EdgeConneX: Kyotanabe 2

Latest Podcast 39-16 Tataranishihirakawara
Planned
Future facility in planning stage
Operated by:

EdgeConneX: Kyotanabe 2

This facility is part of EdgeConneX Kyotanabe campus in Osaka.

Map and Nearby Locations

39-16 Tataranishihirakawara
EdgeConneX Sites
Nearby Facilities

Sites within 15 miles of EdgeConneX: Kyotanabe 2

Distance Site About
0.10 miles EdgeConneX: Osaka Kyotanabe
EdgeConneX has broken ground on a 200MW AI-ready data center campus in Kyotanabe, Greater Osaka, Japan, spanning approximately 130,000 sqm (1.4 million sq ft). Construction began in March 2026, with the first 28MW phase expected online by early 2028, followed by phased expansion to full capacity.
2.96 miles STACK: KIX01B
This facility is a part of Stack's KIX01 Campus in Osaka, Japan.
2.97 miles STACK Osaka KIX01
Located in Osaka’s eastern suburb of Keihanna, this data center campus will comprise three buildings with robust access to power and network to ensure strong reliability.
2.97 miles ESR Group: Keihanna OS4
ESR Group and STACK Infrastructure, major players in APAC's New Economy real estate and global digital infrastructure, are jointly building a new data center campus in Keihanna, Japan (Kansai region).
2.99 miles Colt Osaka Keihanna
3.00 miles STACK: KIX01C
This facility is a part of Stack's KIX01 Campus in Osaka, Japan.
3.04 miles Kagoya: Keihanna Lab A
The data center's first three-story Building A was built in 2006, with a four-story Building B added in 2014. Currently, the two are connected by a walkway, providing server space for up to 650+ racks.
3.06 miles Kagoya: Keihanna Lab B
The facility Lab B is a four-story building located on Kagoya's Keihanna Campus in Kyoto, Japan. It covers an area of 3275.29 square meters (including corridors) and has a capacity of 400 racks.
3.33 miles NTT Keihanna OSK11
4.26 miles EdgeConneX: Yawata 3
This facility is part of EdgeConneX Yawata Campus in Osaka.
4.29 miles EdgeConneX: Yawata 2
This facility is part of EdgeConneX Yawata Campus in Osaka.
4.30 miles EdgeConneX: Osaka Yawata
EdgeConneX expands in Japan, securing a long-term land lease for its second data center site in Greater Osaka/Yawata.
4.40 miles ADA: Osaka East 1
GLP's data center subsidiary, Ada Infrastructure, plans to build a four-story data center in East Osaka, Japan. The site will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
10.44 miles Goldman Sachs: Higashiosaka
Goldman Sachs acquired land to build a data centre in Daito, Higashiosaka.
11.26 miles NTT Osaka 7
12.34 miles NTT: Nishiai
NTT acquired eight acres in Osaka Nishiai to develop two data centers, with the first facility expected to open in fiscal year 2027.
13.41 miles CapitalLand: Osaka 01
The new facility will include more than nine data halls along with dedicated office and working spaces to support operations.
13.89 miles Vantage Osaka (KIX1)
Located in Ibaraki, the Osaka campus comprises 485,000 square feet (45,000 square meters) and features two four-story, state-of-the-art facilities built to withstand even the worst earthquakes.
13.90 miles Vantage: KIX12
This facility will be part of Vantage's Osaka (KIX1) Campus in Osaka, Japan.
14.39 miles IDC Frontier: Osaka Suita
14.55 miles MC Digital Osaka Connected Campus (KIX)
14.71 miles Equinix Osaka OS3
14.76 miles Telehouse: Osaka 2
Built as the major Telehouse Data Center for the west of Japan, The Osaka 2 Data Center facility began service on 21st August, 2015.
14.76 miles Digital Edge: Osaka OSA1
14.89 miles MC Digital Osaka 1 (KIX10)
14.98 miles MC Digital Osaka 2 (KIX11)
15.20 miles MC Digital Osaka 4 (KIX13)
15.37 miles Equinix: OS2x
15.42 miles Telehouse: Osaka Umeda
KDDI Telehouse operates a colocation data center in Umeda, Osaka.
15.42 miles Optage: Umeda North
This state-of-the-art data center began operations in 2012. The facility encompasses 11,534 square meters of gross floor area, with 4,000 square meters dedicated to colocation space containing 1,300 racks.
15.45 miles MC Digital Osaka 3 (KIX12)
15.62 miles IIF Osaka Toyonaka
The IIF Osaka Toyonaka Data Center facility, constructed in September 1991, stands on a 4,769.70-square-meter plot of land. The building features a total floor area of 20,027.14 square meters.
16.03 miles NTT OS2 (Telepark Dojima Building 2)
16.04 miles Optage: Sonezaki
Named 'Optage Sonezaki Data Center,' the 14-story carrier-neutral facility will offer 24,100 square feet (2,250 square meters) of space and incorporate seismic isolation design for earthquake protection.
16.35 miles Equinix: OS4x
Equinix's fourth data center in Osaka, Japan, is connected to the adjacent OS2x in Minoh City, Osaka Prefecture. The facility has 4,925 square meters (53,025 square feet) of data center space.
16.35 miles Equinix: OS5x
16.42 miles NTT Osaka OS4
16.72 miles AirTrunk: Osaka OSK2
AirTrunk’s newly announced OSK2 project is a massive hyperscale development located in East Osaka, designed specifically to meet the surging demand for cloud and artificial intelligence (AI) infrastructure in the Kansai region.
16.72 miles Empyrion: Osaka JP2
16.72 miles AirTrunk: OSK2 Expansion
16.85 miles NTT: Osaka North 1(OSK12)
NTT Global Data Centers has officially broken ground on its Osaka North 1 (OSK12) data center in Ibaraki City, marking a significant expansion into one of Japan’s fastest-growing digital hubs.
16.89 miles NTT Data Osaka Dojima (Building #4)
16.89 miles NTT OS3 (Telepark Dojima Building 3)
17.00 miles Colt: Minoh 2
This facility is part of Colt's Minoh Campus in Osaka, Japan.
17.00 miles ESR Group: Minoh, Osaka
ESR Group and Colt Data Centre Services (Colt DCS) have formed a joint venture to develop the initial phase of a hyperscale data center in Minoh City, Osaka, Japan.
17.00 miles Colt: Minoh, Osaka
ESR Group and Colt Data Centre Services (Colt DCS) have formed a joint venture to develop the initial phase of a hyperscale data center in Minoh City, Osaka, Japan.
17.23 miles Telehouse: Osaka Shinsaibashi
KDDI Telehouse operates a colocation data center in Shinsaibashi, Japan.
17.23 miles Optage: Shinsaibashi
The Shinsaibashi Data Center in central Osaka was launched in 2008. OPTAGE will establish a new connectivity area “Shinsaibashi POP (Point Of Presence)” within the existing Shinsaibashi Data Center in Osaka City By 2025.
17.23 miles NTT Osaka 5
17.23 miles Hyperscale Data Center Request Dataset
17.23 miles INAP Osaka
17.35 miles Equinix Osaka OS1
Opened in 2013, the first phase, with room for 320 cabinets is a US$12m investment. Once fully opened the site will carry 800 cabinets.
17.36 miles Optage: Shinmachi
17.38 miles Mapletree: Osaka
The multi-story facility is built on a 4,200 sqm site and offers 13,330 sqm of total space, including 12,720 sqm of lettable area. The property comes with a 70-year land lease that began October 1, 2020.
19.58 miles AirTrunk: Osaka OSK1
Located in West Osaka, the development consists of a 16,500sqm facility dedicated to high-scale cloud requirements.

EdgeConneX: Kyotanabe 2 Data Center Photos See all

Operating Company

Operated by:

EdgeConneX is a data center provider specializing in providing colocation facilities to host content at the edge of the network. The company provide Space, Power & Connectivity for content, network, colocation, CDNs and service providers, as well as wireless carriers, telecommunications companies, and commercial property owners. EdgeConneX has created a new Edge for traditional networks offering superior performance and economics.

99
Facilities
48
Markets

News See all

Read EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County
EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

June 03, 2026 EdgeConneX

US operator EdgeConneX has filed plans to construct two 730,000-square-foot (67,820 sqm) data centers in Bastrop County, Texas. Named EDCAUS11 and EDCAUS12, the projects are planned for a 180-acre site at 6682 FM 535 in Cedar Creek, which the company acquired in November 2025. The parcel is...

Read more
Read EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy
EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

May 23, 2026 EdgeConneX

The government of Italy has described EdgeConneX’s €3 billion investment as being of “national strategic interest.” The EdgeConneX Campus Italia program, announced on May 14 during a council of ministers chaired by Prime Minister Giorgia Meloni, will develop three data center campuses in the...

Read more
Read EdgeConneX Begins Construction on a New Data Center in Osaka, Japan
EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

March 19, 2026 EdgeConneX

EdgeConneX has begun construction on a new data center outside Osaka, Japan. The company announced this week that it is developing its first 200MW, AI-ready campus in Greater Osaka in partnership with Kagoya Asset Management.The Kyotanabe campus will cover 130,000 sqm (1.4 million sq ft), with...

Read more
Read EdgeConneX Partners with Ral Estate Firm Stockland
EdgeConneX Partners with Ral Estate Firm Stockland

EdgeConneX Partners with Ral Estate Firm Stockland

September 16, 2025 EdgeConneX

ASX-listed real estate firm Stockland announced it had formed an exclusive arrangement with EdgeConneX to establish a partnership to develop, own, and operate a data center portfolio, and was “exploring opportunities across Stockland’s logistics pipeline.”This partnership will combine...

Read more
Read EdgeConneX to Develop Second Facility in Japan
EdgeConneX to Develop Second Facility in Japan

EdgeConneX to Develop Second Facility in Japan

August 28, 2025 EdgeConneX

Data center firm EdgeConneX this week announced the acquisition of its second data center site in the Greater Osaka and Yawata areas of Japan. The new site will provide an additional 150MW upon completion, bringing EdgeConneX's total data center capacity in Japan to 350MW of utility power at full...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?