Year Built: 2022
Lot Size: 19 acres

Sites on this Campus:

░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. The 18.5-acre hyperscale campus is strategically positioned at the convergence of multiple metro. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.

Power

  • Uninterruptable Power Supply
  • Dual substation service, 170 MW total capacity
  • Low utility cost: $0.057/kWh (subject to change)

Network Carriers

  • AT&T
  • Zayo
  • Cogent
  • Crown Castle
  • PacketFabric
  • Comcast

Compliance

  • System and Organization Control (SOC) 2 Type 2 and SOC 1 Type 2
  • PCI DSS, HIPAA, HITECH, NIST 800-53, ISO 27001:2013

Map and Nearby Locations:

505 Northwest Ave
Aligned Sites
Nearby Facilities

Sites within 15 miles of Aligned Chicago ORD-01

Distance Site About
0.06 miles Aligned ORD-02
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
0.48 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
0.55 miles Hyperscale Data Center Request Dataset
1.41 miles T5: Chicago lll
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
3.04 miles Digital Realty: ORD15
In 2017, Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
3.13 miles Digital Realty: Franklin Park Expansion
Digital Realty acquired two land parcels near their existing Franklin Park campus in separate transactions on July 2025, for a total of approximately $18 million.
3.13 miles Digital Realty: ORD13
3.15 miles Digital Realty: Chicago ORD12
3.18 miles Digital Realty: ORD14
3.18 miles Tierpoint Chicago West
3.21 miles Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
4.13 miles Verizon: Swift Dr
4.13 miles DataBank (ORD4) Oak Brook
4.13 miles LexusNexis Oak Brook
4.78 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
4.79 miles US Signal Oakbrook IL01
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
4.79 miles Verizon: (Oak Brook)
4.84 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
4.90 miles NYI Chicago (Oak Brook)
4.94 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
5.00 miles CyrusOne: Wood Dale CHI6
CyrusOne is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
5.08 miles Lumen Broadview
5.83 miles Centersquare: Chicago ORD2
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
5.97 miles 2299 Busse (CH2) Digital Realty
6.03 miles Rackspace Elk Grove ORD1
6.05 miles Deft: Elk Grove DF-CH1
6.05 miles Digital Elk Grove Village Campus
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
6.05 miles HostPapa CH1
Formerly known as "ColoCrossing CH1"
6.08 miles 1450 E Devon Ave (CH3) DRT
6.09 miles 2200 Busse Rd (CH1) DRT
6.27 miles DigiCo: Chicago
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
6.27 miles EdgeConneX CHI01
6.28 miles Stream Chicago II
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
6.34 miles EdgeConneX: CHI03
EdgeConneX CHI03 is a new 167,000-square-foot, two-story data center building on its Elkgrove campus near Chicago.
6.34 miles EdgeConneX CHI02
6.36 miles TA Realty: Elk Grove
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
6.36 miles Equinix: CH5
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
6.36 miles Equinix Chicago CH3
6.41 miles Stream Chicago I
Free-Standing, Data Center Designed to Tier III Standards
6.48 miles Digital Fortress: Chicago Lombard
6.48 miles 360TCS-Lombard
6.82 miles Hyperscale Data Center Request Dataset
6.82 miles T5: Chicago V
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
6.86 miles NTT: Chicago CH4
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
6.88 miles STACK Chicago CHI01
6.88 miles NTT: CH3
This facility is a part of NTT's Chicago data center campus in Illinois.
6.90 miles NTT: Chicago CH5
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
6.92 miles NTT Chicago CH1
NTT acquired its Chicago site in 2018 through its RagingWire subsidiary. Launched in 2021, the first two-story data center, CH1, spans 126,000 sq ft (11,705 sqm) of data floor space.
6.94 miles STACK CHI01B
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
6.94 miles Iron Mountain Chicago
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
6.97 miles NTT: CH2
This facility is a part of NTT's Chicago data center campus in Illinois.
7.04 miles Stream: Chicago III DC3
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
7.11 miles Stream: Chicago III DC2
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
7.23 miles Stream: Chicago III
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
7.24 miles Stack: CHI02
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
7.29 miles CyrusOne: Lombard CHI5
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
7.54 miles Equinix Chicago CH7
7.90 miles Prime Elk Grove
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
7.95 miles Prime: ORD01-02
Building B will be another three-story construction, offering 279,360 gross square feet of space.
7.98 miles Prime: ORD01-03
Building C will be another three-story construction, offering 294,429 gross square feet of space.
8.09 miles Hyperscale Data Center Request Dataset
The 37-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
8.13 miles T5 Chicago II
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
8.15 miles Hyperscale Data Center Request Dataset
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
8.23 miles Hyperscale Data Center Request Dataset
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
8.34 miles CenturyLink: Arlington Heights
8.55 miles CloudHQ: Mount Prospect ORD2
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
8.62 miles CloudHQ: Mount Prospect ORD1
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
8.68 miles CloudHQ Mount Prospect ORD3
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
8.91 miles Nexstar: Elk Grove Bldg 3
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
8.96 miles Aligned: ORD-04
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
8.99 miles Nexstar: Elk Grove Bldg 2
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
8.99 miles Aligned: ORD-03
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
9.08 miles Nexstar: Elk Grove
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
9.10 miles Nexstar: Elk Grove Bldg 4
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
10.18 miles Connect Data Centers: Chicago
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
10.77 miles CloudCenters: Lisle, IL
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
11.31 miles DataBank ORD3 Mount Prospect
11.31 miles Colocation America CH3
11.40 miles Apotech: Illinois 1
Apotech Group operates its Illiois 1 data center facility in the Chicago market, situated at 1331 E Business Center Drive. This facility is a retrofitted structure, encompassing 32,000 square feet of space.
11.93 miles Centersquare: Lisle CHI1
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
12.58 miles Complete Source Schaumburg
12.62 miles Karis: Naperville, IL
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
12.93 miles Metro Edge: Illinois Medical District (IMD)
Commercial real estate investment firm Metro Edge Development is building a data center in Chicago, Illinois.
13.64 miles QTS: Chicago 3
QTS plans to build another data center building on its Chicago Campus.
13.72 miles QTS: Chicago 2
QTS is developing 366,000 sq ft (34,000 sqm) of data center space across three stories, alongside 80,000 sq ft (7,432 sqm) of office and loading areas in its Chicago Campus.
13.75 miles QTS: Chicago Campus
The campus was a former Sun Times Press Facility and was acquired in 2014
13.93 miles Cogent Naperville
14.05 miles Lumen Chicago 2
14.12 miles Lumen Chicago 4
14.39 miles TierPoint Chicago Polk
14.41 miles First Communications Chicago
14.43 miles EXA - 111 North Canal
Former GTT suite
14.43 miles Lumen Chicago 1
14.56 miles DataBank (ORD2) 840 S Canal
14.56 miles Server Farm Realty 840 South Canal
4 MW Critical Load on Each Floor (Floors 1-5) 130-160 Watts per Raised Floor SF
14.59 miles Lumen Chicago 6
14.64 miles CoreSite Chicago CH2
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
14.73 miles Lumen Chicago 3
14.75 miles Cogent: 216 W Jackson
14.87 miles Netrality Chicago: 717 S Wells
The 10 story building was constructed in 1923 and eventually was converted into a data center.
14.88 miles Crown Castle 725 S Wells
14.88 miles 725 S Wells - 1547 Critical Systems
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
14.88 miles Legacy: Chicago Byte Exchange CBE1
An affiliate of real estate firm Prime Group bought an office building in Chicago from options exchange company Cboe Global Markets for $12 million.
14.92 miles QuadraNet Chicago
14.92 miles CoreSite Chicago CH1
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
14.92 miles Cogent: 427 S LaSalle
14.92 miles 365 Chicago
The site is a former Switch and Data site (also owned by Equinix for a short period.)
14.97 miles Verizon: 140 S Dearborn
15.02 miles Cogent: 600 S Federal
15.02 miles Colocation America CH2
15.02 miles Lumen Chicago 5
15.02 miles Digital Realty: Chicago ORD11
15.02 miles DataBank (ORD1) 600 S Federal
15.78 miles Hyperscale Data Center Request Dataset
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
15.91 miles Centersquare: Chicago ORD1(B, C & D)
Digital Realty Trust owns the building at 350 Cermak and is CTL's Landlord.
15.91 miles Digital Realty: ORD10
Digital Realty acquired the colocation services business of Hivelocity in 2025.
15.91 miles Colocation America CH1
15.91 miles Steadfast Chicago 350 E Cermak
15.91 miles Centersquare: Chicago ORD1
Centersquare's ORD1 site is located in the heart of the Chicago Financial District on the 7th floor of an 8-story building on a fiber-linked campus.
15.91 miles Equinix Chicago CH1, CH2, & CH4
Equinix distinctly separates CH1, CH2, and CH4 into separate data centers, but in reality, the sites are in the same building.
15.92 miles Deft: Downtown CH1
15.94 miles Hyperscale Data Center Request Dataset
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
15.96 miles Hyperscale Data Center Request Dataset
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
15.97 miles NetSource Chicago
16.02 miles Hyperscale Data Center Request Dataset
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
16.56 miles Summit: Naperville
17.17 miles 1547 Chicago Midway Technology Centre
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
17.26 miles SBA Edge: 603 Discovery
Former New Continuum site that was acquired in 2019
18.15 miles Karis: Hoffman Estates Campus
Karis Critical purchased 180 acres of land in the Hoffman Estates area from 5a7 for $45 million.
18.20 miles Edged Energy: Aurora ORD01
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
18.26 miles 4267 Meridian Pkwy: Lincoln Rackhouse
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
18.27 miles DataBridge: Aurora, IL
DataBridge Sites is the new name for ESite Systems, a company with two decades of history in the industry.
18.28 miles Karis: Hoffman 2
This planned facility would be part of Karis Critical's Hoffman Estates Campus in Chicago, Illinois.
18.37 miles Edged Energy: Chicago ORD03
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
18.37 miles Edged Energy: Chicago ORD02
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
18.50 miles Crypto Mining Data Center Request Dataset
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
18.58 miles CyrusOne: Aurora III (CHI3)
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
18.61 miles CyrusOne Chicago Aurora CME
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
18.63 miles DataCanopy: Chicago, IL
18.66 miles CyrusOne: Aurora CHI2
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
18.69 miles CyrusOne: CHI3 DC2
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
18.83 miles CyrusOne: CHI2 DC2
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
19.24 miles Compass Hoffman Estates
Located in Cook County, the campus will feature five buildings and represents a total planned investment of $10 billion.

Aligned Chicago ORD-01 Data Center Photos (See all)

Rendering of Aligned Chicago Data Center
Source: Baxtel

Operating Company

Operated by:

Aligned Data Centers is an infrastructure technology company that offers colocation and build-to-scale solutions to cloud, enterprise, and managed service providers.

In early 2022, Aligned Energy was rebranded to Aligned Data Centers.

36
Facilities
3
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?