4267 Meridian Pkwy: Lincoln Rackhouse

4267 Meridian Pkwy

░░░░░░ Login to view SqFt Total Building Size

░░░░░░ Login to view SqFt Gross Colocation Size

░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.

Building:


  • Building Name: CHI1
  • Utility Power Feeds: Capacity 6MW
  • Parking: 121 spaces
  • Number of Stories: One (1)
  • Loading Docks: One (1)
  • Raised Floor Area: 33,513 ft2
  • Number of Computer Rooms: One (1)
  • Raised Floor Height: 36 in.
  • Raised Floor to Ceiling Height: 11 ft
  • Slab to Slab: 24 ft

Network Providers:


  • ATT
  • Sprint
  • Comcast
  • OnLight Fiber

Map and Nearby Locations:

4267 Meridian Pkwy
Click Map to begin Search

Sites within 15 miles of 4267 Meridian Pkwy: Lincoln Rackhouse

Show SqM
Distance Site About
2.16 miles CyrusOne Chicago Aurora CME
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
2.21 miles CyrusOne: Aurora CHI2
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
2.22 miles CyrusOne: CHI2 Bldg 2
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
2.58 miles Edged Energy: Chicago ORD02
The new data center campus, known as Aurora TechPark, facility will offer 100 MW of capacity built to handle dense AI-driven workloads on their way to transforming the IT industry.
2.59 miles Edged Energy: Chicago ORD03
The new data center campus, known as Aurora TechPark, facility will offer 100 MW of capacity built to handle dense AI-driven workloads on their way to transforming the IT industry.
2.60 miles CyrusOne: Bilter Road campus
CyrusOne plans to develop a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
2.61 miles CyrusOne: Bilter Rd Bldg 2
CyrusOne plans to develop a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
2.78 miles Edged Energy: Aurora, Chicago
The new data center campus, known as Aurora TechPark, facility will offer 100 MW of capacity built to handle dense AI-driven workloads on their way to transforming the IT industry.
2.90 miles NetSource Chicago
4.34 miles Cogent Naperville
6.63 miles Centersquare: Lisle CHI1
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
7.36 miles New Continuum: 603 Discovery
11.02 miles CyrusOne Chicago Lombard
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
11.99 miles 360TCS-Lombard
11.99 miles Digital Fortress: Chicago Lombard
12.89 miles Equinix Chicago CH7
15.04 miles NYI Chicago (Oak Brook)
15.17 miles US Signal Oakbrook
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
15.18 miles Verizon: (Oak Brook)
15.18 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
16.26 miles LexusNexis Oak Brook
16.26 miles Verizon: Swift Dr
16.26 miles DataBank (ORD4) Oak Brook
18.20 miles Aligned ORD-02
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus, ORD-02 offers exceptional connectivity at the convergence of over 12 metro/long-haul networks. At full build, ORD-02 building will provide 36MW of critical load capacity expandable to ~52 MW.
18.26 miles Aligned Chicago ORD-01
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
18.27 miles NTT Chicago CH1
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
18.47 miles Microsoft Chicago Northlake
18.54 miles NTT: 1200 N Arlington Heights (Planned)
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
18.58 miles NTT: 1250 N Arlington Heights (Planned)
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
18.70 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
18.95 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
19.09 miles T5 Northlake IL
T5 Data Center is expanding its footprint in Chicago. T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 300,000 sq ft facility for multi-tenant or single-tenant operations.
19.13 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
19.33 miles Lumen Broadview
19.72 miles Skybox Chicago I

4267 Meridian Pkwy: Lincoln Rackhouse Data Center Photos


Lincoln Rackhouse Aurora Facility

Operating Company

Founded in 1965, Lincoln Property Company is a manager of residential and commercial properties.

Lincoln Rackhouse is the data center division of Lincoln Property Company.

9 Facilities Owned
7 Markets Served
77.1 Megawatts