EdgeConnex Minneapolis

Latest Podcast
6875 Shady Oak Road
Operational
Fully operational facility
Operated by:

EdgeConnex Minneapolis

Ownership: EdgeConneX does not own the building.
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Datacenter:

• 32,738 sq ft facility
• 15,000 sq ft of raised floor for tenant racks
• Maintains ROFR on adjacent spaces
• Within 13 miles from downtown MIN and 14 miles from Minneapolis-St. Paul International Airport
• Customer work space available
• Space available for secure customer storage
• WiFi network access and cell phone repeaters/boosters throughout the facility

Power:

  • Concurrently maintainable power in a minimum of an N+1 configuration to include:
    • PDU
    • UPS
    • Generators
  • Capable of 20+kW per cabinet
  • Capable of 600+ watts per sq ft
  • Ghost space not required for cooling power dense installations
  • Real-time branch circuit monitoring

Cooling:

• Temperature and humidity monitored, controlled and managed to industry standards
• 30 inch raised/under floor forced air plenum
• N+1 CRACs located in separate suites, maximizing customer-designated areas

Map and Nearby Locations:

6875 Shady Oak Road
EdgeConneX Sites
Nearby Facilities

Sites within 15 miles of EdgeConnex Minneapolis

Distance Site About
0.21 miles US Signal: MN01 Minneapolis
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
1.96 miles Lumen Minnetonka
3.78 miles Consolidated Edina
3.78 miles Databank Minneapolis Edina MSP1
7.40 miles Centersquare: Minneapolis MP2
9.16 miles G42: Minneapolis
G42 is the primary tenant of Legacy Investing's Minneapolis CBD data center.
9.16 miles Cloud Capital: Minneapolis CBD
In 2026, Cloud Capital and Arcapita acquired the data center from Legacy Investing LLC.
9.29 miles Level3 Minneapolis (222 South 9th)
9.70 miles Cogent: 250 Marquette
9.71 miles Cologix: Minnesota Technology Center
Cologix's Minnesota's 5 data halls are located within the 511 carrier hotel. The 511 11th Avenue Building, located across the street from the Metrodome (home of the Minnesota Vikings) was under threat of being torn down to make room for a new stadium, but the building was saved MIN1 is the Building's MMR
9.71 miles Lumen Minneapolis 2
9.71 miles DataBank Minneapolis MSP4
In 2020, DataBank acquired the facility from Zayo.
9.71 miles Level3 Minneapolis (511 11th)
9.72 miles Verizon: 250 Marquette
The site is a previous XO Communications facility
9.72 miles 511 Building - Minnesota Technology Center
9.75 miles Flexential Minneapolis
9.86 miles Verizon: 1200 Washington
Former XO Communications site
9.92 miles IronGate: MSP4
The facility is designed as a redundant carrier hub for the 511 4th Street data infrastructure.
11.77 miles Swervo: Eagan
The 245,000-square-foot data center in Eagan, which was originally operated by Unisys (and formerly Sperry), officially changed hands in 2025.
11.78 miles IronGate: MSP3
12.27 miles UnitedHealth Chaska
12.34 miles US Bank Chaska (Stream DC2)
12.35 miles CloudHQ: Chaska MN
The company plans to invest a total of $1 billion in the new Chaska center for a total of 1.4 million sqft.The company plans to invest a total of $1 billion in the new Chaska center for a total of 1.4 million sqft.
12.37 miles Stream Minneapolis
12.42 miles Lightedge: Minneapolis
12.96 miles DataBank Minneapolis Eagan MSP2
14.13 miles H5 Minneapolis
14.66 miles Centra: Minneapolis
U.S. data center firm Centra has broken ground on MSP1, a new carrier-neutral data center located in Eagan, Dakota County.
14.99 miles Connect Data Centers: Eagan, MN
CLOP Eagan MN, LLC, with involvement from Oppidan, intends to develop a 61,000 square foot data center on a 22.1-acre portion of YMCA-owned land on Opperman Drive in Eagan, Minnesota.
15.03 miles Connect Data Centers: Apple Valley, MN
The Apple Valley Campus will consist of seven buildings, five of which will be dedicated data centers, encompassing a total building area of approximately 1 million square feet (92,900 sqm).
16.17 miles US Signal: Saint Paul
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
16.70 miles Edged Energy: Minneapolis MSP01
Edged Energy plans to construct a data center campus in Minneapolis, with operations expected to begin in Q1 2029.
16.70 miles Edged Energy: MSP01 Expansion
18.37 miles DataBank Brooklyn Park MSP3
19.07 miles Hyperscale Data Center Request Dataset
Meta Platforms Inc., through its subsidiary Jimnist LLC, has acquired over 200 acres of land in Rosemount located along County Road 42 and Blaine Avenue in February 2025.
19.29 miles Hyperscale Data Center Request Dataset
Meta, the parent company of Facebook, announced it will build an $800 million data center in Rosemount.

EdgeConnex Minneapolis Data Center Photos (See all)

Operating Company

Operated by:

EdgeConneX is a data center provider specializing in providing colocation facilities to host content at the edge of the network. The company provide Space, Power & Connectivity for content, network, colocation, CDNs and service providers, as well as wireless carriers, telecommunications companies, and commercial property owners. EdgeConneX has created a new Edge for traditional networks offering superior performance and economics.

91
Facilities
26
Markets
465MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?