4267 Meridian Pkwy: Lincoln Rackhouse

Latest Podcast
4267 Meridian Pkwy
Operational
Fully operational facility
Operated by:

4267 Meridian Pkwy: Lincoln Rackhouse

Sites leasing space from Lincoln Property Company:

░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.

Building:


  • Building Name: CHI1
  • Utility Power Feeds: Capacity 6MW
  • Parking: 121 spaces
  • Number of Stories: One (1)
  • Loading Docks: One (1)
  • Raised Floor Area: 33,513 ft2
  • Number of Computer Rooms: One (1)
  • Raised Floor Height: 36 in.
  • Raised Floor to Ceiling Height: 11 ft
  • Slab to Slab: 24 ft

Network Providers:


  • ATT
  • Sprint
  • Comcast
  • OnLight Fiber

Map and Nearby Locations:

4267 Meridian Pkwy
Lincoln Property Company Sites
Nearby Facilities

Sites within 15 miles of 4267 Meridian Pkwy: Lincoln Rackhouse

Distance Site About
0.01 miles DataBridge: Aurora, IL
DataBridge Sites is the new name for ESite Systems, a company with two decades of history in the industry.
2.16 miles CyrusOne Chicago Aurora CME
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
2.19 miles DataCanopy: Chicago, IL
2.21 miles CyrusOne: Aurora CHI2
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
2.22 miles CyrusOne: CHI2 DC2
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
2.54 miles Edged Energy: Chicago ORD03
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
2.60 miles CyrusOne: Aurora III (CHI3)
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
2.61 miles CyrusOne: CHI3 DC2
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
2.67 miles Edged Energy: Chicago ORD02
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
2.70 miles Edged Energy: Aurora ORD01
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
2.90 miles NetSource Chicago
3.59 miles Summit: Naperville
4.34 miles Cogent Naperville
5.37 miles Colovore: Chicago
Colovore is developing a liquid-cooled colocation data center in Chicago, Illinois, with construction expected to be completed in the fourth quarter of 2026.
5.67 miles Karis: Naperville, IL
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
6.55 miles Crypto Mining Data Center Request Dataset
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
6.63 miles Centersquare: Lisle CHI1
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
7.36 miles SBA Edge: 603 Discovery
Former New Continuum site that was acquired in 2019
8.20 miles CloudCenters: Lisle, IL
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
10.91 miles Connect Data Centers: Chicago
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
11.02 miles CyrusOne: Lombard CHI5
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
11.99 miles 360TCS-Lombard
11.99 miles Digital Fortress: Chicago Lombard
12.89 miles Equinix Chicago CH7
13.96 miles Project Cardinal
Pioneer Development, LLC has filed an application for Project Cardinal, a sprawling data center campus planned for over 1,000 acres in Yorkville, Kendall County.
14.25 miles Project Cardinal Expansion
14.30 miles Prologis: Project Steel
Project Steel involves developing a 540-acre campus featuring 24 two-story data center buildings, totaling over 9 million square feet (836,125 sqm), along with three substations.
14.37 miles Prologis: Project Steel Expansion
14.74 miles CyrusOne: Yorkville 8
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
14.78 miles CyrusOne: Yorkville 9
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
14.88 miles CyrusOne: Yorkville 7
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
14.92 miles CyrusOne: Yorkville 6
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
15.02 miles CyrusOne: Yorkville 5
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
15.04 miles NYI Chicago (Oak Brook)
15.12 miles Hyperscale Data Center Request Dataset
Microsoft acquired 500 acres of land around Eldamain and Corneils roads from three landowners in Plano, Illinois.
15.14 miles CyrusOne: Yorkville 4
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
15.18 miles Verizon: (Oak Brook)
15.18 miles US Signal Oakbrook IL01
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
15.18 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
15.20 miles CyrusOne: Yorkville 3
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
15.25 miles CyrusOne: Yorkville 2
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
15.38 miles CyrusOne: Yorkville Campus
CyrusOne is building a huge data center campus on 228 acres in Kendall County outside of Chicago, Illinois. The data center campus will have up to nine (9) two-story buildings and a centralized 800,000-square-foot electric substation.
16.26 miles LexusNexis Oak Brook
16.26 miles Verizon: Swift Dr
16.26 miles DataBank (ORD4) Oak Brook
16.85 miles Savion: Plano, Illinois
Savion, the company developing the massive 250MW Plano Skies Energy Center solar project in Kendall County, Illinois, is now proposing to add a large data center campus to the development.
17.16 miles Savion: Plano Expansion
18.20 miles Aligned ORD-02
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
18.26 miles Aligned Chicago ORD-01
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
18.32 miles NTT: CH3
This facility is a part of NTT's Chicago data center campus in Illinois.
18.41 miles NTT Chicago CH1
NTT acquired its Chicago site in 2018 through its RagingWire subsidiary. Launched in 2021, the first two-story data center, CH1, spans 126,000 sq ft (11,705 sqm) of data floor space.
18.46 miles NTT: CH2
This facility is a part of NTT's Chicago data center campus in Illinois.
18.47 miles Hyperscale Data Center Request Dataset
18.54 miles NTT: Chicago CH4
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
18.58 miles NTT: Chicago CH5
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
18.70 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
18.85 miles Nexstar: Elk Grove
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
18.86 miles Nexstar: Elk Grove Bldg 2
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
18.92 miles Nexstar: Elk Grove Bldg 3
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
18.95 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
18.96 miles Nexstar: Elk Grove Bldg 4
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
19.09 miles T5: Chicago lll
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
19.13 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
19.31 miles CyrusOne: Wood Dale CHI6
CyrusOne is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
19.33 miles Lumen Broadview
19.72 miles DigiCo: Chicago
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.

4267 Meridian Pkwy: Lincoln Rackhouse Data Center Photos (See all)

Lincoln Rackhouse Aurora Facility
Source: Baxtel

Operating Company

Operated by:

Lincoln Property Company is a diversified real estate company that operates a data center business in the United States. The company entered the sector in 2010 by acquiring Rackhouse Group and operated the platform as Lincoln Rackhouse before retiring that brand in 2024. Its services include data center acquisitions and investments, build to suit development, and site selection, with recent transactions including facilities and land in Georgia, Arizona, and Ohio. In 2019 Lincoln Rackhouse expanded into colocation operations through the acquisition of Bytegrid in partnership with Principal Real Estate Investors.

Lincoln Property Company History:

  • November 2025: Re-acquired a data center at 2500 W. Frye Road in Chandler, Arizona.
  • 2024: Retired the Lincoln Rackhouse brand for its data center business.
  • December 2024: Acquired an operational data center in Alpharetta, Georgia.
  • May 2022: Formed a joint venture with Harrison Street to acquire 190 acres in New Albany, Ohio for a technology and distribution park targeted to data center and industrial users.
  • May 2019: Acquired Bytegrid’s three-market portfolio and colocation operations in partnership with Principal Real Estate Investors.
  • October 2018: CBRE was engaged to manage operations across a one million square foot data center portfolio acquired by Lincoln Rackhouse.
  • September 2010: Acquired Rackhouse Group; rebranded the platform as Lincoln Rackhouse.
  • 1965: Founded in Dallas, Texas.
10
Facilities
3
Markets
123MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?