The North America Data Center Map Has 2151 Sites

Search North America's Data Centers


North America Data Center List

56 Marietta Carrier Hotel - Digital Realty
56 Marietta Street NW
Atlanta, GA 30303
Located in Atlanta
  • 152,650 Gross SqFt
  • 10.0 Megawatts

56 Marietta is a Carrier Hotel and one of the most popular buildings in the Atlanta data center market.

Equinix Ashburn Campus
21715 Filligree Court
Ashburn, VA 20147
Located in Ashburn: Data Center Alley
  • 573,032 Gross SqFt
  • 37.0 Megawatts

Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.

RagingWire Ashburn VA3
21583 Megawatt Drive
Ashburn VA 20147
Located in Ashburn: Data Center Alley
  • 245,000 Gross SqFt
  • 16.0 Megawatts

RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.

Iron Mountain Northern Virginia (Manassas)
11650 Hayden Rd
Manassas, VA 20109
Located in Northern Virginia
  • 100,000 Gross SqFt
  • 10.5 Megawatts

Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.

  • VA-1, the first building on the campus, is a 165,000Sqft facility with 10.5 MW of power.
Digital Realty Loudoun Ashburn Campus
43881 Devin Shafron Drive
Ashburn, VA 20146
Located in Ashburn: Data Center Alley
  • 80.0 Megawatts
  • 1,700,000 Building SqFt

The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.


Largest Data Centers in North America

Gross SqFt Gross SqFt Power (MW) Power (MW)
Microsoft Cheyenne 200.00
Microsoft Chicago Northlake 707,244 198.00
OVH Beauharnois Quebec BHS 120.00
Facebook Altoona Iowa 117.00
QTS Ashburn Lockridge 105.00
{{ datacenter.site_name }} {{ datacenter.total_gross_sqft }} {{ datacenter.total_power_mw }}

Top North America Datacenter Markets by # of Sites

Loading...

Top North America Datacenter Markets by Power Capacity (MW)

Loading...


June 2019

CBRE North American Data Center Report (H1 2019)

Map produced by TAG, the Technology Association of Georgia.
Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
MAREA and BRUSA cables are now landing in Virginia Beach. The Virginia Beach landing port provides an alternative to NY and Flordia landing stations.

Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Posted in Atlanta

Map produced by TAG, the Technology Association of Georgia.

Boston Metro: Average Power Rates
Posted in Boston Source: JLL
Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Posted in Northern Virginia

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

MAREA and BRUSA cables are now landing in Virginia Beach. The Virginia Beach landing port provides an alternative to NY and Flordia landing stations.
Subsea Cables Landing in Virginia Beach
Posted in Virginia Beach

MAREA and BRUSA cables are now landing in Virginia Beach. The Virginia Beach landing port provides an alternative to NY and Flordia landing stations.

Source: Virginia Beach Economic DEvelopment Board
Map of Virginia Beach Data Centers and Corporate Landing Business Park
Posted in Virginia Beach Source: City of Virginia Beach
Maine Fiber Company paths (Acquired by FiberLight)
Posted in Maine Source: MFC, Inc
Large Content Company Data Centers in Rural Oregon
Posted in Oregon Source: Dan Aguayo - The Oregonian
427 S LaSalle: 1st Floor Layout
Posted in CoreSite Chicago CH1
427 S LaSalle: 5th Floor Layout
Posted in CoreSite Chicago CH1 Source: CoreSite
427 S LaSalle: 6th Floor Layout
Posted in CoreSite Chicago CH1 Source: CoreSite
Western Union Building with Chicago Board of Trade in the Background
Posted in CoreSite Chicago CH1
CH1 Entrance to "The Telegraph Building"
Posted in CoreSite Chicago CH1 Source: CoreSite
Dartmouth Regional Technology Center
Posted in FirstLight Lebanon Source: Google Maps
FirstLight Lebanon
Posted in FirstLight Lebanon Source: FirstLight Fiber
QTS Sacramento at 1100 N Market Blvd
Posted in QTS Sacramento Source: QTS
Rendering of DataBanks New ATL1 Site
Posted in DataBank Atlanta ATL1 Source: DataBank
310 Marlboro St in Keene
Posted in FirstLight Keene
Map shows the 259 acre lot Microsoft acquired in 2018
Posted in Microsoft PHX10
PHX-10 and PHX-11 layout
Posted in Microsoft PHX10 Source: Joshua Bowling/The Republic
Microsoft's Goodyear Airport project plan
Posted in Microsoft PHX10 Source: Joshua Bowling/The Republic
Yellow area shows the 147 acre lot acquired in 2019
Posted in Microsoft Goodyear
6th Floor Meet Me Room
Posted in Netrality Chicago: 717 S Wells Source: Netrality
Exterior from the Street
Posted in Netrality Chicago: 717 S Wells
Row of Cabinets on Slab
Posted in Netrality Chicago: 717 S Wells Source: Netrality
Empty Colo Cages Ready to be Filled
Posted in Netrality Chicago: 717 S Wells Source: Netrality