CoreWeave: US Central ORD1

Operational
Fully operational facility
Operated by:

CoreWeave: US Central ORD1

Map and Nearby Locations

Elk Grove
CoreWeave Sites
Nearby Facilities

Sites within 15 miles of CoreWeave: US Central ORD1

Distance Site About
0.30 miles Stack: CHI01B
Two-story data center at 1301 Touhy Avenue, built by STACK next to CHI01A on the same parcel, with four data halls and diverse underground ComEd feeds.
0.36 miles Stack: CHI01A
Single-story data center at 1441 Touhy Avenue in Elk Grove Village. Forsythe Technology broke ground on it in 2014, T5 bought it in 2016, and IPI Partners made it part of STACK. It adjoins CHI01B on a shared 14-acre parcel.
0.70 miles Stream Chicago II
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
0.72 miles 1400 E Devon Ave (CH3) DRT
0.74 miles 2200 Busse Rd (CH1) DRT
0.76 miles DigiCo: Chicago
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
0.78 miles Deft: Elk Grove DF-CH1
0.78 miles HostPapa CH1
Formerly known as "ColoCrossing CH1"
0.79 miles Rackspace Elk Grove ORD1
0.81 miles Equinix Chicago CH3
Equinix CH3 is a three-story colocation data center at 1905 Lunt Avenue in Elk Grove Village, Illinois, that Equinix opened in 2007 and expanded in five more phases through 2020.
0.85 miles EdgeConneX: CHI04
CHI04 is a two-story, 164,000 sq ft EdgeConneX data center under construction at 901 Busse Road in Elk Grove Village, Illinois, near O'Hare Airport.
0.87 miles Equinix: CH5
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
0.91 miles 2299 Busse (CH2) Digital Realty
0.93 miles EdgeConneX CHI02
0.94 miles EdgeConneX: CHI05
CHI05 is EdgeConneX's planned second data center on Busse Road in Elk Grove Village, Illinois, on the parcel next to CHI04.
0.96 miles Stream Chicago I
Free-Standing, Data Center Designed to Tier III Standards
1.01 miles EdgeConneX: CHI03
EdgeConneX CHI03 is a new 167,000 sq ft, two-story data center building on its Elk Grove Village campus near Chicago.
1.03 miles EdgeConneX CHI01
CHI01 is EdgeConneX's first Chicago data center, a 132,000 sq ft retrofit at 1800 Nicholas Blvd in Elk Grove Village, Illinois.
1.04 miles Centersquare: Chicago ORD2
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
1.04 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.09 miles Stack: CHI02
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
1.10 miles Stream: Chicago ORDC2
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
1.13 miles Stream: Chicago ORDC3
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
1.34 miles StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.34 miles T5 Chicago II
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
1.39 miles Prime: ORD01-01
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
1.40 miles Prime: ORD01-02
Building B will be another three-story construction, offering 279,360 gross square feet of space.
1.41 miles East PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.47 miles Prime: ORD01-03
Building C will be another three-story construction, offering 294,429 gross square feet of space.
1.48 miles Hub ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.61 miles T5: Chicago V
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
1.64 miles TA Realty: Elk Grove
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
1.85 miles NTT: Chicago CH5
CH5 is a planned three-story data center on the former Marino Court subdivision east of Arlington Heights Road, the fifth and final building on NTT's Itasca campus.
1.86 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.98 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
2.04 miles NTT: Chicago CH4
CH4 is a planned data center at 1200 N. Arlington Heights Road on NTT's Itasca campus, on the site of two office buildings NTT bought and cleared.
2.07 miles CenturyLink: Arlington Heights
2.13 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
2.15 miles NTT: Chicago CH2
CH2 is a two-story data center at 275 Pierce Road on NTT's Itasca campus in Itasca, Illinois, with six data halls.
2.17 miles Aligned: ORD-04
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
2.18 miles Aligned: ORD-03
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
2.19 miles NTT: Chicago CH1
The first building on NTT's Itasca campus: a two-story data center at 255 Pierce Road with six data vaults and four primary 34.5 kV ComEd feeds plus one alternate.
2.26 miles NTT: Chicago CH3
CH3 is a data center under construction at 235 Pierce Road on NTT's Itasca campus in Itasca, Illinois, with four data vaults.
2.28 miles CloudHQ: ORD1
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
2.32 miles CloudHQ: ORD2
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
2.42 miles CloudHQ: ORD3
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
3.25 miles Nexstar: Elk Grove Bldg3
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
3.36 miles Nexstar: Elk Grove Bldg2
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
3.41 miles Nexstar: Elk Grove Bldg4
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
3.46 miles Nexstar: Elk Grove Bldg1
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
4.60 miles Iron Mountain Chicago
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
5.57 miles T5: Chicago lll
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
5.60 miles DataBank ORD3 Mount Prospect
5.60 miles Colocation America CH3
5.86 miles Apotech: Illinois 1
Apotech Group operates its Illiois 1 data center facility in the Chicago market, situated at 1331 E Business Center Drive. This facility is a retrofitted structure, encompassing 32,000 square feet of space.
6.23 miles West TowerInterested in this information?Contact us
6.23 miles Complete Source Schaumburg
6.57 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
6.82 miles Aligned: ORD-01
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
6.85 miles Aligned: ORD-02
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
7.63 miles Digital Realty: ORD15
In 2017, Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
7.72 miles Digital Realty: ORD12
7.74 miles Digital Realty: ORD14
7.76 miles Digital Realty: ORD13
7.84 miles Tierpoint Chicago West
7.88 miles Digital Realty: Franklin Park Expansion
Digital Realty acquired two land parcels near their existing Franklin Park campus in separate transactions on July 2025, for a total of approximately $18 million.
9.84 miles Connect Data Centers: Chicago
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
9.86 miles East ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.94 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.96 miles Park GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.99 miles Prime StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.68 miles LexusNexis Oak Brook
10.68 miles DataBank (ORD4) Oak Brook
10.68 miles Verizon: Swift Dr
10.92 miles Digital Fortress: Chicago Lombard
10.93 miles 360TCS-Lombard
11.00 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
11.01 miles US Signal Oakbrook IL01
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
11.01 miles Verizon: (Oak Brook)
11.08 miles NYI Chicago (Oak Brook)
11.12 miles CyrusOne: Lombard CHI5
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
11.82 miles Lumen Broadview
12.60 miles Karis: Hoffman Estates Campus
Karis Critical and site owner Hoffman Estates Holdings officially withdrew their rezoning application for the proposed data center project in Hoffman Estates, Illinois, in June 2026, putting all active approvals on hold.
13.22 miles Equinix Chicago CH7
Equinix CH7 is a single-story colocation data center at 111 Plaza Drive in Westmont, Illinois, built in 1999 and acquired from Verizon, where it was ORD1, in 2017.
13.86 miles Compass Hoffman Estates
Located in Cook County, the campus will feature five buildings and represents a total planned investment of $10 billion.
14.77 miles CloudCenters: Lisle, IL
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
15.05 miles Brennan Investment: Barrington, IL
The Brennan Investment Group has officially withdrawn its ambitious plans for a $2 billion data center project in Barrington Hills, a village located roughly 40 miles northwest of Chicago, Illinois.
15.32 miles Centersquare: Lisle CHI1
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
15.40 miles Karis: Naperville, IL
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
15.42 miles WhiteRose: South Elgin, IL
Whiterose Partners LLC is proposing a 200,000-square-foot data center on nine acres in South Elgin, Illinois, located roughly 40 miles west of Chicago.
16.13 miles Colovore: West Chicago ORD02
ORD02 is Colovore's second Chicago-area facility, located in West Chicago and extending the company's distributed footprint across the metro. The liquid-cooled, HVDC-ready site is under construction and pre-leasing for edge AI and high-performance colocation workloads.
16.27 miles Karis: Naperville (INEOS)
Real estate developer Karis Critical is in early-stage exploratory discussions to potentially acquire the 168-acre former BP/INEOS campus at in Naperville, Illinois, within the Suburban Chicago market.
16.48 miles Cogent Naperville
16.60 miles MicroLink: Chicago, IL
MicroLink is planning to build a data center in Chicago, Illinois.
16.83 miles SBA Edge: 603 Discovery
Former New Continuum site that was acquired in 2019
17.65 miles NetSource Chicago
18.01 miles Metro Edge: Illinois Medical District (IMD)
Commercial real estate investment firm Metro Edge Development is building a data center in Chicago, Illinois.
18.05 miles H5: Chicago
18.24 miles Lumen Chicago 2
18.35 miles Lumen Chicago 4
18.35 miles Hut 8: Batavia, IL
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
18.92 miles EXA - 111 North Canal
Former GTT suite
18.92 miles Lumen Chicago 1
19.03 miles QTS: CHI1 DC3
QTS plans to build another data center building on its Chicago Campus.
19.07 miles Lumen Chicago 6
19.10 miles QTS: CHI1 DC2
QTS is developing 366,000 sq ft (34,000 sqm) of data center space across three stories, alongside 80,000 sq ft (7,432 sqm) of office and loading areas in its Chicago Campus.
19.14 miles TierPoint Chicago Polk
19.14 miles Lumen Chicago 3
19.16 miles First Communications Chicago
19.16 miles QTS: CHI1 DC1
The campus was a former Sun Times Press Facility and was acquired in 2014
19.22 miles Igor Gabal: Chicago, IL
Local real estate developer Igor Gabal in partnership with Strategic Value Partners, is advancing a project to convert a portion of the historic 300 West Adams Building in downtown Chicago into a data center.
19.30 miles DataBank (ORD2) 840 S Canal
19.30 miles Server Farm Realty 840 South Canal
4 MW Critical Load on Each Floor (Floors 1-5) 130-160 Watts per Raised Floor SF
19.32 miles Cogent: 216 W Jackson
19.46 miles Edged Energy: Aurora ORD01
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
19.49 miles Legacy: Chicago Byte Exchange CBE1
An affiliate of real estate firm Prime Group bought an office building in Chicago from options exchange company Cboe Global Markets for $12 million.
19.49 miles Verizon: 140 S Dearborn
19.53 miles QuadraNet Chicago
19.53 miles CoreSite Chicago CH1
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
19.53 miles Cogent: 427 S LaSalle
19.53 miles 365 Chicago
The site is a former Switch and Data site (also owned by Equinix for a short period.)
19.55 miles CoreSite Chicago CH2
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
19.55 miles Netrality Chicago: 717 S Wells
The 10 story building was constructed in 1923 and eventually was converted into a data center.
19.56 miles Crown Castle 725 S Wells
19.56 miles 725 S Wells - 1547 Critical Systems
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
19.63 miles Edged Energy: Chicago ORD02
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
19.65 miles Colocation America CH2
19.65 miles Lumen Chicago 5
19.65 miles Cogent: 600 S Federal
19.65 miles Digital Realty: Chicago ORD11
19.65 miles DataBank (ORD1) 600 S Federal
19.67 miles Edged Energy: Chicago ORD03
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
19.86 miles CyrusOne: CHI3 DC1
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
19.86 miles Summit: Naperville
19.97 miles CyrusOne: CHI3 DC2
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.

Operating Company

Operated by:

CoreWeave is a specialized cloud provider, delivering a massive scale of GPU compute resources.

An NVIDIA Elite Cloud Solutions Provider for Compute and Visualization, CoreWeave builds cloud solutions for compute intensive use cases - VFX and Rendering, Machine Learning and AI, Batch Processing, and Pixel Streaming.

0
Facilities
0
Markets

News See all

Read CoreWeave Enters India With 240MW AdaniConneX Lease In Navi Mumbai
CoreWeave will lease 240MW of data center capacity in Navi Mumbai from AdaniConneX, marking the AI cloud provider's first deployment in India. The companies [announced the plan](https://www.corewea...

CoreWeave Enters India With 240MW AdaniConneX Lease In Navi Mumbai

October 08, 2026 CoreWeave

CoreWeave will lease 240MW of data center capacity in Navi Mumbai from AdaniConneX, marking the AI cloud provider's first deployment in India. The companies announced the plan on October 6, with the first phase due online in the middle of 2028. CoreWeave (Nasdaq: CRWV) takes the whole of three...

Read more
Read CoreWeave To Develop 360MW Data Center Capacity In Indonesia
CoreWeave is expanding into Indonesia with plans to develop three data centers, marking its first entry into the Asia-Pacific region. Scheduled to launch in 2028, the facilities will provide a comb...

CoreWeave To Develop 360MW Data Center Capacity In Indonesia

August 04, 2026 CoreWeave

CoreWeave is expanding into Indonesia with plans to develop three data centers, marking its first entry into the Asia-Pacific region. Scheduled to launch in 2028, the facilities will provide a combined 360MW of IT capacity, with CoreWeave owning and operating the compute infrastructure while...

Read more
Read CoreWeave Anchors Phase 1 of eStruxture's 90 MW Calgary CAL-3
CoreWeave Anchors Phase 1 of eStruxture's 90 MW Calgary CAL-3

CoreWeave Anchors Phase 1 of eStruxture's 90 MW Calgary CAL-3

May 17, 2026 eStruxture: CAL-3

eStruxture has signed CoreWeave as the anchor tenant for Phase 1 of CAL-3, its 90 MW AI-ready data center in Rocky View County just outside Calgary, eStruxture announced on May 14. The Tier III facility is the largest data center under construction in Alberta and is targeted for commercial...

Read more
Read Poolside Pursues New Partners for Texas Data Center Following CoreWeave Deal Breakdown
Poolside Pursues New Partners for Texas Data Center Following CoreWeave Deal Breakdown

Poolside Pursues New Partners for Texas Data Center Following CoreWeave Deal Breakdown

April 04, 2026 CoreWeave

AI startup Poolside is in discussions with cloud providers, including Google, as it looks to secure a new partner for its Texas data center project. The talks follow the collapse of Poolside’s previous agreement with CoreWeave for the development.CoreWeave and Poolside reached an agreement in...

Read more
Read Nvidia Invests Another $2bn in CoreWeave
Nvidia Invests Another $2bn in CoreWeave

Nvidia Invests Another $2bn in CoreWeave

January 29, 2026 CoreWeave

Nvidia has invested another $2 billion in AI cloud provider CoreWeave. The investment aims to help CoreWeave speed up its build-out of more than 5GW of AI capacity by 2030, and will also see Nvidia giving the neocloud access to the upcoming Vera chip - Nvidia's latest CPU.Nvidia's CEO, Jensen...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?