Overview
Skellefteå (Västerbotten) covers Västerbotten county in northern Sweden, from Skellefteå and Umeå on the coast to Lycksele and Vilhelmina inland. A Vilhelmina server hall opened in 2014 and closed in 2018, when its operator went bankrupt. Bitcoin miners came to Robertsfors and Örträsk in 2021. Northvolt's bankruptcy in March 2025 left a powered industrial site in Skellefteå, and EdgeConneX bought about half of it in 2026.
The Market Today
EdgeConneX is turning its part of the Northvolt site at Bergsbyn into the Skellefteå campus. In September 2026 the municipality granted building permits for the first phase, due in 2028: two converted Northvolt buildings and one new data centre. Five more buildings are planned by early 2031.
Umeå University runs HPC2N, a national supercomputing centre. Nordlo runs a data centre in a rock chamber in Lycksele. SWI Digital mines bitcoin in containers at Örträsk. HIVE left its Robertsfors mine in 2026.
Advantages
-
Grid room. Svenska kraftnät (Svk) maps more than 500 MW of free withdrawal capacity in Västerbotten for 2026.
-
Cheap power. Skellefteå and the north lie in SE1, and Umeå and the south in SE2. Both zones had Sweden's lowest spot prices in 2025, and the whole county qualifies for the Norrland energy tax deduction.
-
Powered industrial land. The Northvolt site was zoned for industry in 2017, and EdgeConneX takes over its grid connections.
Challenges
-
Local opposition. Thousands of residents signed a protest petition against the EdgeConneX campus in autumn 2026. They cite noise, backup power and electricity use.
-
Permits. EdgeConneX's environmental permit consultation with the County Administrative Board (Länsstyrelsen) runs until early 2027.
Power and Policy
Skellefteå Kraft, owned by Skellefteå municipality, runs the local grid and hydropower plants on the Skellefte River. Umeå Energi serves Umeå, and Vattenfall Eldistribution serves parts of the inland.