hybrid Systems utilize a perimeter base frame constructed of Structural Steel to insure minimum deflection
Energy Labs HVAC Cooling System
Posted in CyrusOne Chandler Phoenix Campus

Energy Labs Hybrid Systems utilize a perimeter base frame constructed of Structural Steel to insure minimum deflection

Source: CyrusOne
The Architectural Beautiful Entrance to CyrusOne's Chandler Facility
Posted in CyrusOne Chandler Phoenix Campus Source: JE Dunn
Elegant Lobby
Posted in CyrusOne Chandler Phoenix Campus Source: JE Dunn
Drop Ceiling
Posted in CyrusOne Chandler Phoenix Campus Source: JE Dunn
Spartan decor, but functional
Lobby for Building #4
Posted in CyrusOne Chandler Phoenix Campus

Spartan decor, but functional

Building #4 Rooftop Mechanical
Posted in CyrusOne Chandler Phoenix Campus
The water storage tanks hold up to 240,000 gallons (900,000 liters) of water at any given time. The insulated tanks holds water to be used for cooling the data center.
240,000 Gallon Water Tanks
Posted in Google Berkeley County South Carolina

The water storage tanks hold up to 240,000 gallons (900,000 liters) of water at any given time. The insulated tanks holds water to be used for cooling the data center.

Source: Google
Yahoo Japan’s data center will be built using Open Compute Project designs for the sake of increasing efficiency. By processing data in the United States, the company claims to have reduced its ele...
Rendering of Yahoo Japan's Facility Under Construction
Posted in Yahoo Japan East Wenatchee

Yahoo Japan’s data center will be built using Open Compute Project designs for the sake of increasing efficiency. By processing data in the United States, the company claims to have reduced its electricity costs to a sixth of what it would have paid if it remained confined to Japan.

Source: Yahoo Japan
Yahoo Japan team breaks ground on East Wenatchee data center
Posted in Yahoo Japan East Wenatchee Source: Yahoo Japan
A priest blesses the construction site in East Wenatchee WA
Posted in Yahoo Japan East Wenatchee Source: Yahoo Japan
Meeting Space Inside Digital's TOR1 Toronto site
Posted in 1 Century Place (TOR1) Digital Realty
Digital's new Toronto Site was Formerly the Toronto Star Printing Facility
Posted in 1 Century Place (TOR1) Digital Realty
QTS at 11234 NW 20th Street
Posted in QTS Miami
Exterior View of FedEx Facility
Posted in FedEx Enterprise Data Center–West (EDC-W) Source: Swanson Rink
60 Hudson with NYC Skyline
Posted in 60 Hudson Street
Historic Picture of the Western Union Telegraph Building in New York
Posted in 60 Hudson Street Source: Irving Underhill
Landmark Entrance
Posted in 60 Hudson Street
The Telx Meet Me Room before being acquired by Digital Realty
Telx Meet Me Room
Posted in 60 Hudson Street

The Telx Meet Me Room before being acquired by Digital Realty

Source: Telx
The Telegraph Capitol of the World
Posted in 60 Hudson Street
The Western Union Building on Hudson Street is approximately 4 blocks from the AT&T Long Lines Building on 6th Street
Two of NYC's Telecom Hotels are in Close Proximity
Posted in 60 Hudson Street

The Western Union Building on Hudson Street is approximately 4 blocks from the AT&T Long Lines Building on 6th Street

A construction crane collapsed in Lower Manhattan Feb 5th 2016, crushing a row of parked cars and killing one man and injuring several others.
2016 Crane Collapsed in High Winds
Posted in 60 Hudson Street

A construction crane collapsed in Lower Manhattan Feb 5th 2016, crushing a row of parked cars and killing one man and injuring several others.

Source: ABC News
Front Gate
Posted in COPT DC-6
Campus View
Posted in COPT DC-6
DC6 Substation Connections
Posted in COPT DC-6
Suites available as of 2017
DC6 Suites
Posted in COPT DC-6

Suites available as of 2017

Main Distribution Switchgear
Posted in COPT DC-6
The inertia flywheel provides conditioned uninterrupted power to data center equipment
HITEC Flywheel
Posted in COPT DC-6

The inertia flywheel provides conditioned uninterrupted power to data center equipment

Ready for a customer deployment
An Empty Data Hall
Posted in COPT DC-6

Ready for a customer deployment

Cabinet Row at FirstLight Fiber in Manchester NH
Posted in FirstLight Manchester Source: FirstLight Fiber
HP (EDS) Data Center in Tulsa
Posted in HP Cherokee Data Center (Tulsa)
Blue Hill data center in Pearl River
Posted in Blue Hill: Pearl River
Blue Hill in Shelton
Posted in Blue Hill: Shelton, CT
Flexential Alpharetta Expansion
Posted in Flexential Atlanta-Alpharetta
Lincoln Rackhouse Aurora Facility
Posted in 4267 Meridian Pkwy: Lincoln Rackhouse
Exterior of Rackspace's Facility Near the MCI Airport
Posted in Rackspace Kansas City MC1 Source: Google Maps
The Rackspace Facility in KC was Previously a LayeredTech Site
Posted in Rackspace Kansas City MC1 Source: Google Maps
Suite 4004 is 500 kW and 4,631 square feet.
Layout of Suite 4004
Posted in Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy

Suite 4004 is 500 kW and 4,631 square feet.

Source: Infomart Data Centers
DA2 Red Silo
Posted in Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy Source: Turner Construction Company
DA2 Hallway and Cages
Posted in Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy Source: Turner Construction Company
DA2 Empty Cages
Posted in Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy Source: Turner Construction Company
EQIX DA2
Posted in Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy Source: Turner Construction Company
Main Atrium at the Infomart
Posted in Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy Source: Equinix
Note the width of the yellow fiber trays. There must be alot of cross connects in the facility!
Classic Equinix Yellow Fiber Trays
Posted in Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy

Note the width of the yellow fiber trays. There must be alot of cross connects in the facility!

Compass built the data center.
Pre-Construction Rendering of the Facility
Posted in Tierpoint Dallas-Allen

Compass built the data center.

Source: Compass
Ribbon Cutting Launch of the Allen Facility in May 2017
Posted in Tierpoint Dallas-Allen Source: TierPoint Twitter
ByteGrid Lobby WDC-2
Posted in 12401 Prosperity Dr: Lincoln Rackhouse Source: ByteGrid
Teal Generator
Posted in 12401 Prosperity Dr: Lincoln Rackhouse Source: ByteGrid
Security Gate
Posted in 12401 Prosperity Dr: Lincoln Rackhouse Source: ByteGrid
MDC-2 has 3,500 ft² that is equipped to inventory over 500,000 storage tapes.
3,500 Sqft of Space for Tape Storage
Posted in 12401 Prosperity Dr: Lincoln Rackhouse

MDC-2 has 3,500 ft² that is equipped to inventory over 500,000 storage tapes.

Source: ByteGrid
Tulsa Ribbon Cutting Ceremony in March 2018
Posted in TierPoint Tulsa Source: TierPoint Twitter
The data center constructed by Compass and launched in March 2018
Rendering of TierPoint's Tulsa Site
Posted in TierPoint Tulsa

The data center constructed by Compass and launched in March 2018

Source: TierPoint
TekPark Expansion Ceremony in September 2016
Posted in TierPoint Allentown (TekPark) Source: TierPoint Twitter
Microsoft Campus in Quincy
Posted in Microsoft Quincy MWH Source: Microsoft
ITPACs at Microsoft's Quincy Campus
Posted in Microsoft Quincy MWH Source: Microsoft
TierPoint CEO Jerry Kent, Maryland Lt. Governor Rutherford and other local officials celebrate the grand opening of our newest Maryland facility with a ceremonial ribbon cutting!
Ribbon Cutting Ceremony in June 2018
Posted in TierPoint Baltimore BWI

TierPoint CEO Jerry Kent, Maryland Lt. Governor Rutherford and other local officials celebrate the grand opening of our newest Maryland facility with a ceremonial ribbon cutting!

Source: TierPoint Twitter
Taken during the June 2018 launch of the BWI site
TierPoint's Technical Staff in Baltimore
Posted in TierPoint Baltimore BWI

Taken during the June 2018 launch of the BWI site

Source: TierPoint Twitter
11 North Pearl in Albany
Posted in Level3 Albany (11 N Pearl)
Valley Forge Expansion Ceremony in June 2015
Posted in TierPoint Valley Forge
Image created by Digital Realty before the sale of St Louis's two carrier hotels (to Netrality) which are in close proximity to each other.
Proximity of 210 and 900 Carrier Hotels
Posted in 210 N Tucker (Netrality) St Louis Carrier Hotel

Image created by Digital Realty before the sale of St Louis's two carrier hotels (to Netrality) which are in close proximity to each other.

Source: Digital Realty Trust
210 Tucker is owned by Netrality Properties
Exterior from the Street
Posted in 210 N Tucker (Netrality) St Louis Carrier Hotel

210 Tucker is owned by Netrality Properties

Construction Photo of the FB Los Lunas Data Center
Posted in Facebook Los Lunas Source: Santa Fe New Mexian
Construction Photo of the FB Los Lunas Data Center
Posted in Facebook Los Lunas Source: Santa Fe New Mexian
A logistics specialist uses a tug to move a server rack in one of the data halls at the newly opened Facebook data center in Los Lunas
Moving In: Facebook Opens the Los Lunas in February 2019
Posted in Facebook Los Lunas

A logistics specialist uses a tug to move a server rack in one of the data halls at the newly opened Facebook data center in Los Lunas

Source: Jim Thompson-Albuquerque Journal
Game Room for Facebook Employees
Posted in Facebook Los Lunas
Colorful Mural Inside the Data Center
Posted in Facebook Los Lunas Source: Facebook
Sentinel's Data Center at 3180 Players Lane in Memphis
Posted in Sentinel Memphis TN-1
Facebook Logo in Front of the Forest City Data Center
Posted in Facebook Forest City Source: Facebook
With portable stations, diagnostic functions easily can be performed throughout the data center.
Diagnostic Station
Posted in Facebook Forest City

With portable stations, diagnostic functions easily can be performed throughout the data center.

Source: Facebook
Photo taken in July 2012
Aerial View of the 1st Data Center on the Forest City Campus
Posted in Facebook Forest City

Photo taken in July 2012

Source: Facebook
Data Hall Full of Open Compute Cabinets
Posted in Facebook Forest City Source: DPR
25,000 SqFt Air Handling Penthouse
Posted in Facebook Forest City Source: DPR
Edgeconnex Sits Next to an Electrical Substation
Posted in EdgeConneX Portland Source: Baxtel
Exterior of H5's Quincy Facility
Posted in H5 Quincy Source: H5
6th Floor Meet Me Room
Posted in Netrality Chicago: 717 S Wells Source: Netrality
Exterior from the Street
Posted in Netrality Chicago: 717 S Wells
Row of Cabinets on Slab
Posted in Netrality Chicago: 717 S Wells Source: Netrality
Empty Colo Cages Ready to be Filled
Posted in Netrality Chicago: 717 S Wells Source: Netrality
717 MMR Racks
Posted in Netrality Chicago: 717 S Wells Source: Netrality
Space inside Netrality interconnected colocation facility at 717 South Wells Chicago
Floor Ready for Data Center Rentovation
Posted in Netrality Chicago: 717 S Wells

Space inside Netrality interconnected colocation facility at 717 South Wells Chicago

Source: Netrality
Rendering of the Eagle Mountain UT Site
Posted in Facebook Eagle Mountain Utah Source: Facebook
Government officials and representatives of Facebook pose with shovels following the announcement that Facebook will build a data center in Eagle Mountain, Utah.  May 2018.
Officials at the UT DC Announcement
Posted in Facebook Eagle Mountain Utah

Government officials and representatives of Facebook pose with shovels following the announcement that Facebook will build a data center in Eagle Mountain, Utah. May 2018.

Source: Eagle Mountain
Jenny Odell, a Bay Area digital artist, was commissioned to jazz up the structure in Mayes County, Oklahoma as part of Google's Data Center Mural Project.

Odell created four circular collages us...
Four Circular Murals are on the Side of Google's Mayes County Data Center
Posted in Google Mayes County Oklahoma

Jenny Odell, a Bay Area digital artist, was commissioned to jazz up the structure in Mayes County, Oklahoma as part of Google's Data Center Mural Project.

Odell created four circular collages using Using imagery collected from Google Maps. Each of the circles focus on different types of infrastructure found in the modern world. For example, swimming pools, circular farms, waste and salt ponds, and wastewater treatment plants.

Mayes Data Center Murals Up Close
Posted in Google Mayes County Oklahoma Source: Google
Initial Google Facility in Mayes County
Posted in Google Mayes County Oklahoma Source: Blake Gowriluk, 2015
Countless Rows of Racks and Servers at Google's Oklahoma Data Center
Posted in Google Mayes County Oklahoma Source: Google
Beautiful Sunset over Google's Mayes Campus
Posted in Google Mayes County Oklahoma Source: Google
Google has an Array of Antennas to Receive Signals for Google Fiber's TV Service
Posted in Google Council Bluffs near Lake Manawa Source: Google
A Group of Deer Graze on Grass Next to Google's Iowa Data Center
Posted in Google Council Bluffs near Lake Manawa Source: Google
Rear of the CenturyLink Data Center
Posted in Level3 Houston (5959 Corporate)
Wildflowers Thrive Next to the Council Bluffs Data Center
Posted in Google Council Bluffs Southlands Source: Google
This facility is four stories
Google is now Building Multi-Story Data Centers
Posted in Google Council Bluffs Southlands

This facility is four stories

Source: Google
1201 Main Street Dallas
Posted in Level3 Dallas (1201 Main)
Contegix's name is on the building
Outside
Posted in Contegix St Louis

Contegix's name is on the building

CARI.net Data Center
Posted in CariNet
An Historic view of Denver's 910 15th
Posted in Denver Gas & Electric Building (910 15th) Source: Denver Public Library
Outside of "The Vault"
Posted in QTS Moran (The Vault) Source: QTS
Drone photo of the Ashburn-Moran facility
Posted in QTS Moran (The Vault) Source: QTS
Row of Cabinets at Quadranet Atlanta
Posted in QuadraNet Atlanta Source: Quadranet
IRM BOS-1 Data Center
Posted in Iron Mountain Boston Source: IRM
Canyon Park Business Center
Posted in Microsoft Canyon Park
Satellite View
Posted in Microsoft Canyon Park Source: Google Maps
Entrance to 2805 Lafayette Street in Santa Clara
Posted in 2805 Lafayette Street: Digital Realty Source: DRT
1st Building on the Campus
Posted in Vantage Quincy Source: Vantage
Rendering of Campus When Fully Built Out
Posted in Vantage Quincy
AWS Facility IAD-74
Posted in Amazon IAD-74
Rendering of Phase 1 of HODL Ranch
Posted in Skybox HODL Ranch Source: Skybox
Phase 2 & 3 with the on-site substations
Diagram showing the HODL Ranch Campus
Posted in Skybox HODL Ranch

Phase 2 & 3 with the on-site substations

Source: Skybox
Cold Aisle Row
Posted in Microsoft Cheyenne Source: Microsoft
Microsoft's Campus in Cheyenne
Posted in Microsoft Cheyenne Source: Microsoft
CoreSite NY2 at 2 Emerson Lane
Posted in CoreSite Secaucus NY2 Source: CoreSite
NY2 Cooling Infrastructure
Posted in CoreSite Secaucus NY2 Source: CoreSite
The double-stacked Caterpillar generators tower above the equipment yard. The 2.5 megawatt units are raised 8 feet above the yard to ensure clearance far above the 500-year flood stage. They are fe...
NY2 Double-Stacked Generators
Posted in CoreSite Secaucus NY2

The double-stacked Caterpillar generators tower above the equipment yard. The 2.5 megawatt units are raised 8 feet above the yard to ensure clearance far above the 500-year flood stage. They are fed by an 8,500 gallon underground fuel storage tank

Source: CoreSite
The cooling plant features evaporative condensing units and can useair- and water-side economization with variable speed CRAHs. CoreSite is able to use economization for about two-thirds of the yea...
Modular Chiller Plant Generators
Posted in CoreSite Secaucus NY2

The cooling plant features evaporative condensing units and can useair- and water-side economization with variable speed CRAHs. CoreSite is able to use economization for about two-thirds of the year at NY2.

Source: CoreSite
The V2 facility on the SC1 Campus
Posted in Vantage Santa Clara SC1 Source: Vantage
Cooling infrastructure on the roof of the Vantage Data Centers V2 facility in Santa Clara
Cooling Infrastructure on the Roof of the V2 facility
Posted in Vantage Santa Clara SC1

Cooling infrastructure on the roof of the Vantage Data Centers V2 facility in Santa Clara

Source: Vantage Data Centers
Customer Colocation Area
Posted in Vantage Santa Clara SC1 Source: Vantage
Vantage V5 Data Center
Posted in Vantage Santa Clara SC1
Rendering of V6
Posted in Vantage Santa Clara SC1 Source: Vantage
Aerial View of Vantage's First Campus in Santa Clara
Posted in Vantage Santa Clara SC1
Attendees play shuffleboard during the grand opening party for the V6 building on the Vantage Santa Clara Campus
Playing Shuffleboard in the Data Center
Posted in Vantage Santa Clara SC1

Attendees play shuffleboard during the grand opening party for the V6 building on the Vantage Santa Clara Campus

Source: Vantage
Facebook is in the process of building a massive data center in Sarpy County south of Papillion.
Rendering of the FB Nebraska Campus
Posted in Facebook Papillion Nebraska

Facebook is in the process of building a massive data center in Sarpy County south of Papillion.

Rendering of the First Two Phases of FB's Papillion Data Center Campus
Posted in Facebook Papillion Nebraska Source: Facebook
Norwalk Generators
Posted in CyrusOne Norwalk Source: CONE
Outside of 6 Norden Place in Norwalk
Posted in CyrusOne Norwalk Source: CONE
Bird's Eye View of Flexential's Data Center in Raleigh
Posted in Flexential Raleigh Source: Google Maps
Rendering of proposed HostDime Data Center and Office
Posted in HostDime Eatonville Source: HostDime
Drone Shot of New Continuum Chicago Facility
Posted in New Continuum: 603 Discovery
Crypto Miner Deployment inside of 603 Discovery Data Center
Posted in New Continuum: 603 Discovery Source: New Continuum
High Density Room inside New Continuum Site
Posted in New Continuum: 603 Discovery Source: New Continuum
The highlighted area is the former AK Steel Corp, a site now owned by Port KC where Google is considering building a data center
Posted in Google Kansas City (Proposed)
Exterior View
Posted in H5 Denver Source: H5 Data Centers
Lobby with Conference Room in the Background
Posted in H5 Denver Source: H5 Data Centers
Break Room
Posted in H5 Denver Source: H5
The second AEP facility under construction in Groveport OH
Posted in Compass Groveport AEP II
Satellite View of the IBM Facility in Columbus
Posted in IBM Columbus Source: Google Maps
Conference Room at H5 Cleveland
Posted in H5 Cleveland Technology Center (CTC) Source: H5
Lobby with a view of the conference room
Lobby Area
Posted in H5 Cleveland Technology Center (CTC)

Lobby with a view of the conference room

Source: H5
Entrance to 1625 Rockwell
Posted in H5 Cleveland Technology Center (CTC) Source: H5
Red Power Room in SUPERNAP 8
Posted in Switch Las Vegas 8 Source: Switch
LV8 and LV9
Posted in Switch Las Vegas 8 Source: Switch
The “Black Iron Forest” is a framework of extra-thick steel that supports Switch’s containment systems, but also serves as a thermal storage system, retaining temperature to help keep the room cool...
Black Iron Forest
Posted in Switch Las Vegas 8

The “Black Iron Forest” is a framework of extra-thick steel that supports Switch’s containment systems, but also serves as a thermal storage system, retaining temperature to help keep the room cool in the event of a power outage.

The AMEX Data Center in eastern Guilford County
Posted in American Express IPC2 Whitsett NC Source: Jerry Wolford
Gate and Entrance to Flexential Facility at 3935 NE Aloclek
Posted in Flexential Hillsboro 1
Switch's planned layout for the Reno data center campus
Posted in Switch Reno Campus (The Citadel) Source: Switch
The Gate Entrance to Centeris's Site in Boise
Posted in Centeris Boise Source: Street View
Security Desk
Posted in Centeris Boise
Centeris Colocation Room
Posted in Centeris Boise
Exterior of Seattle Times Building
Posted in H5 Seattle
The Seattle Times Building
Posted in H5 Seattle
Beautiful Row of Cabinets
Posted in H5 Seattle Source: H5
Conference Room at H5 Seattle
Posted in H5 Seattle Source: H5
Cleveland Clinic Data Center in Brecksville, OH
Posted in Cleveland Clinic Brecksville
Exterior View at Twilight
Posted in Cleveland Clinic Brecksville
Battery Room
Posted in Cleveland Clinic Brecksville Source: Pease Photography
Data Center Floor (and Ceiling)
Posted in Cleveland Clinic Brecksville Source: Pease Photography
CCF Lobby
Posted in Cleveland Clinic Brecksville Source: Gilbane
Data Center Floor
Posted in Cleveland Clinic Brecksville Source: Gilbane
Byrant Building in KC
Posted in 1102 Grand St (Netrality) Kansas City Carrier Hotel Source: Wikimedia.org, User:Charvex
Lobby Entrance to 1102 Grand Hub
Posted in 1102 Grand St (Netrality) Kansas City Carrier Hotel Source: Netrality
Colo area with slab floors
Colocation Room
Posted in 1102 Grand St (Netrality) Kansas City Carrier Hotel

Colo area with slab floors

Source: Netrality
Shows the location of the Netrality Properties operated Meet-Me Room on the 6th floor as well as the generator rooms
3D Building Visualization of 1102 Grand
Posted in 1102 Grand St (Netrality) Kansas City Carrier Hotel

Shows the location of the Netrality Properties operated Meet-Me Room on the 6th floor as well as the generator rooms

Dramatic photo of the Time Warner Cable Facility in Charlotte
Posted in Spectrum Charlotte National Data Center Source: Little
There are 219,000 linear feet of conduit installed in the facility
Posted in Spectrum Charlotte National Data Center
2020 5th is Next to the Westin Building
Posted in Clise: 2020 Fifth Source: Clise Properties
Aerial View of 2020 5th with Westin in the background
Posted in Clise: 2020 Fifth Source: Clise Properties
Roof of 2020
Posted in Clise: 2020 Fifth Source: Clise Properties
Electrical Room
Posted in Clise: 2020 Fifth Source: Clise Properties
Rendering of TierPoint NSH Facility
Posted in Tierpoint Nashville NSH
Note the electrical infrastructure just North of the facility
Satellite View showing the Eddy Lane data center.
Posted in Tierpoint Nashville NSH

Note the electrical infrastructure just North of the facility

Source: Google Maps
Note, the door is ajar!
Lobby Entrance
Posted in Flexential Cool Springs

Note, the door is ajar!

The site was previously built and operated by Infomart before rebranding to STACK in January 2019.
STACK Ashburn Site Layout
Posted in STACK Northern Virginia

The site was previously built and operated by Infomart before rebranding to STACK in January 2019.

Source: Stack Infra
Artist Rendering of Infomart Ashburn
Posted in STACK Northern Virginia Source: Infomart Data Centers
Infomart Ashburn Lobby
Posted in STACK Northern Virginia Source: Infomart Data Centers
A Flywheel-driven Rotary UPS Units
Posted in Cisco Allen
Cisco Uses a Solid Floor Design
Posted in Cisco Allen
TXDC2 Allen Site Plan
Posted in Cisco Allen
Groundbreaking for Apple's data center expansion in Reno.
Tim Cook Participates in the January 2018 Groundbreaking
Posted in Apple Reno

Groundbreaking for Apple's data center expansion in Reno.

The filters seem to go on forever.
Cooling Filtration Room
Posted in Apple Reno

The filters seem to go on forever.

Network Room at Apple's Reno Data Center
Posted in Apple Reno
Birds Eye of the Apple Campus in Reno
Posted in Apple Reno
Apple built a three of 100-acre solar arrays adjacent to the company's Maiden NC data center. Each solar field will produce 20-megawatts.
Apple Solar Farm for Maiden Data Center
Posted in Apple Maiden North Carolina

Apple built a three of 100-acre solar arrays adjacent to the company's Maiden NC data center. Each solar field will produce 20-megawatts.

Apple Maiden Campus Overview
Posted in Apple Maiden North Carolina Source: Hickoryrecord.com
In August 2017, Apple announced plans to build a 400,000-square-foot, state-of-the-art data center in Waukee, Iowa, to better serve North American users of iMessage, Siri, the App Store, and other ...
Apple Iowa Data Center Aerial View
Posted in Apple Waukee IA

In August 2017, Apple announced plans to build a 400,000-square-foot, state-of-the-art data center in Waukee, Iowa, to better serve North American users of iMessage, Siri, the App Store, and other Apple services. Like all Apple data centers, the new facility will run entirely on renewable energy from day one.

Source: https://www.apple.com/newsroom/2017/08/apples-next-us-data-center-will-be-built-in-iowa/
Facility Outside Des Moines Will Run on 100 Percent Renewable Energy
Apple Waukee Iowa-Front of the Building
Posted in Apple Waukee IA

Facility Outside Des Moines Will Run on 100 Percent Renewable Energy

Source: https://www.apple.com/newsroom/2017/08/apples-next-us-data-center-will-be-built-in-iowa/
Proposed Phased Expansion for TX1
Posted in RagingWire Dallas TX1
Data Floor From Above
Posted in RagingWire Dallas TX1 Source: RagingWire
Phase 1 of RagingWire's Dallas Data Center
Posted in RagingWire Dallas TX1 Source: RagingWire
Rendering of Phase I
Posted in RagingWire Dallas TX1 Source: RagingWire
FirstLight at 41 State Street in Albany
Posted in Firstlight Albany
Outside of 4 Industrial Pkwy in Brunswick, Maine
Posted in EnablesIT Source: Google Maps
Planned 5 Building Campus
Posted in Vantage Ashburn
Rendering of one of the Ashburn Vantage data centers
Posted in Vantage Ashburn
Photo taken in September 2018
First Ashburn Facility Under Construction
Posted in Vantage Ashburn

Photo taken in September 2018

Source: Vantage Data Centers
Outside of the Boston-Charleston Facility on 500 Rutherford Ave
Posted in Tierpoint Charleston
The Garland Building at 1200 W 7th was rebranded as West 7th Center
West 7th Center Building
Posted in The Garland Building (1200 West 7th) West 7 Center

The Garland Building at 1200 W 7th was rebranded as West 7th Center

Switchgear at the Garland Building
Posted in The Garland Building (1200 West 7th) West 7 Center Source: 1200 West Seventh Street
Entrance to Garland Center
Posted in The Garland Building (1200 West 7th) West 7 Center Source: Google Maps
A Row of Green Generators
Posted in The Garland Building (1200 West 7th) West 7 Center Source: 1200 West Seventh Street
Battery Room
Posted in The Garland Building (1200 West 7th) West 7 Center Source: 1200 West Seventh Street
Raised Floor Room Ready for a Customer Deployment(s)
Posted in The Garland Building (1200 West 7th) West 7 Center
NJE-1 from the Parking Lot
Posted in Iron Mountain New Jersey
Satellite View of Tierpoint's State Farm location
Posted in TierPoint Tulsa-State Farm Source: Google Maps
The Polaris Data Center in Wenatchee Under Construction
Posted in T-Mobile East Wenatchee Source: Fortis
Pipes Under the Data Center
Posted in T-Mobile East Wenatchee Source: Fortis
The Polaris Data Center During Construction
Posted in T-Mobile East Wenatchee Source: Fortis
The Polaris Data Center in Wenatchee Under Construction
Posted in T-Mobile East Wenatchee Source: Fortis
World Map Mosaic in the Lobby
Posted in 32 Avenue of the Americas
View of 32 AoA looking North
Posted in 32 Avenue of the Americas Source: Rudin
A shot straight down the middle of the lobby
Posted in 32 Avenue of the Americas Source: Steven Bornholtz
Ribbon Cutting at the Chattanooga Site
Posted in DC BLOX Chattanooga
Data Center Modules Inside the DCBlox site
Posted in DC BLOX Chattanooga Source: DC Blox
Satellite view of EdgeConnex at 1510 Prime West Parkway in Katy
Posted in EdgeConneX Houston Source: Google Maps
The data center was acquired in April 2016
Aurora I Facility
Posted in CyrusOne Chicago Aurora CME

The data center was acquired in April 2016

Source: CyrusOne
Rendering of Aurora II
Posted in CyrusOne Chicago Aurora CME Source: CyrusOne
The buildings and next to each other
CME Campus Layout
Posted in CyrusOne Chicago Aurora CME

The buildings and next to each other

Source: CyrusOne
Exterior View
Posted in 55 Marietta
18th Floor Layout
Posted in 55 Marietta
17th Floor Plan
Posted in 55 Marietta
6th Floor Layout
Posted in 55 Marietta
14th Floor Plan
Posted in 55 Marietta
21st Floor Plan
Posted in 55 Marietta
Potential floor plan
Build to Suit Option
Posted in 55 Marietta

Potential floor plan

Source: 55Marietta
Meet Me Room at RagingWire's CA3 facility in Sacramento.
CA3 Network Infrastructure
Posted in RagingWire Sacramento Campus CA1, CA2, CA3

Meet Me Room at RagingWire's CA3 facility in Sacramento.

Source: RagingWire
CA3 Skywalk Overlooking the Data Floor
Posted in RagingWire Sacramento Campus CA1, CA2, CA3 Source: RagingWire
CA3 Cooling Infrastructure
Posted in RagingWire Sacramento Campus CA1, CA2, CA3 Source: RagingWire
Exterior of VA3
Posted in RagingWire Sacramento Campus CA1, CA2, CA3 Source: RagingWire
A Technician Rides a Bike Down a Data Center Aisle
Posted in QTS Atlanta Suwanee Source: QTS
Front of Building and Parking Area
Posted in QTS Atlanta Suwanee
Cooling Infrastructure
Posted in QTS Atlanta Suwanee
Colocation Room at QTS Suwanee
Posted in QTS Atlanta Suwanee
Proposed Multi-Phase Layout
Posted in Globalinx Virginia Beach Source: Globallinx
Rendering of the New Data Center
Posted in Globalinx Virginia Beach Source: Five9s
Workers finishing up the final conduit tie ins on Corporate Landing Parkway Virginia Beach VA.  Globalinx will now have 3 diverse point of entry conduit systems coming into our Phase I Data Center ...
Trenching final conduits for subsea cable connection
Posted in Globalinx Virginia Beach

Workers finishing up the final conduit tie ins on Corporate Landing Parkway Virginia Beach VA. Globalinx will now have 3 diverse point of entry conduit systems coming into our Phase I Data Center that will be tied into MAREA AND BRUSA subsea cables.

Source: Globalinx Twitter
Tierpoint facility on 10801 N. Amity Ave
Posted in TierPoint Kansas City
Satellite View of KCM data center
Posted in TierPoint Kansas City Source: Google Maps
Outside of the Racksquared Facility
Posted in Racksquared 325 E Spring St
Looking Down at Long Hallway at H5's Phoenix Facility
Posted in H5 Phoenix
Lobby
Posted in H5 Phoenix Source: H5
H5 Phoenix at Sunset
Posted in H5 Phoenix Source: H5 Data Centers
Long Hallway between Colocation Rooms
Posted in H5 Phoenix Source: H5 Data Centers
Proposed Property for Google's Midlothian Texas Data Center
Posted in Google Midlothian TX Source: Midlothian City Council Documents
Google held a launch  event in June 2019.
One of the last beams for the new Google data center
Posted in Google Midlothian TX

Google held a launch event in June 2019.

Google sign in front of just completed data center in June 2019
Posted in Google Midlothian TX
Midlothian mayor Richard Reno and U.S. Representative Eddie Bernice Johnson sign a steel bar during an announcement of Google's new data center in Midlothian on June 14, 2019
Posted in Google Midlothian TX
Photo taken in June 2019
Google Midlothian
Posted in Google Midlothian TX

Photo taken in June 2019

Source: Quincy Preston
Lobby and Entrance
Posted in Internap Dallas: 1221 Coit Source: POH Architects
INAP's Dallas Network
Posted in Internap Dallas: 1221 Coit Source: Internap
Colocation cages at INAP's Plano facility
Posted in Internap Dallas: 1221 Coit
The site was previously built and operated by Infomart before rebranding to STACK in Jan 2019.
Site Layout for STACK Silicon Valley
Posted in STACK Silicon Valley

The site was previously built and operated by Infomart before rebranding to STACK in Jan 2019.

Source: Stack Infra
Infrastructure Yard at the Infomart San Jose Site
Posted in STACK Silicon Valley Source: Infomart Data Centers
Chilled Water Pipes
Posted in STACK Silicon Valley Source: Fortune Data Centers
Utility Room
Posted in STACK Silicon Valley Source: Fortune Data Centers
Outside of 4005 S Mendenhall Road
Posted in EdgeConneX Memphis
Rackspace DFW3 at 1215 Integrity Drive
Posted in Rackspace Richardson DFW3
Satellite View of 23050 NE 102 St in Redmond
Posted in Microsoft Redmond Ridge
Row of Server Cabinets at "Redmond Ridge 1"
Posted in Microsoft Redmond Ridge
Another Row of Cabinets
Posted in Microsoft Redmond Ridge Source: Foursquare
Cabinets Inside a vXchnge Pod
Posted in vXchnge Philadelphia Source: vXchnge
A Colocation Room is Ready for Customers in vXchnge's 70k SqFt Facility
Posted in vXchnge Philadelphia
Data Holdings Facility
Posted in Data Holdings Milwaukee
Satellite View
Posted in vXchnge Pittsburgh Source: Google Maps
Ribbon Cutting at the Grand Opening event in June 2019
Posted in GIGA Charlotte (Mooresville) Source: Megan Suggs
The WindChill Module design uses fresh air to cool servers, cooling it using an adiabatic cooling system in which air passes through water flowing through evaporative cooling media. The design uses...
WindChill Module
Posted in GIGA Charlotte (Mooresville)

The WindChill Module design uses fresh air to cool servers, cooling it using an adiabatic cooling system in which air passes through water flowing through evaporative cooling media. The design uses negative air pressure to guide air through the servers and into a contained hot aisle, preventing the mixing of hot and cold air.

Source: GIGA
Two Shell Plaza at 777 Walker
Posted in Two Shell Plaza (777 Walker)
Entrance to SV3 at 1735 Lundy
Posted in Equinix San Jose SV3
Overhead view of Equinix SV3 shows good asian food next door
Posted in Equinix San Jose SV3 Source: Google Maps
Outside of 1275 K Street - DC's Carrier Hotel
Posted in CoreSite DC1 - 1275 K Street NW
Entrance to CoreSite's DC1
Posted in CoreSite DC1 - 1275 K Street NW Source: CoreSite
CoreSite's Market Post Tower (SV1)
Posted in CoreSite SV1 55 S Market
55 S. Market is an iconic 1980’s era building in the historic core of downtown San Jose.
Recently Remodeled Lobby of 55 S Market
Posted in CoreSite SV1 55 S Market

55 S. Market is an iconic 1980’s era building in the historic core of downtown San Jose.

Source: DCM
424-Acre Lot to the West of Dulles Airport
Posted in Digital Realty Dulles Source: CBRE
MWAA Aerial View of 424-Acre Parcel
Posted in Digital Realty Dulles Source: Metropolitan Washington Airports Authority
Equinix's Westmont Site (CH7)
Posted in Equinix Chicago CH7
Exterior View
Posted in Cascade Bend Source: Cascade Divide
Cascade's Master Plan for their Bend Data Center
Posted in Cascade Bend Source: Cascade Divide
One Summer Street Entrance
Posted in Markley: One Summer Street
Colocation Room Inside One Summer
Posted in Markley: One Summer Street Source: Gary Wong
Telxius Subsea Cable Network
Posted in Telxius Cable Landing Station Virginia Beach Source: Telxius
Building Floor and Landscape Plan
Posted in Telxius Cable Landing Station Virginia Beach
Colo Cabinet Area
Posted in CoreSpace Dallas Source: CoreSpace
With a Slab Floor Cold Air is Delivered From Above
Posted in CoreSpace Dallas
Exterior of CoreSpace at 7505 John W Carpenter Freeway
Posted in CoreSpace Dallas
Telecom Nerve Center
Posted in Westin Building Seattle
8th Floor Layout
Posted in Westin Building Seattle Source: westinbuilding.com
24th Floor Layout
Posted in Westin Building Seattle Source: westinbuilding.com
Lobby of the Westin
Posted in Westin Building Seattle Source: Clise Properties
Westin's Dual 500 KVA UPS Distribution System
Posted in Westin Building Seattle Source: WBX
The WBX Makes its Conference Room Available to Tenants Upon Request
Posted in Westin Building Seattle Source: WBX
Rendering of the 1st Building on the Campus
Posted in Compass Phoenix Source: Compass
The lot is on the corner of Yuma Road and Bullard Ave in Goodyear.
Plot of Land for Compass's Goodyear Facility
Posted in Compass Phoenix

The lot is on the corner of Yuma Road and Bullard Ave in Goodyear.

Source: Compass
Rendering of the campus
Posted in Compass Phoenix
Workers putting on insulation to the exterior of SV7
SV7 Under Construction
Posted in CoreSite Santa Clara Campus

Workers putting on insulation to the exterior of SV7

SV7 Near the End of Construction
Posted in CoreSite Santa Clara Campus Source: MATT Construction
CoreSite SV7 Completed
Posted in CoreSite Santa Clara Campus
CoreSite SV4 was completed in 2011
SV4 at 2972 Stender
Posted in CoreSite Santa Clara Campus

CoreSite SV4 was completed in 2011

CoreSite SV4 from the Air
Posted in CoreSite Santa Clara Campus
CoreSite SV7 from the Air
Posted in CoreSite Santa Clara Campus
New Chiller Enclosures at SV8
Posted in CoreSite Santa Clara Campus
CoreSite's SV8 building is starting to take shape. (January 2019)
SV8 Under Construction
Posted in CoreSite Santa Clara Campus

CoreSite's SV8 building is starting to take shape. (January 2019)

CoreSite's Santa Clara Campus
Posted in CoreSite Santa Clara Campus
Lombard Site Floor Plan
Posted in CyrusOne Chicago Lombard Source: CyrusOne
Front of the Facility
Posted in CyrusOne Chicago Lombard Source: CONE
Fisher Plaza with Space Needle in the Background
Posted in KOMO Plaza (was Fisher Plaza)
Antennae atop Komo Plaza
Posted in KOMO Plaza (was Fisher Plaza) Source: Komo Plaza
Rendering of CHI-1
Posted in Iron Mountain Chicago Source: Iron Mountain
427 S LaSalle: 1st Floor Layout
Posted in CoreSite Chicago CH1
427 S LaSalle: 5th Floor Layout
Posted in CoreSite Chicago CH1 Source: CoreSite
427 S LaSalle: 6th Floor Layout
Posted in CoreSite Chicago CH1 Source: CoreSite
Western Union Building with Chicago Board of Trade in the Background
Posted in CoreSite Chicago CH1
CH1 Entrance to "The Telegraph Building"
Posted in CoreSite Chicago CH1 Source: CoreSite
Aerial View of KC3 Facility
Posted in DataBank Kansas City KC3 Source: DataBank
The transport ring connects DataBank's three KC data centers as well as 1102 Grand, Kansas City's telecom hotel
DataBank has a Metro Optical Transport Ring in KC
Posted in DataBank Kansas City KC3

The transport ring connects DataBank's three KC data centers as well as 1102 Grand, Kansas City's telecom hotel

Source: DataBank
Conduits!
Posted in DataBank Kansas City KC3 Source: DataBank
Exterior of SFR's Facility in Moses Lake, WA
Posted in Server Farm Realty Titan (Moses Lake) Source: SFR
Exterior of 9500 Westover Hills Blvd in San Antonio
Posted in CyrusOne San Antonio II Source: CyrusOne
San Antonio II
Posted in CyrusOne San Antonio II Source: CyrusOne
Diagram of QTS's Site in Chicago
Posted in QTS Chicago Source: QTS
Exterior View of QTS's Chicago Building
Posted in QTS Chicago Source: QTS
Raw Space Ready for Build-out
Posted in QTS Chicago Source: Bisnow/Dees Stribling
Lobby Entrance
Posted in QTS Chicago
Phase 1 has 6 MW of power and 48,000 square feet of raised floor space
QTS Chicago Site Layout
Posted in QTS Chicago

Phase 1 has 6 MW of power and 48,000 square feet of raised floor space

Source: QTS
KyotoCooling System
Posted in QTS Chicago
Chicago SunTimes Building Before QTS's Acquisition
Posted in QTS Chicago
Kyoto Units Installed on the Roof
Posted in QTS Chicago Source: Mission Critical Magazine
Centrally located, well connected, and completely designed as a data center. This facility offers 20MW of data center critical load with a total electrical service to the building of 40 MW and auto...
Rendering of SFR's Downtown Chicago Facility
Posted in Server Farm Realty 840 South Canal

Centrally located, well connected, and completely designed as a data center. This facility offers 20MW of data center critical load with a total electrical service to the building of 40 MW and autonomous back-up power for 24-hours.

Source: SFR
Cabinet Colocation Area
Posted in CoreSite Los Angeles (LA2) 900 N Alameda Source: COR
Large Concrete Columns Throughout Building
Posted in CoreSite Los Angeles (LA2) 900 N Alameda
For the price of a cross-connect one can order an "extended cross connect" between CoreSite's LA data centers. This allows a customer to deploy in the more robust data center (LA2) while taking adv...
CoreSite Operated Fiber Paths between LA1 and LA2/LA3
Posted in CoreSite Los Angeles (LA2) 900 N Alameda

For the price of a cross-connect one can order an "extended cross connect" between CoreSite's LA data centers. This allows a customer to deploy in the more robust data center (LA2) while taking advantage of LA1's network density.

Flexential Compark site has over 2000 feet of high-security perimeter fence, two vertical pivot gates, several security barrier arms and a large 30 foot automated cantilever gate
Perimater Fence
Posted in Flexential Denver (Compark)

Flexential Compark site has over 2000 feet of high-security perimeter fence, two vertical pivot gates, several security barrier arms and a large 30 foot automated cantilever gate

With over 2000 feet of high security perimeter fence, two vertical pivot gates, several security barrier arms and a large 30 foot automated cantilever gate
Entrance Gate
Posted in Flexential Denver (Compark)

With over 2000 feet of high security perimeter fence, two vertical pivot gates, several security barrier arms and a large 30 foot automated cantilever gate

Front Entrance of Viawest's data canter in Englewood
Front Entrance
Posted in Flexential Denver (Compark)

Front Entrance of Viawest's data canter in Englewood

Viawest at 8636 S Peoria Street
Posted in Flexential Denver (Compark) Source: Flexential (ViaWest)
Fannin 3D Building Visualization
Posted in 1301 Fannin - Netrality Houston
Meet Me Room Floor Layout
Posted in 1301 Fannin - Netrality Houston Source: Netrality
1301 Security Desk and Entrance
Posted in 1301 Fannin - Netrality Houston
Aerial View of the South Hill Campus
Posted in Centeris South Hill Campus Source: Centeris
EQIX SV17 at 3030 Corvin Drive
Posted in Equinix Santa Clara SV17
Satellite view of the Digital Realty Trust's new building and its proximity to Equinix Ashburn, and Cologix's new site
DRT Acquired 21780 Filigree in May 2019
Posted in 21780 Filigree: Digital Realty

Satellite view of the Digital Realty Trust's new building and its proximity to Equinix Ashburn, and Cologix's new site

IBM Campus in Raleigh Durham
Posted in IBM Research Triangle Park Source: Google Maps
Outside of Edgeconnex Denver
Posted in EdgeConneX Denver
EQIX SV17 is in the background
EQIX SV15 at 2970 Corvin Drive
Posted in Equinix Santa Clara SV15

EQIX SV17 is in the background

Entrance to EQIX SV15
Posted in Equinix Santa Clara SV15
365 Main with the Old AboveNet Logo
Posted in 365 Main (SFR2) Digital Realty
The 360 Spear data center is also pictured next to the 365 Main data center. Both buildings are owned by Digital Realty Trust
365 Main with the Bay Bridge in the Background
Posted in 365 Main (SFR2) Digital Realty

The 360 Spear data center is also pictured next to the 365 Main data center. Both buildings are owned by Digital Realty Trust

Equinix DC11 at Night
Posted in Equinix Ashburn Campus Source: Equinix
Equinix DC6
Posted in Equinix Ashburn Campus Source: PARADIGM
DC6 Under Construction
Posted in Equinix Ashburn Campus Source: PARADIGM
DC6 Under Construction
Posted in Equinix Ashburn Campus Source: PARADIGM
Rendering of SV10
Posted in Equinix San Jose Campus SV1, SV5, & SV10 Source: Langan
Equinix SV10
Posted in Equinix San Jose Campus SV1, SV5, & SV10 Source: Paradigm Structural Engineers
SV10
Posted in Equinix San Jose Campus SV1, SV5, & SV10 Source: Paradigm Structural Engineers
Exterior View of SV5
Posted in Equinix San Jose Campus SV1, SV5, & SV10 Source: Equinix
Equinix doesn't charge for **everything.** Equinix offers complimentary cabinet and rack screws in the San Jose data center
Free Cabinet and Rack Screws
Posted in Equinix San Jose Campus SV1, SV5, & SV10

Equinix doesn't charge for everything. Equinix offers complimentary cabinet and rack screws in the San Jose data center

Source: Equinix
Arcade Play Area for Techs
Posted in Equinix San Jose Campus SV1, SV5, & SV10 Source: Equinix
Equinix SV10 represents the newest state-of-the-art Equinix International Business Exchange [IBX] center. This client's 183,000 gsf building consists of a two-story, steel framed building with prec...
Newly Constructed SV10
Posted in Equinix San Jose Campus SV1, SV5, & SV10

Equinix SV10 represents the newest state-of-the-art Equinix International Business Exchange [IBX] center. This client's 183,000 gsf building consists of a two-story, steel framed building with precast concrete, with 114,500 gsf of Data Hall space situated on two floors and supported by six emergency generators. The cooling system was through exterior IDEC units located in a 34,000 gsf, 2-level yard with the equipment situated both at grade and atop an elevated mechanical platform to provide direct air cooling into the Data Hall.

Source: Paradigm Structural Engineers
The Bloom Energy fuel cell test deployment was 1 Megawatt
Equinix First Tested Bloom Energy Fuel Cells at the San Jose Campus
Posted in Equinix San Jose Campus SV1, SV5, & SV10

The Bloom Energy fuel cell test deployment was 1 Megawatt

INAP's Site at 50 Innerbelt
Posted in Internap Boston BSN003
Internap's Boston Fiber Ring
Posted in Internap Boston BSN003 Source: INAP
A view of the power spine inside SuperNAP complex in Las Vegas, showing the large number of conduits housing power cabling.
Power spine
Posted in Switch Las Vegas CORE Campus

A view of the power spine inside SuperNAP complex in Las Vegas, showing the large number of conduits housing power cabling.

Source: Switch
The “Black Iron Forest” is a framework of extra-thick steel that supports Switch’s containment systems, but also serves as a thermal storage system, retaining temperature to help keep the room cool...
The "Black Iron Forest"
Posted in Switch Las Vegas CORE Campus

The “Black Iron Forest” is a framework of extra-thick steel that supports Switch’s containment systems, but also serves as a thermal storage system, retaining temperature to help keep the room cool in the event of a power outage.

Source: Switch
Rendering of Stream's Site in Phoenix
Posted in Stream Goodyear AZ Source: Stream
Stream's Elk Grove Facility
Posted in Stream Chicago I
Map of Nationwide Insurance Campus in Columbus
Posted in STACK New Albany
Stream's Data Center at Twilight
Posted in Stream Houston - Woodlands Source: Stream Data Centers
Site work began in February 2018, just five months after the project was announced, thanks to Henrico County’s fast permitting approval program and the development-ready site at White Oak Technolog...
The First Two Data Centers Take Shape
Posted in Facebook Henrico

Site work began in February 2018, just five months after the project was announced, thanks to Henrico County’s fast permitting approval program and the development-ready site at White Oak Technology Park.

Source: VEDP-Virginia Economic Development Partnership
In September 2018, Facebook announced an expansion from two buildings to five. This graphic shows the layout
Henrico Campus Expansion Layout
Posted in Facebook Henrico

In September 2018, Facebook announced an expansion from two buildings to five. This graphic shows the layout

Electrical Infrastructure
Posted in EdgeCore Mesa
Conference Room
Posted in EdgeCore Mesa
Large Data Hall ready for a customer deployment
Posted in EdgeCore Mesa
Rendering of the EdgeCore Phoenix facility
Posted in EdgeCore Mesa Source: EdgeCore
Rendering of A birds-eye view rendering of EdgeCore Internet Real Estate's planned full buildout of its Mesa campus
Posted in EdgeCore Mesa
Ryan Oro speaking at the EdgeCore Mesa Groundbreaking in March 2018
Posted in EdgeCore Mesa
Sundar Pichai overlooking plan during groundbreaking event
Posted in Google Clarksville TN Source: Google
Google CEO Sundar Pichai at the ground breaking event in Feb 2018
Posted in Google Clarksville TN
Aerial View of Google's Tennessee Data Center Under Construction
Posted in Google Clarksville TN Source: Aerial Innovations
Raised Floor Data Hall ready for customer deployments
Posted in Stream DFW VII Source: Stream
Lobby
Posted in Stream DFW VII Source: Stream
Outside of the new Stream VII facility in Garland
Posted in Stream DFW VII Source: Stream
Exterior of Cyxtera CMH1
Posted in Cyxtera Columbus CMH1
Cyxtera's Facility at 8180 Green Meadows Drive in Columbus
Posted in Cyxtera Columbus CMH1 Source: Google Maps
aerial view of the CyrusOne Sterling II Data Center Near Ashburn
Posted in CyrusOne Northern Virginia Sterling I, II, III Source: CyrusOne
Rendering of Aligned Energy in Dallas
Posted in Aligned Plano
Data Center Side of Building
Posted in 12121 Grant Street
Each floor has an office and Data Center sides
Posted in 12121 Grant Street
Data Foundry's 2nd Houston Data Center is in Greenspoint
Posted in Data Foundry Houston 2 Source: Data Foundry
Location of Building J on Campus
Posted in 44100 Digital Loudoun Plaza (Bldg J) Source: DRT
Outside of Building J
Posted in 44100 Digital Loudoun Plaza (Bldg J) Source: DRT
View of VA2 from the Entrance of VA1
Posted in CoreSite Reston Campus VA1 VA2
Conference Room in VA2
Posted in CoreSite Reston Campus VA1 VA2 Source: CoreSite
Lobby of VA2
Posted in CoreSite Reston Campus VA1 VA2 Source: CoreSite
Outside of Involta's Armstrong County Facility
Posted in Involta Pittsburgh Northpointe
Involta also owns more than 6,500 fiber route miles throughout Ohio.
Involta Fiber in Ohio
Posted in Involta Independence

Involta also owns more than 6,500 fiber route miles throughout Ohio.

Independence Ohio data center
Posted in Involta Independence
CoreSite VA3 Under Construction
Posted in CoreSite Reston VA3 Source: CoreSite
Scale Matrix facility at 5755 Kearny Villa Road
Posted in ScaleMatrix San Diego
An Aisle of ScaleMatrix's Custom Containment Cabinets
Posted in ScaleMatrix San Diego Source: ScaleMatrix
The Dynamic Density Control S1000 Cabinet Supports Loads upto 52 kW per cabinet
Posted in ScaleMatrix San Diego
Customer Lobby Area
Posted in TierPoint Jacksonville
Yellow = EdgeConnex's data center
Pink = Space for lease
Space Adjacent to Existing Data Center
Posted in EdgeConneX Norfolk

Yellow = EdgeConnex's data center
Pink = Space for lease

McQuay Cooling System
Posted in 905 King Street W Source: Beanfield
Generators on the Roof
Posted in 905 King Street W Source: Beanfield
Bring on the carriers
Meet Me Room Racks
Posted in 905 King Street W

Bring on the carriers

Loading Docks at 905
Posted in 905 King Street W
Rendering of the DP facility in Wise County
Posted in DP Facilities: Mineral Gap
The building is home to the CBC (and a data center)
250 Front Street West
Posted in 250 Front Street - Allied

The building is home to the CBC (and a data center)

The CBC Building with the Toronto Needle in the Background
Posted in 250 Front Street - Allied
Equinix TR2
Posted in Equinix Toronto TR2 Source: Equinix
Hallway in TR2
Posted in Equinix Toronto TR2 Source: Equinix
Parliament Street Data Centre
Posted in Equinix Toronto TR2 Source: Marcanadian, on Flickr
Exterior Skin Provides a Good Visual
Posted in Equinix Toronto TR2
Close Up of the Wall
Posted in Equinix Toronto TR2
The Gazette Printing Plant Before Acquisition
Posted in eStruxture Montréal MTL2
The Montreal Gazette's printing plant on St-Jacques St. when it was brand new in 2002. It was sold in 2017 to a data company.
Montreal Gazette Building
Posted in eStruxture Montréal MTL2

The Montreal Gazette's printing plant on St-Jacques St. when it was brand new in 2002. It was sold in 2017 to a data company.

Source: Phil Carpenter - Montreal Gazette
Entrance of MLT2
Posted in eStruxture Montréal MTL2 Source: eStruxture
QTS data center at 95 Christopher Columbus Drive
Posted in QTS Jersey City
Under Construction at 22271 Broderick Drive in Ashburn
Posted in QTS Ashburn 1 Source: QTS
Site Plan Diagram of QTS's Ashburn 1 Site
Posted in QTS Ashburn 1 Source: QTS
Aerial View of QTS's Ashburn Data Center
Posted in QTS Ashburn 1
Pre-Construction Rendering of the Facility at 22271 Broderick Drive
Posted in QTS Ashburn 1
QTS at 2805/2807 Mission College Blvd
Posted in QTS Santa Clara
Conference Room
Posted in QTS Santa Clara
Former Dupont Fabros Facility has Solar Array on the roof
Posted in QTS Piscataway
Floor Plan for Expedient Cleveland 152
Posted in Expedient Cleveland-NEO 152 Source: Expedient
Building Layout
Posted in Expedient Memphis Source: Expedient
Satellite View
Posted in Expedient Memphis Source: Google Maps
Customer Colocation Room
Posted in Expedient Memphis Source: Expedient
Entrance to the QTS Atlanta Metro Facility
Posted in QTS Atlanta Metro
Cooling Tower on the Roof
Posted in QTS Atlanta Metro Source: JE Dunn
Large Colocation Room
Posted in QTS Atlanta Metro Source: JE Dunn
In a gasketed plate and frame heat exchanger, the fluids run counter-currently through the heat exchanger. The hot liquid normally enters through one of the upper connections and leaves through the...
Gasketed Plate and Frame Heat Exchanger
Posted in QTS Atlanta Metro

In a gasketed plate and frame heat exchanger, the fluids run counter-currently through the heat exchanger. The hot liquid normally enters through one of the upper connections and leaves through the connection underneath. The cold liquid enters through one of the lower connections and leaves through the connection above.

As the fluids pass through the heat exchanger, heat is transferred from the hot media to the cold media.