CyrusOne Inc, incorporated on July 31, 2012, is an owner, operator and developer of enterprise-class, carrier-neutral, multi-tenant datacenter properties. CyrusOne's data centers are purpose-built facilities.

The CyrusOne National IX Platform (the National IX Platform) delivers interconnection across states and between metro-enabled sites within the CyrusOne footprint and beyond. The platform enables data transfer and accessibility for customers by uniting all of the Company’s data centers. CyrusOne’s portfolio is located in several domestic and international markets. It has domestic properties in Chicago, Dallas, Houston, Phoenix, San Antonio and Cincinnati.

Company History:


July 2010: Cincinnati Bell acquires CyrusOne [r3]
Jan 2013: CyrusOne IPO [r2]
July 2014: Acquired Cervalis [r1]

References:


r1. Businesswire link July 1, 2015
r2. NASDAQ.com link Jan 18, 2013
r3. CyrusOne PR link

CyrusOne Logo
Headquarters:
1649 W Frankford Rd, Carrollton, TX 75007
Stock:
NASDAQ: CONE
Revenue:
$672 million in 2017
Linkedin:
Services:
Retail Colocation (Cabinets, Cages, RU), Wholesale Data Center, Internet Exchange
Company Type:
Carrier-Neutral
Cross Connect:
No charge

CyrusOne News Add Post


CyrusOne Expands Santa Clara Campus While Still Under Construction
CyrusOne is expanding it's Santa Clara data center campus just months after announcing their f...
Read More
Virtus to spend £500m on five data centers across London
British colocation provider Virtus is planning to spend £500 million ($645m) on a network of five...
Read More
CyrusOne Enters Into Strategic Partnership to Develop Hyperscale Data Centers in The Netherlands
CyrusOne Inc announced an agreement with Agriport A7 for the development of hyperscale data cente...
Read More
Alibaba Cloud to launch London region
China’s favorite e-commerce giant Alibaba is planning the launch of a cloud region in London, two...
Read More

CyrusOne Data Center Map


CyrusOne Locations


Show Sites
CyrusOne Quincy
1025 D St NW
Quincy, WA 98848
Located in Quincy

CyrusOne acquired this 45-acre plot of land in Quincy in 2016, but has yet to build anything on it, waiting until it closes a tenant for the site before Cyrus invests in construction.

The 45-acre campus can expand to a total of 930,000 square feet with 720,000 colocation square feet with up to 120,000 square feet for class A office space.

CyrusOne Northern Virginia Sterling V
21350 Pacific Blvd
Sterling, VA 20166
Located in Northern Virginia
CyrusOne Dublin Grange Castle
Grange Castle Business Park
Dublin, Ireland
Located in Dublin

Approved in October 2018, CyrusOne is planning to build the two-story data centre. At full capacity it will be 35,500 sqm and have 56 MW of critical power

CyrusOne Singapore
29A International Business Park
Jurong East, Singapore, 609934
Located in Singapore
  • 5,000 Gross SqFt
  • Does not own Owns the Building

CryusOne is located within Digital Realty's facility at 29A International Business Park

CyrusOne Middenmeer, Netherlands
Agriport A7
Middenmeer, Netherlands
Located in Amsterdam

Located next to Microsoft's data center.

CyrusOne Allen
2300 Chelsea Blvd
Allen, TX 75013
Located in Dallas

The project will have three phases. The first phase of CyrusOne's planned Allen data center would be 350,950 square feet. Two additional phases would add a 619,100 square foot and a 412,800 square-foot building.

CyrusOne Stamford
10 Riverbend Drive South
Stamford, CT 06907
Located in Connecticut
  • 57,000 Gross SqFt
  • 4.0 Megawatts
CyrusOne Austin II
7301 Metropolis Drive
Bldg #6 Austin, TX 78744
Located in Austin
  • 70,000 Gross SqFt
  • 9.0 Megawatts
  • Supports 250 wpsf with the ability to support over 1,000 wpsf
  • Raised Floor: 48"
CyrusOne Carrollton
1649 West Frankford Rd. Carrollton
TX 75007
Located in Dallas
  • 670,000 Gross SqFt
  • 60.0 Megawatts
  • 60,000 SqFt of Office Space
  • Power Density: 150–200+ watts/SqFt
CyrusOne Lewisville
2501 S. State Hwy 121
Lewisville, TX 75067
Located in Dallas
  • 200,000 Gross SqFt
  • 26.5 Megawatts
  • Two independent power grids
  • Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)

Photos


The data center is sandwiched between Tierpoint and Cisco Systems data centers
Energy Labs Hybrid Systems utilize a perimeter base frame constructed of Structural Steel to insure minimum deflection
Spartan decor, but functional
aerial view of the CyrusOne Sterling II Data Center Near Ashburn
Posted in CyrusOne Northern Virginia Sterling I, II, III Source: CyrusOne
Carrollton Facility at Twilight
Posted in CyrusOne Carrollton Source: CyrusOne
The data center is sandwiched between Tierpoint and Cisco Systems data centers
Location of New CONE Data Center in Allen
Posted in CyrusOne Allen

The data center is sandwiched between Tierpoint and Cisco Systems data centers

Construction Almost Complete in 2013
Posted in CyrusOne Chandler Phoenix Campus Source: Bergelectric
First Chandler Facility Under Construction in 2012
Posted in CyrusOne Chandler Phoenix Campus Source: Bergelectric
Data Hall
Posted in CyrusOne Chandler Phoenix Campus Source: CyrusOne
Energy Labs Hybrid Systems utilize a perimeter base frame constructed of Structural Steel to insure minimum deflection
Energy Labs HVAC Cooling System
Posted in CyrusOne Chandler Phoenix Campus

Energy Labs Hybrid Systems utilize a perimeter base frame constructed of Structural Steel to insure minimum deflection

Source: CyrusOne
The Architectural Beautiful Entrance to CyrusOne's Chandler Facility
Posted in CyrusOne Chandler Phoenix Campus Source: JE Dunn
Elegant Lobby
Posted in CyrusOne Chandler Phoenix Campus Source: JE Dunn
Drop Ceiling
Posted in CyrusOne Chandler Phoenix Campus Source: JE Dunn
Spartan decor, but functional
Lobby for Building #4
Posted in CyrusOne Chandler Phoenix Campus

Spartan decor, but functional

Building #4 Rooftop Mechanical
Posted in CyrusOne Chandler Phoenix Campus