EdgeConneX Nashville

Latest Podcast 1841 Air Lane Drive
Operational
Fully operational facility
Operated by:

EdgeConneX Nashville

Short Code: EDCNAS01
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Data Center Notes:


  • Customer work spaces are available
  • Raised Floor: 30"
  • EdgeConnex has rights to adjacent space to accommodate expansion.

Power:


  • Concurrently maintainable power in a minimum of an N+1 configuration to include:
    • PDU
    • UPS
    • Generators
  • Capable of 20+kW per cabinet
  • Capable of 600+ watts per sq ft
  • Real-time branch circuit monitoring

Network Providers:


Comcast
Level 3
NesNet
Windstream
XO
Zayo

Map and Nearby Locations

1841 Air Lane Drive ( Building 3 )
EdgeConneX Sites
Nearby Facilities

Sites within 15 miles of EdgeConneX Nashville

Distance Site About
1.27 miles Lumen Nashville 2
3.40 miles Nexus Group Nashville
4.09 miles Verizon: 101 Molloy
4.18 miles Lumen Nashville 1
4.34 miles H5 Nashville
H5 no longer operates this facility. In a quiet consolidation shift, this site was fully decommissioned.
4.47 miles H5: Nashville 2
In January 2026, H5 Data Centers acquired a highly connected, 19,700-square-foot carrier hotel asset in Nashville from 365 Data Centers.
4.51 miles DC Blox: Nashville Campus
DC Blox’s proposed data center in Nashville is facing strong pushback from the local community.
4.63 miles Atmosphere: Nashville, TN
Atmosphere Data Centers' planned Nashville, TN facility is a Tier III+ campus spanning 38 acres, optimized for AI/HPC workloads with high-density liquid cooling and a target 1.08 PUE.
5.88 miles Fisk University: Nashville, TN
The Quantum Leap Innovation & Technology Center is a proposed $400 million, 100,000-square-foot facility spearheaded by Fisk University as the anchor of its broader $1 billion campus master plan in North Nashville, Tennessee.
7.01 miles RadiusDC: Nashville, TN
Located on a 12-acre plot in the Trinity Hills neighborhood, the completed data center will cover 102,500 square feet (9,500 square meters) by 2026.
9.76 miles Mapletree: 402 Franklin
In 2020, Carter Validus sold the facility to Mapletree
13.31 miles Flexential Brentwood
The Brentwood site was known as "Nashville 1" and "Nashville 4" when they were operated by Peak 10. Site Usable SqFt Power MW Nashville 1 12,500 .8 MW Nashville 4 6,600 .18 MW Total 19,100 .98 MW
15.28 miles Flexential Cool Springs
The Cool Springs data center was known as "Nashville 2" and "Nashville 3" when it was formerly operated by Peak 10.
16.81 miles Flexential Franklin TN
The site was known as "Nashville 5" when operated by Peak 10.
17.49 miles Tierpoint Nashville NSH
17.49 miles Compass Franklin I

Operating Company

Operated by:

EdgeConneX is a data center provider specializing in providing colocation facilities to host content at the edge of the network. The company provide Space, Power & Connectivity for content, network, colocation, CDNs and service providers, as well as wireless carriers, telecommunications companies, and commercial property owners. EdgeConneX has created a new Edge for traditional networks offering superior performance and economics.

0
Facilities
0
Markets

News See all

Read Nashville Authorizes Eminent Domain for DC BLOX Site Near Zoo
Nashville's Metro Council voted 27 to 5 on August 4 to authorize the acquisition of a proposed [DC BLOX](https://baxtel.com/data-centers/dc-blox) data center site beside the Nashville Zoo. The vote...

Nashville Authorizes Eminent Domain for DC BLOX Site Near Zoo

August 10, 2026 DC Blox: Nashville Campus

Nashville's Metro Council voted 27 to 5 on August 4 to authorize the acquisition of a proposed DC BLOX data center site beside the Nashville Zoo. The vote allows Metro Nashville to negotiate for the 23.49-acre DC BLOX Nashville Campus or pursue eminent domain if the parties cannot agree. The...

Read more
Read EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County
EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

June 03, 2026 EdgeConneX

US operator EdgeConneX has filed plans to construct two 730,000-square-foot (67,820 sqm) data centers in Bastrop County, Texas. Named EDCAUS11 and EDCAUS12, the projects are planned for a 180-acre site at 6682 FM 535 in Cedar Creek, which the company acquired in November 2025. The parcel is...

Read more
Read EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy
EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

May 23, 2026 EdgeConneX

The government of Italy has described EdgeConneX’s €3 billion investment as being of “national strategic interest.” The EdgeConneX Campus Italia program, announced on May 14 during a council of ministers chaired by Prime Minister Giorgia Meloni, will develop three data center campuses in the...

Read more
Read EdgeConneX Begins Construction on a New Data Center in Osaka, Japan
EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

March 19, 2026 EdgeConneX

EdgeConneX has begun construction on a new data center outside Osaka, Japan. The company announced this week that it is developing its first 200MW, AI-ready campus in Greater Osaka in partnership with Kagoya Asset Management.The Kyotanabe campus will cover 130,000 sqm (1.4 million sq ft), with...

Read more
Read EdgeConneX Partners with Ral Estate Firm Stockland
EdgeConneX Partners with Ral Estate Firm Stockland

EdgeConneX Partners with Ral Estate Firm Stockland

September 16, 2025 EdgeConneX

ASX-listed real estate firm Stockland announced it had formed an exclusive arrangement with EdgeConneX to establish a partnership to develop, own, and operate a data center portfolio, and was “exploring opportunities across Stockland’s logistics pipeline.”This partnership will combine...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?