EdgeConneX Denver

Latest Podcast 8535 Highfield Parkway
Operational
Fully operational facility
Operated by:

EdgeConneX Denver

Short Code: EDCDEN01
░░░░ Request Dataset MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

DEN01:

  • 8535 Highfield Pkwy, Bldg.3, Suite 500/600, Englewood, CO 80112
  • 9,800 sq ft facility
  • 2 current Data Halls totaling 9,300 sq ft of raised floor for tenant racks

DEN02:

  • 8451 Highfield Pkwy, Englewood, CO 80112
  • 115,500 sq ft facility, all space controlled by EdgeConneX; 5 planned 10,400 sq ft Data Halls

Data Center Notes:


  • Customer work spaces are available
  • Raised Floor: 30"
  • EdgeConnex has rights to adjacent space to accommodate expansion.

Power:


  • Concurrently maintainable power in a minimum of an N+1 configuration to include:
    • PDU
    • UPS
    • Generators
  • Capable of 20+kW per cabinet
  • Capable of 600+ watts per sq ft
  • Real-time branch circuit monitoring

Network Providers:


Level 3
tw telecom
XO
Zayo
Comcast
AT&T
CenturyLink
Integra
Windstream

Map and Nearby Locations

8535 Highfield Parkway
EdgeConneX Sites
Nearby Facilities

Sites within 15 miles of EdgeConneX Denver

Distance Site About
0.22 miles 8534 Concord - Digital Realty
Digital Realty has leased out the building to Cyxtera's DN3 site.
0.22 miles Centersquare: Denver DEN2
0.34 miles US Signal Denver CO01
The Denver One Neck data center was built in 2015 at a cost of $20 million. Phase I provides 35,000 Square Feet, but facility can be built out to 160,000 Square Feet over 5 phases.
0.48 miles Flexential: Parker, CO
Flexential is building its fifth data center in Denver, in the southern district of Parker.
0.65 miles Flexential Englewood
The Englewood site is also known as Flexential's Compark Data Center. Englewood is Flexential's largest site in Denver.
0.68 miles TerraCom Direct Denver
TerraCom Direct's Denver Colorado site is located in the ViaWest Compark Data Center Complex.
1.63 miles Expedient Centennial
1.65 miles Equinix Denver DE2
Equinix acquired DE2 in Englewood as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon DEN1.
1.90 miles Verizon: 313 Inverness
The site is a previous XO Communications facility
1.90 miles Comcast Centennial
2.14 miles DataBank Englewood (DEN1)
2.27 miles DataBank Centennial II (DEN5)
2.35 miles DataBank Centennial (DEN2)
The site at 6900 South Peoria Street in Centennial, CO is air-containment optimized and has a reflective white roof that prevents solar heat from entering the building. Inside, energy efficient “green” cooling solutions are engineered to achieve an industry-leading PUE of 1.3.
2.45 miles Flexential Denver (Arapahoe)
3.17 miles Charter Communications National Center West
3.21 miles Equinix Denver DE1
This site is a former Switch and Data site before Equinix acquired S&D in 2010.
3.22 miles Aphorio Carter: Centennial, CO
In 2024, Aphorio Carter Critical Infrastructure Fund, LLC acquired the fully leased Centennial Data Center in Centennial, Colorado for approximately $7.3 million.
3.22 miles Verizon: 9706 Easter
5.24 miles H5 Denver
The data center campus sits on more than 12-acres in the Denver Tech Center and is comprised of four buildings totaling nearly 300,000 square feet.
7.02 miles Flexential Aurora (Cornell)
15,000 kVA UPS system capacity Redundant battery strings with monitoring Branch Circuit Monitoring
7.02 miles 11900 E Cornell
The Digital site is fully leased to Flexential
8.27 miles Lumen Denver 5
9.06 miles Visa Central US Denver
11.04 miles Centersquare: Denver DEN1
12.84 miles DataCanopy: Denver
Located in the heart of Denver, the HOSTING N+1 data center is housed in a historic Ford Model T factory.
12.99 miles Lumen Aurora 1
13.02 miles JP Morgan Aurora
13.33 miles QTS: Denver DC3
This facility is part of QTS' Denver Campus in Colorado.
13.41 miles QTS: Denver DC2
This facility is part of QTS' Denver Campus in Colorado.
13.54 miles QTS: Denver Campus
The campus, also known as QTS Aurora, on 80 acres, will consist of four buildings and is projected to ramp up to capacity over 10 years.
14.32 miles 365 Aurora, CO
Purpose-built by SunGard Availability Services in 2001 as DEN-3431; 150,000 sqft single-tenant facility now in 365's portfolio.
15.08 miles CoreSite DE2
This is the legacy Comfluent Denver 2 site that is adjacent to the Level 3's Denver gateway site
15.10 miles Lumen Denver 1 (1850 North Pearl)
15.54 miles Handy Networks Denver
Handy Networks is centrally located Denver, Colorado and operates their own private, fully redundant data center with 24×7, 100% US based technical support.
15.57 miles Flexential Denver (Champa)
15.57 miles DataBank Denver DEN3
15.57 miles 1500 Champa
In 2022, RadiusDC acquired the 1500 Champa building located in Denver, Colorado. 1500 Champa is a three-story building with approximately 138,000 square feet of data center and office space.
15.60 miles CoreSite Denver DE1
Acquired from Comfluent, data center has the acted as the defacto building Meet-Me Room until 910Telecom set up its own MMR.
15.60 miles RockyNet Denver
15.60 miles Lumen Denver 2 & 3
15.60 miles VLEC Denver
15.60 miles Denver Gas & Electric Building (910 15th)
Built in 1910, the Denver Gas & Electric Building (DGEB) at 910 15th is Denver's Carrier Hotel.
16.08 miles 501 Wazee
900 kVA UPS system capacity Redundant battery strings Multiple redundant power distribution paths Branch Circuit Monitoring System
16.65 miles Vantage: Colorado CO21
Vantage Data Centers purchased 143 acres of land in Aurora to develop a five-building campus.
16.67 miles Vantage: CO2 Expansion
16.74 miles Iron Mountain DEN-1
Iron Mountain acquired the building from Fortrust in July 2017 for $130 million.
17.14 miles CoreSite: DE3 DC2
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
17.16 miles CoreSite: Denver DE3
Located adjacent to the new National Western Stock Show development in Denver, this campus expansion is anticipated to have an on-site substation
17.20 miles CoreSite: DE3 DC3
This planned facility is part of CoreSite's Denver DE3 Campus in Denver.
17.88 miles American Tower: Denver
18.04 miles CoreInterested in this information?Contact us
Microsoft has bought an undeveloped piece of land directly south of Denali Logistics Park. The 420-acre logistics and industrial park, has the ability to develop buildings that are up to 1.1 million square feet in size and can build up to 6 million in square feet total.
18.17 miles Hyde: HighPoint Elevated
Initially designed for logistics, HighPoint Elevated is also perfectly data-center-primed.
19.07 miles Carrier-Neutral Data CenterInterested in this information?Contact us
19.52 miles Colorado Colo

EdgeConneX Denver Data Center Photos See all

Outside of Edgeconnex Denver
Source: Baxtel

Operating Company

Operated by:

EdgeConneX is a data center provider specializing in providing colocation facilities to host content at the edge of the network. The company provide Space, Power & Connectivity for content, network, colocation, CDNs and service providers, as well as wireless carriers, telecommunications companies, and commercial property owners. EdgeConneX has created a new Edge for traditional networks offering superior performance and economics.

99
Facilities
48
Markets

News See all

Read EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County
EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

June 03, 2026 EdgeConneX

US operator EdgeConneX has filed plans to construct two 730,000-square-foot (67,820 sqm) data centers in Bastrop County, Texas. Named EDCAUS11 and EDCAUS12, the projects are planned for a 180-acre site at 6682 FM 535 in Cedar Creek, which the company acquired in November 2025. The parcel is...

Read more
Read EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy
EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

May 23, 2026 EdgeConneX

The government of Italy has described EdgeConneX’s €3 billion investment as being of “national strategic interest.” The EdgeConneX Campus Italia program, announced on May 14 during a council of ministers chaired by Prime Minister Giorgia Meloni, will develop three data center campuses in the...

Read more
Read Denver City Council Approves a One-year Moratorium on Data Centers
Denver City Council Approves a One-year Moratorium on Data Centers

Denver City Council Approves a One-year Moratorium on Data Centers

May 20, 2026 Denver

Denver City Council voted Monday to approve a one-year moratorium on new data center developments. The measure temporarily halts the acceptance, processing, and approval of zoning permits, site development plans, and amendment applications related to data centers. However, the moratorium excludes...

Read more
Read EdgeConneX Begins Construction on a New Data Center in Osaka, Japan
EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

March 19, 2026 EdgeConneX

EdgeConneX has begun construction on a new data center outside Osaka, Japan. The company announced this week that it is developing its first 200MW, AI-ready campus in Greater Osaka in partnership with Kagoya Asset Management.The Kyotanabe campus will cover 130,000 sqm (1.4 million sq ft), with...

Read more
Read EdgeConneX Partners with Ral Estate Firm Stockland
EdgeConneX Partners with Ral Estate Firm Stockland

EdgeConneX Partners with Ral Estate Firm Stockland

September 16, 2025 EdgeConneX

ASX-listed real estate firm Stockland announced it had formed an exclusive arrangement with EdgeConneX to establish a partnership to develop, own, and operate a data center portfolio, and was “exploring opportunities across Stockland’s logistics pipeline.”This partnership will combine...

Read more
Read More News