EdgeConneX Begins Construction on a New Data Center in Osaka, Japan
March 19, 2026
EdgeConneX
Cox
Integra
XO
Zayo
| Distance | Site | About |
|---|---|---|
| 0.43 miles | Fiberhub - Las Vegas |
|
| 0.70 miles | ColoXchange Las Vegas | |
| 0.93 miles | DataBank Las Vegas LAS1 |
The site was a former zColo (Zayo) facility before being acquired in 2020.
|
| 2.52 miles | Lumen: Las Vegas 3 | |
| 3.45 miles | Verizon: 2240 Corporate Cir | |
| 4.46 miles | Switch Las Vegas 7 | |
| 4.46 miles | Contegix Las Vegas | |
| 4.46 miles | Hyperscale Data Center Request Dataset | |
| 4.48 miles | Switch Las Vegas 12 | |
| 4.51 miles | Switch Las Vegas CORE Campus |
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
|
| 4.61 miles | Switch Edge 1 | |
| 4.69 miles | Switch Las Vegas 8 | |
| 4.69 miles | Switch Las Vegas 11 | |
| 4.83 miles | Switch Las Vegas 10 | |
| 4.84 miles | Switch Las Vegas 9 | |
| 5.13 miles | Switch: Las Vegas 15 | |
| 6.15 miles | Switch Las Vegas 5 | |
| 6.22 miles | Lumen: Las Vegas 2 | |
| 6.32 miles | Switch Las Vegas 2 | |
| 6.41 miles | ISP.Net DC2 | |
| 6.45 miles | ISP.Net DC1 |
|
| 6.72 miles | Hyperscale Data Center Request Dataset |
|
| 7.18 miles | Flexential Carson I & II |
|
| 7.36 miles | Edged Energy: Las Vegas LAS01 |
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
|
| 8.94 miles | Switch: Jones 2 |
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
|
| 8.94 miles | Switch: Jones Boulevard Campus |
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
|
| 11.86 miles | Lumen: Las Vegas (1 Aerojet) | |
| 12.75 miles | Flexential Las Vegas (Lone Mountain) |
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest.
AwardedTier IV Design Certification by the Uptime Institute for the design documents
3,000 tons redundant, fault-tolerant cooling capacity
|
| 14.62 miles | Townsite Solar 2: Boulder City |
Townsite Solar 2 LLC has proposed a high-density AI data center campus on 88.5 acres of city-owned land in Boulder City, Nevada.
|
| 14.92 miles | Novva Las Vegas |
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.
|
EdgeConneX is a data center provider specializing in providing colocation facilities to host content at the edge of the network. The company provide Space, Power & Connectivity for content, network, colocation, CDNs and service providers, as well as wireless carriers, telecommunications companies, and commercial property owners. EdgeConneX has created a new Edge for traditional networks offering superior performance and economics.
March 19, 2026
EdgeConneX
September 16, 2025
EdgeConneX
August 28, 2025
EdgeConneX
September 24, 2024
EdgeConneX
July 15, 2024
Las Vegas
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas