Switch Adopts Nvidia Omniverse DSX Blueprint for EVO AI Data Center Design
March 16, 2026
Switch
This was previously operated by Data Foundry. Switch acquired Data Foundry in 2021, which included data centers in Austin.
| Distance | Site | About |
|---|---|---|
| 0.09 miles | 7401 E Ben White - Digital Realty |
7401 E. Ben White Blvd. is a three-building portfolio comprised of two single-story data centers and one single-story call center, which are located in southeast Austin.
|
| 0.09 miles | CyrusOne Austin I |
Also known as the Austin Met Center. CyrusOne has announced that this facility will close. Customers will be moved to other CyrusOne sites in Austin.
|
| 0.21 miles | Digital Realty: AUS11 |
The building has 75,000 gross square feet with a 30-foot clearance height capable of supporting two floors inside the building. The site has diverse underground electrical ductbanks from a nearby substations. The facility offers access to seven fiber optic providers in close proximity to the building
|
| 0.23 miles | 7620 Metro - Digital Realty |
The Digital facility is on 11.28 acres of land and features a 62,000-sq-ft building. The data center is full, with 100% of the space occupied with long-term lease tenants but there is additional land build another 135,000 sq ft facility.
|
| 0.68 miles | CyrusOne: Austin III |
CyrusOne's AUS3 data center is projected to be the company's largest facility in Austin, spanning 172,000 total square feet, which includes 120,000 square feet of colocation space (CSF) and over 25,000 square feet of Class A office space.
|
| 0.68 miles | CyrusOne Austin II |
Supports 250 wpsf with the ability to support over 1,000 wpsf
Raised Floor: 48"
|
| 0.70 miles | DataCanopy: Austin, TX |
Data Canopy's Austin, TX facility delivers exceptional connectivity and 100% power uptime within a state-of-the-art environment secured by industry-leading features.
|
| 0.99 miles | LightEdge Austin1 Montopolis |
OnRamp Staffs the site 24/7/365
Power Densities up to 30kW / Rack
Outside of 100 year and 500 Year Flood Plains
|
| 0.99 miles | Lumen Austin 4 | |
| 1.17 miles | LightEdge Austin2 Burleson |
The site was formerly operated by OnRamp before being acquired in July 2018.
|
| 1.36 miles | Switch: Smith School Rd |
Switch Inc. reportedly intends to build a 300,000-square-foot (27,870 sqm) data center alongside a new Austin Energy substation.
|
| 1.53 miles | Switch: Texas 2 |
2nd building on the former Data Foundry Campus
|
| 1.55 miles | Switch: Texas 1 |
Built in 2011, Texas 1 resides on the Data Ranch. The 40-acre campus has plenty of expansion capability. The campus can grow to over 1 million sqft and 100 MW of power.
The first phase of Data Foundry's Texas 2 site was opened in 2018.
|
| 1.64 miles | Lumen Austin 1 (4207 Smith School) | |
| 3.03 miles | Verizon: 2100 HWY 35 |
Former XO Communications site
|
| 3.49 miles | LOGIX Austin (1905 E 6th) |
Acquired by LOGIX, the Alpheus site is east of Austin's central business district. Located on East 6th Street, it features a multiple carrier Internet backbone, dual backup power supplies
|
| 3.56 miles | Lumen Austin 3 (500 Chicon) |
|
| 4.06 miles | Crypto Mining Data Center Request Dataset |
In 2024, Core Scientific acquired this facility in Austin, Texas. The site was formerly used to house Hewlett Packard's hosting business, including high-performance computing.
|
| 4.12 miles | Hyperscale Data Center Request Dataset |
CoreWeave has secured an 8-year lease agreement with Core Scientific for a 118,000 square feet of compute space at 3301 Hibbetts Road in Austin, Texas.
|
| 4.77 miles | DPO: Texas |
Digital Power Optimization partners with Schneider for data centers at Texas wind farms.
|
| 5.07 miles | Tesla: Austin Dojo |
Data center is reportedly on the South Side of the massive Tesla Gigafactory.
|
| 5.61 miles | University of Texas: Austin |
The Texas Advanced Computing Center (TACC) on the Austin campus hosts a 26,000 sq ft Tier III data center.
|
| 5.81 miles | American Tower: Austin |
In 2020, Communications infrastructure company American Tower launched its Edge data center in Austin, Texas.
|
| 8.79 miles | Element Critical Austin |
In 2021, Element Critical acquired the building from vXchnge.
|
| 9.39 miles | EdgeConneX: Austin AUS01 |
Located in the tech-forward Cedar Creek area of Bastrop County, EdgeConneX AUS01 is the high-performance anchor of a massive new data center campus.
|
| 9.71 miles | EdgeConneX: AUS03 |
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
|
| 9.83 miles | EdgeConneX: AUS02 |
The upcoming AUS02 facility is designed as a massive two-story structure, set to encompass 578,000 square feet (approximately 54,000 square meters) of high-density data center space.
|
| 9.93 miles | EdgeConneX: AUS04 |
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
|
| 12.96 miles | Verizon: 11501 Domain |
Formerly an XO site
|
| 15.79 miles | DataBank Austin AUS1 |
|
| 18.58 miles | Hyperscale Data Center Request Dataset |
Amazon operates a data center in the Round Rock area of Austin, Texas.
|
| 18.80 miles | Switch: Round Rock East Campus |
Switch is constructing a new data center facility in Rock Round, Texas, located outside of Austin. The site spans 32.48 acres and is situated north of Louis Henna Boulevard and east of Greenlawn Boulevard in the Rock Round area.
|
| 18.86 miles | Switch Austin "The Rock" |
First announced in 2021, Switch's 'The Rock' data center in Texas will span 1.5 million square feet (140,000 sqm), and was first approved by the local council in July 2021. The campus is on land adjacent to a number of Dell-owned facilities in Round Rock, Texas.
|
| 18.92 miles | Skybox: Austin 2 |
Skybox and Prologis have developed a state-of-the-art data center at 2515 South Kenney Fort Boulevard in Pflugerville, representing a $548 million investment.
|
| 18.95 miles | Switch: 300 Dell Way |
Switch is building another data center in Round Rock on a plot east of South Mays Street and north of Dell Way. The data center will span 173,895 square feet of gross floor area.
|
| 18.96 miles | Skybox Austin |
|
| 19.04 miles | Sabey Austin |
Sabey Austin is Sabey Data Centers' new purpose-built data center campus located at 1300 Louis Henna Blvd. The two-building campus, when complete, will offer 430,000 square feet of reliable colocation.
|
| 19.18 miles | Sabey: Austin 1B |
Sabey Data Centers has begun construction on the second building at its Austin, Texas campus.
|
Switch, the technology infrastructure corporation headquartered in Las Vegas, Nevada is built on the intelligent and sustainable growth of the internet. Switch founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company’s world-renowned data centers.
Switch has PRIME campuses located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia.
March 16, 2026
Switch
February 13, 2025
Austin
April 29, 2024
Austin
September 01, 2023
Switch
February 03, 2023
Austin
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas