9 MW of critical capacity
Both a 1.5MW and a 2MW transformer
|
3.05 miles | Verizon Chicago (Downers Grove) |
|
3.05 miles | Equinix Chicago CH7 |
|
3.40 miles | NYI Chicago (Oak Brook) | |
3.51 miles | US Signal Oakbrook |
800a 480V 3 phase
450kW diesel generator with 24 hour run time at full load
500kVa UPS capacity with battery backup
|
3.51 miles | XO: (Oak Brook) | |
3.51 miles | Server Farm Oak Brook |
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
|
4.48 miles | LexusNexis Oak Brook | |
4.48 miles | XO (Swift Dr) |
|
4.48 miles | DataBank (ORD4) Oak Brook |
|
5.49 miles | Evoque Lisle CH1 |
|
6.44 miles | Aligned ORD-02 |
|
6.48 miles | Aligned Chicago ORD-01 | |
6.79 miles | Microsoft Chicago Northlake |
|
6.95 miles | 505 N Railroad Ave - Digital Realty |
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
7.48 miles | T5 Northlake IL | |
7.67 miles | Cogent Naperville | |
7.70 miles | Lumen Broadview | |
8.89 miles | Element Critical CH2 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
9.07 miles | Element Critical CH1 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
9.38 miles | 9333 Grand Ave (DRT) | |
9.38 miles | SingleHop Chicago | |
9.40 miles | 9355 Grand Ave | |
9.43 miles | Tierpoint Chicago West | |
9.46 miles | 9377 Grand Ave | |
9.50 miles | Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty |
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
|
9.63 miles | NTT Chicago CH1 |
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
|
9.71 miles | NTT: 1200 N Arlington Heights (Planned) |
Expansion site acquired in November 2023.
|
9.76 miles | NTT: 1250 N Arlington Heights (Planned) |
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building
|
9.99 miles | NetSource Chicago | |
10.17 miles | Skybox Chicago I | |
10.28 miles | Cyxtera Elk Grove CH3 |
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
|
10.33 miles | 1450 E Devon Ave (CH3) DRT | |
10.36 miles | 2200 Busse Rd (CH1) DRT | |
10.36 miles | Rackspace Elk Grove ORD1 | |
10.36 miles | Digital Elk Grove Village Campus |
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
|
10.36 miles | ColoCrossing CH1 |
|
10.36 miles | ServerCentral CH1 |
|
10.40 miles | 2299 Busse (CH2) Digital Realty |
|
10.73 miles | Stream Chicago II | |
10.91 miles | Equinix Chicago CH3 |
|
10.93 miles | CoreWeave: US Central ORD1 | |
10.93 miles | EdgeConneX CHI01 | |
10.94 miles | Edgeconnex Chicago Campus |
The first Chicago site was leaked to the press in Oct 2016. Microsoft is expected to be the anchor tenant with the site supporting up to 25-30 MWs.
|
10.95 miles | EdgeConneX CHI02 | |
11.05 miles | Stream Chicago I |
|
11.17 miles | STACK Chicago CHI01 |
|
11.18 miles | STACK Chicago CHI02 | |
11.99 miles | 4267 Meridian Pkwy: Lincoln Rackhouse |
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
|
12.25 miles | T5 Chicago II | |
12.31 miles | Prime Elk Grove | |
12.57 miles | New Continuum: 603 Discovery | |
12.63 miles | CyrusOne Chicago Aurora CME |
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
|
12.94 miles | CenturyLink: Arlington Heights | |
12.95 miles | Iron Mountain Chicago |
Iron Mountain is planning a (but not yet constructed facility in Chicago.)
|
13.06 miles | CloudHQ Mount Prospect ORD3 |
|
14.71 miles | Complete Source Schaumburg | |
16.40 miles | Colocation America CH3 | |
16.40 miles | DataBank ORD3 Mount Prospect |
|
16.96 miles | Microsoft Hoffman Estates 2 | |
17.10 miles | Metro Edge: Illinois Medical District (IMD) | |
17.19 miles | Microsoft Hoffman Estates 1 | |
17.50 miles | QTS Chicago |
The campus was a former Sun Times Press Facility and was acquired in 2014
|
18.84 miles | TierPoint Chicago Polk |
|
18.85 miles | First Communications Chicago | |
18.90 miles | CoreSite Chicago CH2 |
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
|
18.98 miles | Server Farm Realty 840 South Canal |
4 MW Critical Load on Each Floor (Floors 1-5)
130-160 Watts per Raised Floor SF
|
18.98 miles | DataBank (ORD2) 840 S Canal |
|
19.00 miles | Lumen Chicago 2 | |
19.04 miles | Lumen Chicago 4 | |
19.11 miles | GTT - 111 North Canal | |
19.11 miles | Lumen Chicago 1 |
|
19.13 miles | Compass Hoffman Estates | |
19.26 miles | Lumen Chicago 6 |
|
19.32 miles | Cogent: 216 W Jackson | |
19.34 miles | Atlantic Metro ORD3 | |
19.34 miles | Steadfast Chicago 725 Wells |
|
19.34 miles | Colo@ Chicago |
|
19.34 miles | Crown Castle 725 S Wells |
|
19.34 miles | 725 S Wells - 1547 Critical Systems |
1547 Acquired the site in December of 2018.
|
19.35 miles | GTT - 717 South Wells | |
19.35 miles | Netrality Chicago: 717 S Wells |
The 10 story building was constructed in 1923 and eventually was converted into a data center.
|
19.45 miles | Lumen Chicago 3 |
|
19.45 miles | CoreSite Chicago CH1 |
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
|
19.45 miles | Cogent: 427 S LaSalle | |
19.45 miles | InfoRelay Chicago | |
19.45 miles | 365 Chicago |
The site is a former Switch and Data site (also owned by Equinix for a short period.)
|
19.46 miles | QuadraNet Chicago | |
19.52 miles | Lumen Chicago 5 | |
19.52 miles | Cogent: 600 S Federal | |
19.52 miles | Colocation America CH2 | |
19.53 miles | 600 S Federal - Digital Realty | |
19.57 miles | XO: 140 S Dearborn |
360TCS, LLC is a provider of enterprise level colocation and data center services located in the Chicago suburbs.