EdgeConneX CHI02

2021 Lunt Ave

░░░░░░ Login to view SqFt Gross Colocation Size

░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

Map and Nearby Locations:

2021 Lunt Ave
Click Map to begin Search

Sites within 15 miles of EdgeConneX CHI02

Show SqM
Distance Site About
0.09 miles Stream Chicago I
0.10 miles EdgeConneX CHI01
0.12 miles Equinix Chicago CH3
0.33 miles Stream Chicago II
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
0.57 miles 2299 Busse (CH2) Digital Realty
0.68 miles Centersquare: Chicago ORD2
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
0.69 miles 2200 Busse Rd (CH1) DRT
0.69 miles Rackspace Elk Grove ORD1
0.69 miles Digital Elk Grove Village Campus
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
0.69 miles ServerCentral CH1
0.69 miles HostPapa CH1
Formerly known as "ColoCrossing CH1"
0.71 miles STACK Chicago CHI01
0.79 miles 1450 E Devon Ave (CH3) DRT
0.81 miles STACK CHI01B
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
0.93 miles CoreWeave: US Central ORD1
1.27 miles Skybox Chicago I
1.56 miles Prime Elk Grove
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
1.61 miles Prime: ORD1 Bldg B
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
1.64 miles Prime: ORD1 Bldg C
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
1.88 miles T5 Chicago II
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
1.89 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
2.06 miles CenturyLink: Arlington Heights
2.07 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
2.29 miles CloudHQ: Mount Prospect ORD2
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
2.32 miles CloudHQ: Mount Prospect ORD1
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
2.42 miles CloudHQ Mount Prospect ORD3
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
2.74 miles Aligned: ORD-03
Aligned is about to build a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International. The company’s plan for the 36-acre site calls for a pair of two-story, 520,000-square-foot data centers.
2.78 miles NTT: 1250 N Arlington Heights (Planned)
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
2.79 miles NTT: 1200 N Arlington Heights (Planned)
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
3.15 miles NTT Chicago CH1
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
3.71 miles Iron Mountain Chicago
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
5.02 miles T5 Northlake IL
T5 Data Center is expanding its footprint in Chicago. T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 300,000 sq ft facility for multi-tenant or single-tenant operations.
5.44 miles Colocation America CH3
5.44 miles DataBank ORD3 Mount Prospect
5.79 miles Microsoft Chicago Northlake
6.04 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
6.34 miles Aligned Chicago ORD-01
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
6.38 miles Aligned ORD-02
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus, ORD-02 offers exceptional connectivity at the convergence of over 12 metro/long-haul networks. At full build, ORD-02 building will provide 36MW of critical load capacity expandable to ~52 MW.
6.95 miles Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
6.97 miles 9377 Grand Ave
6.99 miles 9355 Grand Ave
7.04 miles SingleHop Chicago
7.04 miles 9333 Grand Ave (DRT)
7.07 miles Tierpoint Chicago West
7.09 miles Complete Source Schaumburg
10.33 miles LexusNexis Oak Brook
10.33 miles Verizon: Swift Dr
10.33 miles DataBank (ORD4) Oak Brook
10.60 miles Microsoft Hoffman Estates 2
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
10.73 miles Microsoft Hoffman Estates 1
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
10.74 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
10.74 miles US Signal Oakbrook
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
10.74 miles Verizon: (Oak Brook)
10.82 miles NYI Chicago (Oak Brook)
10.96 miles Digital Fortress: Chicago Lombard
10.96 miles 360TCS-Lombard
11.24 miles CyrusOne Chicago Lombard
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
11.25 miles Lumen Broadview
13.09 miles Equinix Chicago CH7
14.78 miles Compass Hoffman Estates
15.57 miles Centersquare: Lisle CHI1
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
16.85 miles Cogent Naperville
17.15 miles Metro Edge: Illinois Medical District (IMD)
Commercial real estate investment firm Metro Edge Development is building a data center in Chicago, Illinois.
17.34 miles Lumen Chicago 2
17.45 miles Lumen Chicago 4
17.53 miles New Continuum: 603 Discovery
18.03 miles EXA - 111 North Canal
Former GTT suite
18.03 miles Lumen Chicago 1
18.13 miles NetSource Chicago
18.18 miles Lumen Chicago 6
18.25 miles Lumen Chicago 3
18.26 miles TierPoint Chicago Polk
18.27 miles First Communications Chicago
18.32 miles QTS Chicago
The campus was a former Sun Times Press Facility and was acquired in 2014
18.42 miles DataBank (ORD2) 840 S Canal
18.42 miles Server Farm Realty 840 South Canal
4 MW Critical Load on Each Floor (Floors 1-5) 130-160 Watts per Raised Floor SF
18.43 miles Cogent: 216 W Jackson
18.60 miles Verizon: 140 S Dearborn
18.64 miles QuadraNet Chicago
18.64 miles Cogent: 427 S LaSalle
18.64 miles CoreSite Chicago CH1
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
18.64 miles 365 Chicago
The site is a former Switch and Data site (also owned by Equinix for a short period.)
18.64 miles InfoRelay Chicago
18.66 miles Netrality Chicago: 717 S Wells
The 10 story building was constructed in 1923 and eventually was converted into a data center.
18.67 miles Steadfast Chicago 725 Wells
18.67 miles Atlantic Metro ORD3
18.67 miles Crown Castle 725 S Wells
18.67 miles Colo@ Chicago
18.67 miles 725 S Wells - 1547 Critical Systems
1547 Acquired the site in December of 2018.
18.67 miles CoreSite Chicago CH2
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
18.76 miles Cogent: 600 S Federal
18.76 miles Colocation America CH2
18.76 miles Lumen Chicago 5
18.77 miles 600 S Federal - Digital Realty
19.97 miles Equinix Chicago CH1, CH2, & CH4
Equinix distinctly separates CH1, CH2, and CH4 into separate data centers, but in reality, the sites are in the same building.
19.97 miles Atlantic Metro ORD0
19.97 miles 350 E Cermak - Digital Realty
19.97 miles Colocation America CH1
19.97 miles Steadfast Chicago 350 E Cermak
19.97 miles Centersquare: Chicago ORD1
Centersquare's ORD1 site is located in the heart of the Chicago Financial District on the 7th floor of an 8-story building on a fiber-linked campus.
19.98 miles Centersquare: Chicago ORD1(B, C & D)
Digital Realty Trust owns the building at 350 Cermak and is CTL's Landlord.
19.99 miles ServerCentral Chicago DRT-CH1

EdgeConneX CHI02 Data Center Photos

Operating Company

EdgeConneX is a data center provider specializing in providing colocation facilities to host content at the edge of the network. The company provide Space, Power & Connectivity for content, network, colocation, CDNs and service providers, as well as wireless carriers, telecommunications companies, and commercial property owners. EdgeConneX has created a new Edge for traditional networks offering superior performance and economics.

55 Facilities Owned
36 Markets Served
345.75 Megawatts
View Company

News

Read More News