LightEdge: San Diego (SDTC)
The site was previously known as " AIS West San Diego (SDTC)", before it was acquired by NFINIT, in 2020 and then in 2022 LightEdge acquired NFINIT.
Founded in 1996, LightEdge is a enterprise-grade cloud service provider, colocation and consulting company.
LightEdge is ISO 20000-1, SSAE 16 SOC 1 and SSAE 16 SOC 2 certified with Data Center operations meeting the stringent PCI-DSS and HIPAA compliance requirements.
LightEdge is privately held with the Anschutz Corporation being the largest investor.
The site was previously known as " AIS West San Diego (SDTC)", before it was acquired by NFINIT, in 2020 and then in 2022 LightEdge acquired NFINIT.
The site was previously known as AIS Lightwave (LWDC), before it was acquired by NFINIT, in 2020 and then in 2022 LightEdge acquired NFINIT.
LightEdge’s "Amsterdam Data Center" is essentially a white-label or resold solution physically located within an Equinix facility.
LightEdge acts as a colocation and hybrid cloud provider operating within Equinix’s Silicon Valley campus.
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
Located 125 feet underground within a three-million-square-foot limestone formation, the Lenexa facility was added to the LightEdge portfolio following the acquisition of Cavern Technologies in September 2021.
The LightEdge St. Louis data center was added to LightEdge's portfolio through the acquisition of Connectria, which was finalized in April, 2024.
The underground, solid limestone structure is 6X stronger than concrete, and allows for contiguous expansion in the form of private rack/cage space and hard wall suite environments.
The site was formerly operated by OnRamp before being acquired in July 2018.
LightEdge leases a suite in CyrusOne's Lewisville DFW2 data center north of Dallas.
November 18, 2026 Dallas
Giga Energy has signed a 10-year lease worth about $1 billion at its Project Clay data center in Hunt County, Texas. The agreement, announced on November 17, covers 60MW of capacity for an undisclosed U.S.-based AI cloud provider. Giga Energy develops, owns, and operates the campus, Reuters...
Read more
November 18, 2026 Ashburn: Data Center Alley
Loudoun County supervisors adopted a resolution on Nov. 17 to halt board action on data center and substation applications for up to 12 months. The vote was 7-1, with Supervisor Kristen Umstattd opposed and Supervisor Caleb Kershner abstaining, according to Loudoun Now. The pause runs from Sept....
Read more
November 16, 2026 Dallas
An affiliate of Equinix has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The application puts a four-story, 372,445-square-foot building at 1520 West Mockingbird Lane, in an industrial area near Love Field, as Data Center...
Read more
November 12, 2026 Kansas
Voters in Ottawa, Kansas, approved an initiative prohibiting data centers that draw more than 25 MW inside the city, the ballot measure record shows. Question 2 passed 2,882 to 1,129, or 71.85%, in the Nov. 3 general election, according to unofficial results reported by KWCH. Outlets describe the...
Read more
October 30, 2026 Austin
Sabey Data Centers has started a pilot using hydrotreated vegetable oil (HVO) as a diesel replacement in backup generators at its Austin campus. The company is testing the renewable fuel as the primary fuel source for those generators, according to Sabey's announcement. Sabey says the pilot...
Read more
October 26, 2026 San Francisco Bay Area
ZutaCore unveiled Two-Phase Matrix Flow Boiling, the cooling architecture inside its OmniTherm cold plate family, at OCP Global Summit 2026 on Oct. 13. The Foster City, California, company builds waterless, direct-to-chip two-phase liquid cooling for AI and high-performance computing servers. The...
Read more
Jan 05, 2026 Eric Bell Dallas