EdgeConneX Las Vegas

Latest Podcast 1541 Pama Lane
Operational
Fully operational facility
Operated by:

EdgeConneX Las Vegas

░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Data Center Notes:


  • Customer work spaces are available
  • Raised Floor: 30"
  • EdgeConnex has rights to adjacent space to accommodate expansion.

Power:


  • Concurrently maintainable power in a minimum of an N+1 configuration to include:
    • PDU
    • UPS
    • Generators
  • Capable of 20+kW per cabinet
  • Capable of 600+ watts per sq ft
  • Real-time branch circuit monitoring

Cooling:


  • Temperature and humidity
    monitored, controlled and
    managed to industry standards
  • 30 inch raised/under floor forced
    air plenum
  • N+1 CRACs located in separate suites,
    maximizing customer-designated areas

Network Providers:


Cox
Integra
XO
Zayo

Map and Nearby Locations

1541 Pama Lane
EdgeConneX Sites
Nearby Facilities

Sites within 15 miles of EdgeConneX Las Vegas

Distance Site About
0.43 miles Fiberhub - Las Vegas
0.70 miles ColoXchange Las Vegas
0.93 miles DataBank Las Vegas LAS1
The site was a former zColo (Zayo) facility before being acquired in 2020.
2.52 miles Lumen: Las Vegas 3
3.45 miles Verizon: 2240 Corporate Cir
4.46 miles Contegix Las Vegas
4.46 miles Switch Las Vegas 7
4.46 miles CoreWeave: US West LAS1
4.48 miles Switch Las Vegas 12
4.51 miles Switch Las Vegas CORE Campus
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
4.61 miles Switch Edge 1
4.69 miles Switch Las Vegas 8
4.69 miles Switch Las Vegas 11
4.83 miles Switch Las Vegas 10
4.84 miles Switch Las Vegas 9
5.13 miles Switch: Las Vegas 15
5.27 miles Switch: Armory Building 2
The central data center building in Switch’s approved three-building Armory Campus development.
5.34 miles Switch: Armory Building 1
The northernmost of three identical data center buildings approved for Switch’s Armory Campus in Enterprise.
5.36 miles Switch: Armory Building 3
The southernmost data center building approved for Switch’s Armory Campus near Las Vegas.
6.15 miles Switch Las Vegas 5
6.22 miles Lumen: Las Vegas 2
6.32 miles Switch Las Vegas 2
6.41 miles ISP.Net DC2
6.45 miles ISP.Net DC1
6.72 miles ValleyInterested in this information?Contact us
7.18 miles Flexential Carson I & II
7.36 miles Edged Energy: Las Vegas LAS01
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
7.65 miles Switch: Apex Industrial Park
Switch has acquired a combined 316 acres at Apex Industrial Park in North Las Vegas, Nevada, through two land purchases totaling $180.5 million—including 176 acres acquired in January 2026 for $85.5 million and an additional 140 acres acquired in March 2026 for $95 million. The combined site represents a large-scale landholding for future data center campus development.
8.94 miles Switch: Jones 2
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
8.94 miles Switch: Jones Boulevard Campus
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
11.86 miles Lumen: Las Vegas (1 Aerojet)
12.75 miles Flexential Las Vegas (Lone Mountain)
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest. AwardedTier IV Design Certification by the Uptime Institute for the design documents 3,000 tons redundant, fault-tolerant cooling capacity
14.62 miles Townsite Solar 2: Boulder City
Townsite Solar 2 LLC has proposed a high-density AI data center campus on 88.5 acres of city-owned land in Boulder City, Nevada.
14.92 miles Novva Las Vegas
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.

EdgeConneX Las Vegas Data Center Photos See all

EdgeConnex at 1541 Pama Lane in Las Vegas
Source: Baxtel
The Pama Technology Center is a four building complex
Edgeconnex is located in the Pama Technology Center
Source: Baxtel

The Pama Technology Center is a four building complex

Operating Company

Operated by:

EdgeConneX is a data center provider specializing in providing colocation facilities to host content at the edge of the network. The company provide Space, Power & Connectivity for content, network, colocation, CDNs and service providers, as well as wireless carriers, telecommunications companies, and commercial property owners. EdgeConneX has created a new Edge for traditional networks offering superior performance and economics.

99
Facilities
48
Markets

News See all

Read EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County
EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

June 03, 2026 EdgeConneX

US operator EdgeConneX has filed plans to construct two 730,000-square-foot (67,820 sqm) data centers in Bastrop County, Texas. Named EDCAUS11 and EDCAUS12, the projects are planned for a 180-acre site at 6682 FM 535 in Cedar Creek, which the company acquired in November 2025. The parcel is...

Read more
Read EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy
EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

May 23, 2026 EdgeConneX

The government of Italy has described EdgeConneX’s €3 billion investment as being of “national strategic interest.” The EdgeConneX Campus Italia program, announced on May 14 during a council of ministers chaired by Prime Minister Giorgia Meloni, will develop three data center campuses in the...

Read more
Read EdgeConneX Begins Construction on a New Data Center in Osaka, Japan
EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

March 19, 2026 EdgeConneX

EdgeConneX has begun construction on a new data center outside Osaka, Japan. The company announced this week that it is developing its first 200MW, AI-ready campus in Greater Osaka in partnership with Kagoya Asset Management.The Kyotanabe campus will cover 130,000 sqm (1.4 million sq ft), with...

Read more
Read EdgeConneX Partners with Ral Estate Firm Stockland
EdgeConneX Partners with Ral Estate Firm Stockland

EdgeConneX Partners with Ral Estate Firm Stockland

September 16, 2025 EdgeConneX

ASX-listed real estate firm Stockland announced it had formed an exclusive arrangement with EdgeConneX to establish a partnership to develop, own, and operate a data center portfolio, and was “exploring opportunities across Stockland’s logistics pipeline.”This partnership will combine...

Read more
Read EdgeConneX to Develop Second Facility in Japan
EdgeConneX to Develop Second Facility in Japan

EdgeConneX to Develop Second Facility in Japan

August 28, 2025 EdgeConneX

Data center firm EdgeConneX this week announced the acquisition of its second data center site in the Greater Osaka and Yawata areas of Japan. The new site will provide an additional 150MW upon completion, bringing EdgeConneX's total data center capacity in Japan to 350MW of utility power at full...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your