| Distance | Site | About |
|---|---|---|
| 0.01 miles | ScaleMatrix Houston |
The Scalematrix site can expand by an additional 15,000 Square Feet
|
| 0.01 miles | LOGIX Primewest Pkw |
The site was operated by Alpheus before Logix acquired it in January 2018.
|
| 0.83 miles | Skybox Houston One |
Skybox is built to withstand them all with a 6″ concrete roof deck able to sustain winds up to 190+ mph.
The Skybox Houston Campus is fed by a large loop-fed 300 MVA substation.
|
| 0.88 miles | Element Critical Houston One |
Element Critical acquired the facility from Skybox Datacenters in March 2022 for an undisclosed amount. The site was expanded with new halls in September 2022.
|
| 0.91 miles | Element Critical: Houston One Bldg-2 |
Expansion is underway at Element Critical’s Houston One campus. The provider is adding a state-of-the-art, high-density data hall spanning 20,000 sq ft to its existing footprint.
|
| 11.54 miles | DataCanopy: Houston, TX | |
| 11.59 miles | Databank Westway Park III |
At full build the site will offer up to 640,000 square feet of data center shell with 450,000sqft of raised floor. The first phase is approximately 320,000 square feet of shell.
|
| 11.80 miles | DataBank Westway Park II |
|
| 11.90 miles | DataBank Westway Park I |
DataBank’s HOU1 data center is located on on the Westway Park Campus, 20 mins west of downtown Houston, just off Beltway 8 between I-10 and 290
|
| 12.97 miles | Prescott Realty Group-5959 Corporate | |
| 13.17 miles | Lumen: Houston 5 |
|
| 13.88 miles | Windstream: Sugar Land, TX |
A switch and data center facility that serves as an interconnected transmission site for routing telecommunication traffic across the network.
|
| 14.77 miles | Iozera: Houston, TX |
Iozera has acquired an operational enterprise data center in Houston, Texas, with plans to transform it into a cutting-edge, AI-ready multi-tenant hub capable of hosting Nvidia Blackwell GPUs.
|
| 16.46 miles | ViVaVerse: Viva Center |
Lone Star PACE and Nuveen Green Capital have secured $40 million in clean energy financing to transform the historic Compaq Computer campus in Houston into an AI data center.
|
| 16.85 miles | Serverfarm: HTX2 |
The proposed 565,000 sq ft (52,490 sqm) facility will be located next to the company's existing data center.
|
| 17.04 miles | Serverfarm: Houston HTX1 |
In 2024, Serverfarm acquired two data centers in Houston, Texas. The HTX1 data center facility spans an area of 350,000 sq ft.
|
| 17.51 miles | Serverfarm: CTX2 |
The proposed 438,000 sq ft (40,691 sqm) facility will be located next to the company's existing data centers.
|
| 17.63 miles | Serverfarm: CTX1 DC2 |
This datacenter is a part of Serverfarm's CTX1 campus in Houston, Texas.
|
| 17.71 miles | Serverfarm: Houston CTX1 |
Known as CTX1, this campus comprises two buildings strategically located near the former Compaq/HP headquarters in the Cypress Creek area.
|
| 18.06 miles | LOGIX 4635 Southwest Fwy |
The site was previously operated by Alpheus Communications before it was acquired by Logix.
|
| 18.58 miles | DataBank Houston Galleria |
The data center is conveniently located near three major business districts: Galleria, Greenway Plaza, and Downtown.
|
EdgeConneX is a data center provider specializing in providing colocation facilities to host content at the edge of the network. The company provide Space, Power & Connectivity for content, network, colocation, CDNs and service providers, as well as wireless carriers, telecommunications companies, and commercial property owners. EdgeConneX has created a new Edge for traditional networks offering superior performance and economics.
March 19, 2026
EdgeConneX
September 16, 2025
EdgeConneX
August 28, 2025
EdgeConneX
September 24, 2024
EdgeConneX
April 12, 2024
EdgeConneX
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas