EdgeConneX MIA01

Latest Podcast 2134 NW 114th Avenue Miami
Operational
Fully operational facility
Operated by:

EdgeConneX MIA01

Short Code: EDCMIA01
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Data Center Notes:


  • Customer work spaces are available
  • Raised Floor: 30"
  • EdgeConnex has rights to adjacent space to accommodate expansion.

Power:


  • Concurrently maintainable power in a minimum of an N+1 configuration to include:
    • PDU
    • UPS
    • Generators
  • Capable of 20+kW per cabinet
  • Capable of 600+ watts per sq ft
  • Real-time branch circuit monitoring

Network Providers:


CenturyLink
Comcast
FiberLight
FPL
Level 3
Windstream

Map and Nearby Locations

2134 NW 114th Avenue Miami
EdgeConneX Sites
Nearby Facilities

Sites within 15 miles of EdgeConneX MIA01

Distance Site About
0.13 miles QTS Miami
The QTS Miami data center rated to survive a category 5 hurricane, is above the 500-year flood level, and also has 3,000 sq. ft. of office space
0.25 miles RadiusDC: Miami I
The site was formerly managed by Telefonica until Nabiax acquired it in 2020. On 13 June 2023, Nabiax sold its American-based data centers to the investment fund Actis.
1.73 miles Equinix Miami MI6
2.37 miles 2300 NW 89th PI
In August 2025, Digital Realty sold its Miami data center for $8 million.
2.38 miles Aptum Miami
The site was originally a Peer 1 site before the Cogeco acquisition.
2.75 miles Metrobloks: Miami MIA-A1
The 112,900 SF facility offers customizable rack densities from 5kW to 150+kW, hybrid cooling options (air, liquid, or mixed), and modular scalability from 3MW to 12MW per hall.
2.96 miles CoreSite MI2
CoreSite's second Miami data center, a 103,000 sq ft, 4.3 MW Cat-5-hardened facility in Doral. Originally Baptist Health's enterprise data center, acquired by CoreSite in September 2022 and connected via lit fiber to MI1 to form a ~150,000 sq ft Miami campus.
3.72 miles AT&T MIA1
The AT&T Miami data center is located in Fontainebleau and next to the Mall to the Americas
8.68 miles ifx Miami
9.40 miles CoreSite Miami MI1
CoreSite’s MI1 data center in Miami provides connectivity from the U.S. to South America, as well as existing and scalable connectivity to NAP of the Americas. Built to withstand a Category 5 hurricane.
10.46 miles Iron Mountain: Miami MIA1
Located in Miami's District 12 on a 3.4-acre site, the 150,000 sq ft (13,935 sqm) facility is slated to operate on 100 percent carbon-free energy upon its 2026 launch.
11.62 miles Lumen: Miami 1 (49 Northwest 5th)
11.72 miles Lumen: Miami 2
11.72 miles NAP of the Americas - Equinix Miami MI1
Equinix has 4 data centers in the Miami area, but the MI1 site is their flagship. Not only is it the biggest Equinix facility in Flordia, but it is the best connected. Equinix acquired NOTA as well as 28 other data centers from Verizon in 2017.
11.76 miles Fiberhub MIA1
11.77 miles QuadraNet Miami
11.77 miles DataBank MIA1
Customers can utilize Zayos fiber and lit services to reach the Nap of the Americas
11.77 miles 36 NE 2nd - Digital Realty
The building is one of Miami's top interconnection points the building is home to the former Telx bMMR, Equinix MI2 which is a former Switch and Data site, and ColoHouse.
11.77 miles ColoHouse Miami
11.77 miles Equinix Miami MI2
11.97 miles Cogent: 200 SE 1st
11.98 miles Real Estate Data CenterInterested in this information?Contact us
12.06 miles Volico MIA1
12.20 miles iM Critical Miami
13.32 miles Verizon: 16583 NW 15th
13.60 miles Apotech: Miami 1
Tier III, Cat-5-rated colocation in Miami (1100 NW 163rd Dr): 47,550 sq ft commissioning Q2 2026; 1.1 MW Phase 1 scalable to 10 MW; carrier-neutral, liquid-cooling ready.
15.82 miles Edgeconnex Miami MIA02

EdgeConneX MIA01 Data Center Photos See all

Operating Company

Operated by:

EdgeConneX is a data center provider specializing in providing colocation facilities to host content at the edge of the network. The company provide Space, Power & Connectivity for content, network, colocation, CDNs and service providers, as well as wireless carriers, telecommunications companies, and commercial property owners. EdgeConneX has created a new Edge for traditional networks offering superior performance and economics.

99
Facilities
48
Markets

News See all

Read EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County
EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

June 03, 2026 EdgeConneX

US operator EdgeConneX has filed plans to construct two 730,000-square-foot (67,820 sqm) data centers in Bastrop County, Texas. Named EDCAUS11 and EDCAUS12, the projects are planned for a 180-acre site at 6682 FM 535 in Cedar Creek, which the company acquired in November 2025. The parcel is...

Read more
Read EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy
EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

May 23, 2026 EdgeConneX

The government of Italy has described EdgeConneX’s €3 billion investment as being of “national strategic interest.” The EdgeConneX Campus Italia program, announced on May 14 during a council of ministers chaired by Prime Minister Giorgia Meloni, will develop three data center campuses in the...

Read more
Read EdgeConneX Begins Construction on a New Data Center in Osaka, Japan
EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

March 19, 2026 EdgeConneX

EdgeConneX has begun construction on a new data center outside Osaka, Japan. The company announced this week that it is developing its first 200MW, AI-ready campus in Greater Osaka in partnership with Kagoya Asset Management.The Kyotanabe campus will cover 130,000 sqm (1.4 million sq ft), with...

Read more
Read EdgeConneX Partners with Ral Estate Firm Stockland
EdgeConneX Partners with Ral Estate Firm Stockland

EdgeConneX Partners with Ral Estate Firm Stockland

September 16, 2025 EdgeConneX

ASX-listed real estate firm Stockland announced it had formed an exclusive arrangement with EdgeConneX to establish a partnership to develop, own, and operate a data center portfolio, and was “exploring opportunities across Stockland’s logistics pipeline.”This partnership will combine...

Read more
Read EdgeConneX to Develop Second Facility in Japan
EdgeConneX to Develop Second Facility in Japan

EdgeConneX to Develop Second Facility in Japan

August 28, 2025 EdgeConneX

Data center firm EdgeConneX this week announced the acquisition of its second data center site in the Greater Osaka and Yawata areas of Japan. The new site will provide an additional 150MW upon completion, bringing EdgeConneX's total data center capacity in Japan to 350MW of utility power at full...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?