|
0.13 miles
|
Prime: AUS01-05
|
The facility is a part of Prime's Austin Data Center Campus in Texas.
|
|
0.17 miles
|
Prime: AUS01-08
|
The facility is a part of Prime's Austin Data Center Campus in Texas.
|
|
0.20 miles
|
Prime: AUS01-06
|
The facility is a part of Prime's Austin Data Center Campus in Texas.
|
|
0.26 miles
|
Prime: AUS01-03
|
The facility is a part of Prime's Austin Data Center Campus in Texas.
|
|
0.27 miles
|
Prime: AUS01-04
|
The facility is a part of Prime's Austin Data Center Campus in Texas.
|
|
0.36 miles
|
Prime: AUS01-02
|
The facility is a part of Prime's Austin Data Center Campus in Texas.
|
|
0.38 miles
|
Prime: Austin Campus
|
Prime Data Centers is developing a new data center campus in Caldwell County, located outside of Austin, Texas.
|
|
1.54 miles
|
PowerHouse: Austin
|
PowerHouse Data Centers is planning a large-scale data center campus within the Caldwell Valley Technology Park near Uhland, Texas, expanding its presence in one of the fastest-growing digital infrastructure corridors between Austin and San Antonio.
|
|
1.54 miles
|
Tract: Caldwell Valley
|
Tract plans to develop a data center park in Uhland, Texas, a city spanning Caldwell and Hays counties approximately 30 miles south of Austin.
|
|
5.45 miles
|
Edged Energy: Austin Bldg2
|
This facility is part of Edged Energy's data center campus in Maxwell, within Caldwell County outside Austin, Texas.
|
|
6.50 miles
|
Edged Energy: Austin Campus
|
Edged Energy is developing a massive, state-of-the-art data center campus outside Austin, Texas, designed to handle the intense power and infrastructure demands of modern artificial intelligence.
|
|
15.80 miles
|
Valley AlphaInterested in this information?Contact us
|
Amazon Data Services has further expanded its Texas footprint by acquiring 1,300 acres of land near Cedar Creek in Bastrop County, located roughly 30 miles southeast of Austin.
|
|
15.87 miles
|
Sabey: San Macros, TX
|
Sabey, a US data center firm, plans to develop a new campus on 786 acres in San Marcos, Texas.
|
|
16.52 miles
|
CloudBurst: San Marcos 12
|
This facility is part of CloudBurst's San Marcos Campus in Texas.
|
|
16.57 miles
|
CloudBurst: San Marcos 11
|
This facility is part of CloudBurst's San Marcos Campus in Texas.
|
|
16.64 miles
|
CloudBurst: San Marcos 10
|
This facility is part of CloudBurst's San Marcos Campus in Texas.
|
|
16.69 miles
|
CloudBurst: San Marcos 9
|
This facility is part of CloudBurst's San Marcos Campus in Texas.
|
|
16.75 miles
|
CloudBurst: San Marcos 8
|
This facility is part of CloudBurst's San Marcos Campus in Texas.
|
|
16.81 miles
|
CloudBurst: San Marcos 7
|
This facility is part of CloudBurst's San Marcos Campus in Texas.
|
|
17.37 miles
|
Highlander SM One: San Marcos, TX
|
Highlander SM One LLC, represented by Armbrust & Brown PLLC, is seeking to rezone the land from Conservation Cluster to Light Industrial and annex 53.57 acres of the property.
|
|
17.40 miles
|
CloudBurst: San Marcos 6
|
This facility is part of CloudBurst's San Marcos Campus in Texas.
|
|
17.48 miles
|
CloudBurst: San Marcos 5
|
This facility is part of CloudBurst's San Marcos Campus in Texas.
|
|
17.56 miles
|
CloudBurst: San Marcos 4
|
This facility is part of CloudBurst's San Marcos Campus in Texas.
|
|
17.63 miles
|
CloudBurst: San Marcos 3
|
This facility is part of CloudBurst's San Marcos Campus in Texas.
|
|
17.69 miles
|
CloudBurst: San Marcos 2
|
This facility is part of CloudBurst's San Marcos Campus in Texas.
|
|
17.77 miles
|
CloudBurst: San Marcos Campus
|
CloudBurst, a new US data center developer focused on artificial intelligence (AI), is building a natural gas-powered facility in Texas.
|
|
18.90 miles
|
EdgeConneX: Austin AUS01
|
Located in the tech-forward Cedar Creek area of Bastrop County, EdgeConneX AUS01 is the high-performance anchor of a massive new data center campus.
|
|
18.95 miles
|
EdgeConneX: AUS02
|
The upcoming AUS02 facility is designed as a massive two-story structure, set to encompass 578,000 square feet (approximately 54,000 square meters) of high-density data center space.
|
|
19.18 miles
|
EdgeConneX: Austin AUS11
|
EdgeConneX is developing two new 730,000 sq ft data centers, EDCAUS11 and EDCAUS12, in Bastrop County, Texas.
|
|
19.21 miles
|
EdgeConneX: AUS03
|
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
|
|
19.23 miles
|
EdgeConneX: Austin AUS12
|
EdgeConneX is developing two new 730,000 sq ft data centers, EDCAUS11 and EDCAUS12, in Bastrop County, Texas.
|
|
19.27 miles
|
Lumen Austin 1 (4207 Smith School)
|
|
|
19.28 miles
|
EdgeConneX: AUS04
|
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
|
|
19.45 miles
|
Switch: Texas 1
|
Built in 2011, Texas 1 resides on the Data Ranch. The 40-acre campus has plenty of expansion capability. The campus can grow to over 1 million sqft and 100 MW of power.
The first phase of Data Foundry's Texas 2 site was opened in 2018.
|
|
19.46 miles
|
Switch: Texas 2
|
2nd building on the former Data Foundry Campus
|
|
19.60 miles
|
Switch: Smith School Rd
|
Switch Inc. reportedly intends to build a 300,000-square-foot (27,870 sqm) data center alongside a new Austin Energy substation.
|
|
19.64 miles
|
LightEdge Austin2 Burleson
|
The site was formerly operated by OnRamp before being acquired in July 2018.
|