|
9.26 miles
|
NTT: Milan
|
NTT Data has acquired 53 acres of land to develop a data center near Milan, Italy.
|
|
9.79 miles
|
Edge RidgeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.81 miles
|
Vantage: MXP11
|
Once fully developed, the MXP1 campus will offer 517,000 square foot (48,000 square meters) of data center space with 300W/SF (3.2kW/M²) average density.
|
|
9.82 miles
|
Point BetaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
9.84 miles
|
Vantage: MXP12
|
This facility is part of Vantage's MXP1 campus in Milan, Italy.
|
|
9.87 miles
|
Vantage: MXP13
|
This facility is part of Vantage's MXP1 campus in Milan, Italy.
|
|
9.91 miles
|
Vantage: MXP14
|
This facility is part of Vantage's MXP1 campus in Milan, Italy.
|
|
9.95 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
10.03 miles
|
OVH: Milan
|
European cloud and colocation provider OVHcloud has announced the opening of a new data center in the Milan region of Italy. This new facility is believed to be a former DXC Technology data center.
|
|
10.63 miles
|
Greenfield: Lombardia 02
|
UK infrastructure developer Greenfield plans a data center in Milan, Italy.
|
|
13.87 miles
|
MaxInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
14.01 miles
|
Echelon: LIN10 Bldg-2
|
This facility is part of Echelon's LIN10 campus in Milan.
|
|
14.01 miles
|
Stack: MIL03A
|
|
|
14.03 miles
|
Echelon: LIN10 Bldg-1
|
LIN10 Bldg-1 is the first building on Echelon's LIN10 campus, a converted former printing plant at Via della Costa 2, Treviglio, near Milan.
|
|
14.09 miles
|
Stack: MIL08
|
Stack Infrastructure's MIL08 Campus is a stone’s throw from MIL02A and the MIL01 campus and will be served by 100% renewable power.
|
|
14.39 miles
|
Stack: MIL01C
|
STACK's MIL01C is the smallest of three buildings on the MIL01 campus in Siziano, south of Milan, with solar panels on its roof. STACK built it from 2023.
|
|
14.49 miles
|
Vaultica: Siziano MIL01
|
Vaultica sells carrier-neutral enterprise colocation on STACK's MIL01 campus in Siziano, south of Milan. The business was part of STACK until Apollo-managed funds bought it in 2025.
|
|
14.49 miles
|
Stack: MIL01A
|
STACK's MIL01A is the first building on the MIL01 campus in Siziano, south of Milan. SUPERNAP Italia opened it in 2016 and it became STACK in 2022. Vaultica also sells colocation on the campus.
|
|
14.61 miles
|
Stack: MIL01B
|
STACK's MIL01B is the second building on the MIL01 campus in Siziano, south of Milan, with two independent data halls. SUPERNAP Italia completed it in 2021 and it became STACK in 2022.
|
|
14.64 miles
|
STACK: MIL02A
|
Stack Infrastructure's MIL02A data center sits adjacent to the MIL01 campus and is served by 100% renewable power. This is Stack's third data center in Siziano.
|
|
14.74 miles
|
Rai Way: Milan
|
Rai Way's Siziano Campus is located in Milan, Italy.
|
|
14.83 miles
|
EdgeConneX: Milan 01
|
This facility is part of the EdgeConneX Campus Italia program, a €3 billion digital infrastructure initiative fast-tracked by the Italian government as a project of national strategic interest.
|
|
14.92 miles
|
Core CampusInterested in this information?Contact us
|
|
|
14.94 miles
|
Park BetaInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
15.91 miles
|
Greenfield: Milan
|
UK infrastructure developer Greenfield has partnered with Irish specialist investor Finsbury Infrastructure to construct a €360 million ($418 million) data center east of Milan, Italy.
|
|
16.33 miles
|
MOMIT Milan
|
|
|
16.38 miles
|
CyrusOne: MIL2
|
CyrusOne is expanding its presence in Milan, Italy, with a second data center.
|
|
16.50 miles
|
CyrusOne: Milan MIL1
|
CyrusOne has broken ground on its MIL1 data center at Via Reggio Emilia, 39, Segrate (Milan), Italy, a 27MW, three-storey facility delivering approximately 7,000 sqm (75,345 sq ft) of technical space. Construction began in March 2026, with the first 9MW phase expected online by Q3 2027, followed by phased expansion to full capacity.
|
|
16.93 miles
|
Noovie: Rozzano DC4
|
|
|
17.52 miles
|
Equinix Milan ML3
|
Equinix opened its second facility in Milan, located in Basiglio, in the first quarter of 2009. Prior to Equinix's acquisition of Telecity in July 2016, this site operated as a Telecity-managed data center.
|
|
17.81 miles
|
Apto: Lacchiarella
|
Apto, a European firm, plans a massive €3 billion ($3.4bn) data center campus in Lacchiarella, near Milan, Italy.
|
|
18.45 miles
|
Magnora: Milan 2
|
Magnora secured industrial-zoned land near Milan for a new data center development, with grid studies underway and a potential sale milestone in 2027.
|
|
18.45 miles
|
Poste Italiane: Lombardy
|
Italian state-controlled operator Poste Italiane is developing a large-scale AI data center in Lombardy for model training and inference, having already secured both the land and power supplier.
|
|
18.48 miles
|
EdgeConneX: Milan 02
|
This facility is part of the EdgeConneX Campus Italia program, a €3 billion digital infrastructure initiative fast-tracked by the Italian government as a project of national strategic interest.
|
|
18.48 miles
|
K2: Milan Campus
|
Malaysian conglomerate Kuok Group, through its digital infrastructure arm K2 Strategic, is planning a massive €5.3 billion ($6 billion) investment to develop and manage a hyperscale data center campus on the southern outskirts of Milan.
|
|
18.53 miles
|
Greenfield: Lombardia 01
|
UK infrastructure developer Greenfield plans a data center in Milan, Italy.
|
|
18.58 miles
|
Equinix Milan ML4
|
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
|
|
18.61 miles
|
GSM: Certosa di Pavia
|
Spearheaded by real estate developer GSM, the proposed 646,000 sq ft complex would consist of three buildings situated near the town’s historic 14th-century monastery.
|
|
18.69 miles
|
Vitali: Arcene Innovation Hub
|
The Innovation Hub is a planned 181,000-square-meter data center campus developed by the Vitali Group on the former Tre Cantoni quarry site in Arcene, Northern Italy.
|
|
18.74 miles
|
Compass Milan
|
|
|
19.16 miles
|
Level3 Milan (Via Tortona)
|
|
|
19.65 miles
|
Equinix Milan ML2
|
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
|