EdgeConneX Boston

Latest Podcast 22 Linnell Circle
Operational
Fully operational facility
Operated by:

EdgeConneX Boston

Short Code: EDCBOS01
░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Data Center Notes:


  • Customer work spaces are available
  • Raised Floor: 30"
  • EdgeConnex has rights to adjacent space to accommodate expansion.

Power:


  • Concurrently maintainable power in a minimum of an N+1 configuration to include:
    • PDU
    • UPS
    • Generators
  • Capable of 20+kW per cabinet
  • Capable of 600+ watts per sq ft
  • Real-time branch circuit monitoring

Network Providers:


CenturyLink
Comcast
Level 3
Zayo
Sago
Southern Telecom

Map and Nearby Locations

22 Linnell Circle
EdgeConneX Sites
Nearby Facilities

Sites within 15 miles of EdgeConneX Boston

Distance Site About
1.56 miles Camber: Bedford, MA
1 Story structure Flood Zone: Outside 100 and 500 Year Flood Plain Seismic Zone 2A N+2 Cooling Plant Redundancy
2.36 miles Equinix Boston BO2
Equinix acquired BO2 as well as 28 other datacenters from Verizon in 2017. It was formerly named Verizon BOS1 Billerica. Constructed in 2001 Construction Type: Slab on grade, concrete
6.33 miles Prov.net Boston North
Dedicated ½ Cabinet to Multi-cabinet Suites Diverse power feeds 750 KW Generator Redundant (A/B) Distribution
7.19 miles Markley: 90 Bolt Street
In early 2026, Jeffrey D. Markley, CEO of the Markley Group, purchased the industrial property at 90 Bolt Street alongside adjacent industrial plots for a combined $5.6 million.
7.58 miles Markley: Lowell
Markley’s data center in Lowell, MA encompasses 352,000 square feet of highly secured white and mechanical space. In addition to carriers originating at local POPs, the facility offers the benefits of three diverse dark fiber networks connected directly to Markley’s Boston location.
7.81 miles Markley: 2 Tanner Street
In early 2026, Jeffrey D. Markley, CEO of the Markley Group, purchased the retired 85-megawatt Tanner Street Generating Station and adjacent industrial parcels on Bolt Street for $5.6 million.
8.39 miles 200 Quannapowitt
The former facility was torn down in 2023.
9.10 miles 600 Winter - Digital Realty
Digital Realty full leased the building to a Triple Net tenant, Cyxtera BO1.
9.14 miles Centersquare Waltham BOS1
Datacenter operational since in 1998. 2 story building Raised Floor: 12" Utility: NSTAR
9.24 miles Equinix Boston BO1
9.39 miles 115 2nd - Digital Realty
Digital Realty full leased the building to a Triple Net tenant, Cyxtera BO3
9.39 miles Centersquare: Waltham BO3
1 Story Structure Raised Floor: 24"
11.07 miles TierPoint Andover
The site was acquired when TierPoint bought Windstream's data centers in October 2015. It was originally a PAETEC data center.
11.80 miles NaviSite Andover
12.17 miles Centersquare: Watertown BOS4
Centersquare's cloud-enabled Watertown data center is located close to the center of Boston, and only 10 miles from Boston Logan International Airport. The facility was originally built in 2002 and then expanded in 2008 to add space, power, and cooling capacity.
12.29 miles Expedient Boston
13.44 miles Cogent: Somerville
13.49 miles Evocative Somerville BOS1
Datacenter built in 2009 and expanded in 2013 Two (2) Story structure
13.59 miles Internap Boston
Although Internap is a carrier, the company operates a "carrier neutral" data center. There are a half dozen networks in the site, plus more via the CoreSite Meet-Me-Room
13.59 miles FirstLight Somerville
Located less than one mile from I-93 on the Boston/Somerville line and at the intersection of multiple redundant fiber networks, ColoSpace Somerville offers a combination of convenience to downtown Boston and Cambridge
13.59 miles CoreSite Somerville BO1
13.59 miles AXCELX Somerville
13.59 miles Tierpoint Charleston
Located on the Hood Park campus, TierPoint’s Charlestown data center is a short walk from the Sullivan Square MBTA station located near I-93.
13.72 miles Verizon: Cambridge 89 Fulkerson
Former XO Communications site
13.85 miles Lumen Cambridge 1 (300 Bent)
14.23 miles Lumen Boston (1 Main)
14.25 miles MicroLink: Boston, MA
MicroLink is planning to build a data center in Boston, Massachusetts.
15.39 miles Crown Castle One Summer
Markley One Sumer is the landlord for Lightower at this site.
15.39 miles DataBank BOS1
15.39 miles Verizon: One Summer
Markley One Sumer is the landlord for Verizon at this site.
15.42 miles Lumen Boston 1
15.42 miles Markley: One Summer Street
Markley's One Summer Street is Boston's carrier hotel. The building is the largest multi-tenant telecommunications facility in New England. Home to over 90 different carriers and network providers, One Summer offers clients unlimited bandwidth, high-density connectivity, unsurpassed infrastructure, abundant and reliable power, and true network diversity
15.69 miles 105 Cabot - Digital Realty
3 Story Structure Flood Zone: Outside 100 and 500 Year Flood Plain Seismic Zone 2A
15.76 miles 128 1ST - Digital Realty
Originally built by a telecom company in 2000, this facility has 13 MW of critical IT load that serves a total of 18 customers who are primarily internet based, financial services, and healthcare related companies.
16.24 miles Dynamic Internet Salem

EdgeConneX Boston Data Center Photos See all

Boston Metro: Average Power Rates
Source: JLL

Operating Company

Operated by:

EdgeConneX is a data center provider specializing in providing colocation facilities to host content at the edge of the network. The company provide Space, Power & Connectivity for content, network, colocation, CDNs and service providers, as well as wireless carriers, telecommunications companies, and commercial property owners. EdgeConneX has created a new Edge for traditional networks offering superior performance and economics.

99
Facilities
48
Markets

News See all

Read EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County
EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

June 03, 2026 EdgeConneX

US operator EdgeConneX has filed plans to construct two 730,000-square-foot (67,820 sqm) data centers in Bastrop County, Texas. Named EDCAUS11 and EDCAUS12, the projects are planned for a 180-acre site at 6682 FM 535 in Cedar Creek, which the company acquired in November 2025. The parcel is...

Read more
Read EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy
EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

May 23, 2026 EdgeConneX

The government of Italy has described EdgeConneX’s €3 billion investment as being of “national strategic interest.” The EdgeConneX Campus Italia program, announced on May 14 during a council of ministers chaired by Prime Minister Giorgia Meloni, will develop three data center campuses in the...

Read more
Read EdgeConneX Begins Construction on a New Data Center in Osaka, Japan
EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

March 19, 2026 EdgeConneX

EdgeConneX has begun construction on a new data center outside Osaka, Japan. The company announced this week that it is developing its first 200MW, AI-ready campus in Greater Osaka in partnership with Kagoya Asset Management.The Kyotanabe campus will cover 130,000 sqm (1.4 million sq ft), with...

Read more
Read EdgeConneX Partners with Ral Estate Firm Stockland
EdgeConneX Partners with Ral Estate Firm Stockland

EdgeConneX Partners with Ral Estate Firm Stockland

September 16, 2025 EdgeConneX

ASX-listed real estate firm Stockland announced it had formed an exclusive arrangement with EdgeConneX to establish a partnership to develop, own, and operate a data center portfolio, and was “exploring opportunities across Stockland’s logistics pipeline.”This partnership will combine...

Read more
Read EdgeConneX to Develop Second Facility in Japan
EdgeConneX to Develop Second Facility in Japan

EdgeConneX to Develop Second Facility in Japan

August 28, 2025 EdgeConneX

Data center firm EdgeConneX this week announced the acquisition of its second data center site in the Greater Osaka and Yawata areas of Japan. The new site will provide an additional 150MW upon completion, bringing EdgeConneX's total data center capacity in Japan to 350MW of utility power at full...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your