Year Built: 1999
Floors: 8
Ownership: Digital Realty Trust owns the real estate.
░░░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░░ Request Dataset MW
Operational Power

The massive building at 350 East Cermak Road in Chicago is one of the biggest carrier hotels in the world. Digital Realty acquired the colocation services business of Hivelocity in 2025. The facility was previously billed as ‘the world’s largest data center’ by DCK around 2009. The site is an unusual confluence of two Interconnection ecosystems, Internet Exchange and Financial Exchange. The two ecosystems create significant demand for space in the building and therefore available colocation space is limited and pricing is higher.

350 Ceremak is served by an industrial strength infrastructure that includes four fiber vaults and three electric power feeds that provide more than 100 megawatts of energy. The building is currently the second-largest power customer for Commonwealth Edison, trailing only Chicago’s O’Hare Airport. More than 50 generators throughout the building and multiple 30,000-gallon tanks of diesel fuel support grid power and keep it running through the most adverse conditions.

Picture of 350 E Cermak:

350 E CermakOutside of Cermak

350 E Cermak Tenants and Colocation Providers

The building's Meet-Me Room is on the 2nd floor (formerly operated by Telx before the DRT acquisition.) Other datacenters in the building are listed in the table below.

Datacenter Floor Suite
AMS-IX Suite 120
CME Suite 120
Building MMR 2nd Suite 250
Atlantic Metro Suite 240
Steadfast Suite 240
Server Central Suite 500
Equinix CH1 5th Enter via Suite 650
Equinix CH2 6th Suite 650
Equinix CH4 8th Floor
Colocation America Suite 8

Cermak Chicago Expansion Plans

350 Cermak is as popular as it is large. The Chicago Fintech and Internet Interconnection all want space in a building that is near capacity. Over the years plans have been put forward to build a data center nearby, but none has come to fruition.

History

Originally the building was a printing plant for R.R. Donnelley & Sons Co. Built in 1912 was formerly known as the Lakeside Press building. It was designated a Chicago Landmark in 2004.

Map and Nearby Locations

350 East Cermak Road
Digital Realty Trust Sites
Nearby Facilities

Digital Realty: ORD10 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Digital Realty: ORD10

Distance Site
0.00 miles Equinix Chicago CH1, CH2, & CH4
0.00 miles Colocation America CH1
0.00 miles Centersquare: Chicago ORD1
0.00 miles Steadfast Chicago 350 E Cermak
0.02 miles Deft: Downtown CH1
0.03 miles Centersquare: Chicago ORD1(B, C & D)
1.30 miles CoreSite Chicago CH2
1.50 miles 725 S Wells - 1547 Critical Systems
1.50 miles Crown Castle 725 S Wells
1.50 miles Hivelocity: Chicago ORD3
1.52 miles Netrality Chicago: 717 S Wells
1.53 miles Cogent: 600 S Federal
1.53 miles Colocation America CH2
1.53 miles Lumen Chicago 5
1.53 miles Digital Realty: Chicago ORD11
1.53 miles DataBank (ORD1) 600 S Federal
1.62 miles Server Farm Realty 840 South Canal
1.62 miles DataBank (ORD2) 840 S Canal
1.66 miles Cogent: 427 S LaSalle
1.66 miles 365 Chicago
1.66 miles CoreSite Chicago CH1
1.68 miles QuadraNet Chicago
1.71 miles Legacy: Chicago Byte Exchange CBE1
1.75 miles First Communications Chicago
1.77 miles TierPoint Chicago Polk
1.88 miles Cogent: 216 W Jackson
1.88 miles Verizon: 140 S Dearborn
1.99 miles Igor Gabal: Chicago, IL
2.25 miles Lumen Chicago 6
2.33 miles EXA - 111 North Canal
2.33 miles Lumen Chicago 1
2.34 miles Lumen Chicago 3
2.61 miles QTS: CHI1 DC2
2.68 miles QTS: CHI1 DC1
2.72 miles QTS: CHI1 DC3
2.95 miles H5: Chicago
2.98 miles Metro Edge: Illinois Medical District (IMD)
3.24 miles Lumen Chicago 4
3.39 miles Lumen Chicago 2
4.09 miles 1547 Chicago Midway Technology Centre
8.78 miles Related Digital: South Work 1
8.81 miles Related Digital: South Works Expansion
11.33 miles Digital Crossroad (Indiana NAP)
11.49 miles CoreWeave: Hammond, IN
11.49 miles Digital Crossroad: Hammond, IN (Phase 2)
12.35 miles Lumen Broadview
13.31 miles Digital Realty: Franklin Park Expansion
13.32 miles Tierpoint Chicago West
13.40 miles Digital Realty: ORD14
13.40 miles Digital Realty: ORD13
13.42 miles Digital Realty: ORD12
13.54 miles Digital Realty: ORD15
14.72 miles Robbins Resource Recovery Center
15.57 miles DataBank (ORD4) Oak Brook
15.57 miles Verizon: Swift Dr
15.57 miles LexusNexis Oak Brook
15.77 miles 505 N Railroad Ave - Digital Realty
15.91 miles Aligned: ORD-01
15.93 miles Aligned: ORD-02
16.14 miles Station GammaInterested in this information?Contact us
16.29 miles T5: Chicago lll
16.54 miles Server Farm Oak Brook
16.54 miles US Signal Oakbrook IL01
16.54 miles Verizon: (Oak Brook)
16.66 miles NYI Chicago (Oak Brook)
17.30 miles Iron Mountain Chicago
18.47 miles Equinix Chicago CH7
19.45 miles TA Realty: Elk Grove
19.65 miles Carrier-Neutral Data CenterInterested in this information?Contact us
19.69 miles Element Critical CH1
19.71 miles Element Critical CH2
19.77 miles T5: Chicago V
19.87 miles EdgeConneX CHI01
19.88 miles Centersquare: Chicago ORD2
19.91 miles EdgeConneX: CHI03
19.97 miles EdgeConneX CHI02
19.98 miles Stream Chicago I
19.98 miles 2299 Busse (CH2) Digital Realty

Digital Realty: ORD10 Data Center Photos See all

Outside of 350 E Cermak
Source: Baxtel
Rendering of DRT's planned 12-story Data Center at 330 East Cermak
Source: Digital Realty Trust
First Floor Layout
Source: Baxtel

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Rolling Meadows Approves Digital Realty's 156MW Data Center Campus
Rolling Meadows backed a tax incentive on Nov. 24 for Digital Realty's 156MW data center, over objections from residents who packed the council chambers. Councilors voted 4-2 to support a Cook Coun...

Rolling Meadows Approves Digital Realty's 156MW Data Center Campus

November 25, 2026 Digital Realty Trust

Rolling Meadows backed a tax incentive on Nov. 24 for Digital Realty's 156MW data center, over objections from residents who packed the council chambers. Councilors voted 4-2 to support a Cook County Class 6b tax break for the project at 3800 Golf Road, CBS Chicago reported. The council also...

Read more
Read Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake
[Goodman Group](https://baxtel.com/data-centers/goodman-group) and [Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) moved to buy up to 9.9% of Australian operator [NEXTDC](htt...

Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake

November 05, 2026 NEXTDC

Goodman Group and Digital Realty moved to buy up to 9.9% of Australian operator NEXTDC at a 45.5% premium to the previous close. The buyers offered A$9.50 a share through an aftermarket bookbuild, a purchase Reuters valued at about A$715 million (US$501 million) after reviewing the term sheet....

Read more
Read Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) wants to build its first [Indiana](https://baxtel.com/regions/indiana) data centers in Kokomo, proposing a three-building camp...

Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana

October 17, 2026 Digital Realty Trust

Digital Realty wants to build its first Indiana data centers in Kokomo, proposing a three-building campus with roughly 1GW of IT capacity on 476 acres of greenfield land. The global REIT published a project page for the development after city officials confirmed its interest earlier this month,...

Read more
Read Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site...

Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

October 16, 2026 Digital Realty Trust

Digital Realty is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site plan that calls for roughly 1GW of IT capacity and completion in 2033. The company published the details on its Kokomo project page, and Kokomo Mayor Tyler...

Read more
Read Digital Realty Completes Structural Topping-Out of Second Seoul Data Center
Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027.

“The topping out isn't just a constr...

Digital Realty Completes Structural Topping-Out of Second Seoul Data Center

October 15, 2026 Digital Realty Trust

Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027. “The topping out isn't just a construction milestone; it's a powerful symbol of what happens when incredible teams come together to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.