EdgeConneX Begins Construction on a New Data Center in Osaka, Japan
March 19, 2026
EdgeConneX
Comcast
Level 3
NesNet
Windstream
XO
Zayo
| Distance | Site | About |
|---|---|---|
| 1.27 miles | Lumen Nashville 2 | |
| 3.40 miles | Nexus Group Nashville | |
| 4.09 miles | Verizon: 101 Molloy |
|
| 4.18 miles | Lumen Nashville 1 | |
| 4.34 miles | H5 Nashville | |
| 4.47 miles | 365 Nashville (NA1) | |
| 7.01 miles | RadiusDC: Nashville, TN |
Located on a 12-acre plot in the Trinity Hills neighborhood, the completed data center will cover 102,500 square feet (9,500 square meters) by 2026.
|
| 9.76 miles | Mapletree: 402 Franklin |
In 2020, Carter Validus sold the facility to Mapletree
|
| 13.31 miles | Flexential Brentwood |
The Brentwood site was known as "Nashville 1" and "Nashville 4" when they were operated by Peak 10.
Site
Usable SqFt
Power MW
Nashville 1
12,500
.8 MW
Nashville 4
6,600
.18 MW
Total
19,100
.98 MW
|
| 15.28 miles | Flexential Cool Springs |
The Cool Springs data center was known as "Nashville 2" and "Nashville 3" when it was formerly operated by Peak 10.
|
| 16.81 miles | Flexential Franklin TN |
The site was known as "Nashville 5" when operated by Peak 10.
|
| 17.49 miles | Compass Franklin I | |
| 17.49 miles | Tierpoint Nashville NSH |
EdgeConneX is a data center provider specializing in providing colocation facilities to host content at the edge of the network. The company provide Space, Power & Connectivity for content, network, colocation, CDNs and service providers, as well as wireless carriers, telecommunications companies, and commercial property owners. EdgeConneX has created a new Edge for traditional networks offering superior performance and economics.
March 19, 2026
EdgeConneX
September 16, 2025
EdgeConneX
August 28, 2025
EdgeConneX
September 24, 2024
EdgeConneX
April 12, 2024
EdgeConneX
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas