CloudHQ Mount Prospect ORD3

1200 E Algonquin Rd

Operated by:

CloudHQ plans to build three, 566,000-square-foot data centers, along with a new ComEd substation to power them. The first building is expected to be complete by 2024, with the remainder of the work finished by 2027.

Map and Nearby Locations:

1200 E Algonquin Rd
Click Map to begin Search

Sites within 15 miles of CloudHQ Mount Prospect ORD3

Show SqM
Distance Site About
0.12 miles CenturyLink: Arlington Heights
0.83 miles Prime Elk Grove
1.26 miles T5 Chicago II
1.90 miles STACK Chicago CHI01
1.92 miles STACK CHI01B
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
2.08 miles Stream Chicago I
2.17 miles EdgeConneX CHI02
2.19 miles Equinix Chicago CH3
2.19 miles CoreWeave: US Central ORD1
2.21 miles Edgeconnex Chicago Campus
The first Chicago site was leaked to the press in Oct 2016. Microsoft is expected to be the anchor tenant with the site supporting up to 25-30 MWs.
2.22 miles EdgeConneX CHI01
2.34 miles Stream Chicago II
2.68 miles 2299 Busse (CH2) Digital Realty
2.70 miles Digital Elk Grove Village Campus
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
2.70 miles ColoCrossing CH1
2.70 miles ServerCentral CH1
2.70 miles Rackspace Elk Grove ORD1
2.70 miles 2200 Busse Rd (CH1) DRT
2.73 miles 1450 E Devon Ave (CH3) DRT
2.81 miles Cyxtera Elk Grove CH3
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
2.95 miles Skybox Chicago I
3.41 miles Colocation America CH3
3.41 miles DataBank ORD3 Mount Prospect
3.97 miles Iron Mountain Chicago
Iron Mountain is planning a (but not yet constructed facility in Chicago.)
4.00 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
4.00 miles NTT: 1250 N Arlington Heights (Planned)
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building
4.04 miles NTT: 1200 N Arlington Heights (Planned)
Expansion site acquired in November 2023.
4.18 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
4.34 miles NTT Chicago CH1
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
6.21 miles Complete Source Schaumburg
7.89 miles Microsoft Chicago Northlake
8.11 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
8.44 miles Aligned Chicago ORD-01
8.49 miles Aligned ORD-02
8.50 miles T5 Northlake IL
8.64 miles Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
8.66 miles 9377 Grand Ave
8.69 miles 9355 Grand Ave
8.75 miles 9333 Grand Ave (DRT)
8.75 miles SingleHop Chicago
8.77 miles Tierpoint Chicago West
9.84 miles Microsoft Hoffman Estates 1
9.86 miles Microsoft Hoffman Estates 2
12.47 miles LexusNexis Oak Brook
12.47 miles XO (Swift Dr)
12.47 miles DataBank (ORD4) Oak Brook
12.90 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
12.90 miles XO: (Oak Brook)
12.90 miles US Signal Oakbrook
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
12.98 miles NYI Chicago (Oak Brook)
13.06 miles 360TCS-Lombard
13.06 miles Digital Fortress: Chicago Lombard
13.23 miles Lumen Broadview
13.29 miles CyrusOne Chicago Lombard
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
14.19 miles Compass Hoffman Estates
15.25 miles Equinix Chicago CH7
15.25 miles Verizon Chicago (Downers Grove)
17.51 miles Evoque Lisle CH1
18.32 miles Lumen Chicago 2
18.41 miles Metro Edge: Illinois Medical District (IMD)
18.44 miles Lumen Chicago 4
18.66 miles Cogent Naperville
18.70 miles New Continuum: 603 Discovery
19.10 miles GTT - 111 North Canal
19.10 miles Lumen Chicago 1
19.23 miles Lumen Chicago 6
19.28 miles Lumen Chicago 3
19.40 miles TierPoint Chicago Polk
19.42 miles First Communications Chicago
19.52 miles Cogent: 216 W Jackson
19.56 miles DataBank (ORD2) 840 S Canal
19.56 miles Server Farm Realty 840 South Canal
4 MW Critical Load on Each Floor (Floors 1-5) 130-160 Watts per Raised Floor SF
19.66 miles XO: 140 S Dearborn
19.69 miles QTS Chicago
The campus was a former Sun Times Press Facility and was acquired in 2014
19.73 miles QuadraNet Chicago
19.73 miles Cogent: 427 S LaSalle
19.73 miles CoreSite Chicago CH1
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
19.73 miles 365 Chicago
The site is a former Switch and Data site (also owned by Equinix for a short period.)
19.73 miles InfoRelay Chicago
19.77 miles NetSource Chicago
19.77 miles Netrality Chicago: 717 S Wells
The 10 story building was constructed in 1923 and eventually was converted into a data center.
19.77 miles GTT - 717 South Wells
19.78 miles Atlantic Metro ORD3
19.78 miles Steadfast Chicago 725 Wells
19.78 miles Colo@ Chicago
19.78 miles Crown Castle 725 S Wells
19.79 miles 725 S Wells - 1547 Critical Systems
1547 Acquired the site in December of 2018.
19.86 miles Cogent: 600 S Federal
19.86 miles Colocation America CH2
19.86 miles Lumen Chicago 5
19.86 miles 600 S Federal - Digital Realty
19.86 miles CoreSite Chicago CH2
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.

CloudHQ Mount Prospect ORD3 Data Center Photos

Operating Company

CloudHQ designs, builds and operates mission critical data centers delivered through a tailored, customer service focused platform designed to foster long-term relationships. CloudHQ provides 100% availability with high-density power, flexible configurations and carrier-neutral connectivity. Founded by Hossein Fateh, a pioneer of data center REITs and former CEO of DFT, and bolstered by a team of industry veterans, all with one purpose – to provide flexible solutions in high efficient space and resilient design for businesses of all sizes.

14 Facilities Owned
5 Markets Served
206.4 Megawatts
View Company

News

Read More News