Prime: ORD01-03

Latest Podcast 1501 Midway Ct
Planned
Future facility in planning stage
Operated by:

Prime: ORD01-03

Short Code: Bldg C
Year Planned: 2027
PUE: 1.25
Utility Provider: ComEd
Floors: 2

Building C will be another three-story construction, offering 294,429 gross square feet of space.

Map and Nearby Locations

1501 Midway Ct
Prime Data Centers Sites
Nearby Facilities

Prime: ORD01-03 Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Prime: ORD01-03

Distance Site About
0.08 miles Prime Elk Grove
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
0.10 miles Prime: ORD01-02
Building B will be another three-story construction, offering 279,360 gross square feet of space.
0.52 miles EastInterested in this information?Contact us
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
0.56 miles Metro StationInterested in this information?Contact us
The 37-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
0.57 miles North HubInterested in this information?Contact us
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
0.63 miles CenturyLink: Arlington Heights
0.70 miles T5 Chicago II
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
0.74 miles Stack: CHI02
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
0.81 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
0.81 miles CloudHQ: Mount Prospect ORD1
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
0.87 miles CloudHQ: Mount Prospect ORD2
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
0.94 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
0.96 miles CloudHQ Mount Prospect ORD3
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
1.01 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
1.20 miles Aligned: ORD-04
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
1.21 miles STACK CHI01B
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
1.22 miles STACK Chicago CHI01
1.31 miles Aligned: ORD-03
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
1.43 miles T5: Chicago V
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
1.47 miles CoreWeave: US Central ORD1
1.57 miles Stream Chicago I
Free-Standing, Data Center Designed to Tier III Standards
1.62 miles Equinix: CH5
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
1.62 miles Equinix Chicago CH3
1.64 miles EdgeConneX CHI02
1.64 miles EdgeConneX: CHI03
EdgeConneX CHI03 is a new 167,000-square-foot, two-story data center building on its Elkgrove campus near Chicago.
1.71 miles EdgeConneX CHI01
1.74 miles Stream Chicago II
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
1.82 miles TA Realty: Elk Grove
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
2.01 miles 2200 Busse Rd (CH1) DRT
2.06 miles Digital Elk Grove Village Campus
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
2.06 miles Deft: Elk Grove DF-CH1
2.06 miles HostPapa CH1
Formerly known as "ColoCrossing CH1"
2.07 miles Rackspace Elk Grove ORD1
2.07 miles 2299 Busse (CH2) Digital Realty
2.08 miles 1450 E Devon Ave (CH3) DRT
2.21 miles Centersquare: Chicago ORD2
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
2.24 miles DigiCo: Chicago
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
3.22 miles Carrier-Neutral Data CenterInterested in this information?Contact us
CyrusOne is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
3.26 miles NTT: Chicago CH5
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
3.29 miles NTT: Chicago CH4
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
3.36 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
3.38 miles NTT: CH2
This facility is a part of NTT's Chicago data center campus in Illinois.
3.43 miles NTT Chicago CH1
NTT acquired its Chicago site in 2018 through its RagingWire subsidiary. Launched in 2021, the first two-story data center, CH1, spans 126,000 sq ft (11,705 sqm) of data floor space.
3.52 miles NTT: CH3
This facility is a part of NTT's Chicago data center campus in Illinois.
3.53 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
3.82 miles Nexstar: Elk Grove Bldg 3
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
3.93 miles Nexstar: Elk Grove Bldg 4
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
3.94 miles Nexstar: Elk Grove Bldg 2
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
4.02 miles Nexstar: Elk Grove
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
4.14 miles DataBank ORD3 Mount Prospect
4.14 miles Colocation America CH3
4.22 miles Iron Mountain Chicago
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
4.42 miles Apotech: Illinois 1
Apotech Group operates its Illiois 1 data center facility in the Chicago market, situated at 1331 E Business Center Drive. This facility is a retrofitted structure, encompassing 32,000 square feet of space.
5.96 miles Complete Source Schaumburg
6.65 miles T5: Chicago lll
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
7.43 miles CoreInterested in this information?Contact us
7.68 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
7.98 miles Aligned Chicago ORD-01
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
8.01 miles Aligned ORD-02
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
8.35 miles Digital Realty: ORD15
In 2017, Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
8.43 miles Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
8.44 miles Digital Realty: Chicago ORD12
8.45 miles Digital Realty: ORD14
8.48 miles Digital Realty: ORD13
8.56 miles Tierpoint Chicago West
8.61 miles Digital Realty: Franklin Park Expansion
Digital Realty acquired two land parcels near their existing Franklin Park campus in separate transactions on July 2025, for a total of approximately $18 million.
9.52 miles East PlazaInterested in this information?Contact us
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
9.63 miles CoreInterested in this information?Contact us
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
9.75 miles Plaza TwoInterested in this information?Contact us
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
9.78 miles PlazaInterested in this information?Contact us
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
11.13 miles Connect Data Centers: Chicago
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
11.95 miles LexusNexis Oak Brook
11.95 miles Verizon: Swift Dr
11.95 miles DataBank (ORD4) Oak Brook
12.34 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
12.34 miles US Signal Oakbrook IL01
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
12.35 miles Verizon: (Oak Brook)
12.38 miles Digital Fortress: Chicago Lombard
12.39 miles 360TCS-Lombard
12.41 miles Karis: Hoffman Estates Campus
Karis Critical purchased 180 acres of land in the Hoffman Estates area from 5a7 for $45 million.
12.42 miles NYI Chicago (Oak Brook)
12.52 miles Karis: Hoffman 2
This planned facility would be part of Karis Critical's Hoffman Estates Campus in Chicago, Illinois.
12.59 miles CyrusOne: Lombard CHI5
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
12.86 miles Lumen Broadview
13.88 miles Compass Hoffman Estates
Located in Cook County, the campus will feature five buildings and represents a total planned investment of $10 billion.
14.63 miles Equinix Chicago CH7
14.92 miles Brennan Investment: Barrington, IL
The Brennan Investment Group has officially withdrawn its ambitious plans for a $2 billion data center project in Barrington Hills, a village located roughly 40 miles northwest of Chicago, Illinois.
16.24 miles CloudCenters: Lisle, IL
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
16.78 miles Centersquare: Lisle CHI1
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
16.84 miles Karis: Naperville, IL
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
17.48 miles MicroLink: Chicago, IL
MicroLink is planning to build a data center in Chicago, Illinois.
17.68 miles Karis: Naperville (INEOS)
Real estate developer Karis Critical is in early-stage exploratory discussions to potentially acquire the 168-acre former BP/INEOS campus at in Naperville, Illinois, within the Suburban Chicago market.
17.91 miles Cogent Naperville
17.98 miles SBA Edge: 603 Discovery
Former New Continuum site that was acquired in 2019
18.43 miles Metro Edge: Illinois Medical District (IMD)
Commercial real estate investment firm Metro Edge Development is building a data center in Chicago, Illinois.
18.43 miles Lumen Chicago 2
18.55 miles Lumen Chicago 4
19.02 miles NetSource Chicago
19.18 miles EXA - 111 North Canal
Former GTT suite
19.18 miles Lumen Chicago 1
19.32 miles Lumen Chicago 6
19.38 miles Lumen Chicago 3
19.45 miles TierPoint Chicago Polk
19.47 miles First Communications Chicago
19.52 miles QTS: Chicago 3
QTS plans to build another data center building on its Chicago Campus.
19.52 miles Hut 8: Batavia, IL
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
19.58 miles QTS: Chicago 2
QTS is developing 366,000 sq ft (34,000 sqm) of data center space across three stories, alongside 80,000 sq ft (7,432 sqm) of office and loading areas in its Chicago Campus.
19.59 miles Cogent: 216 W Jackson
19.62 miles Server Farm Realty 840 South Canal
4 MW Critical Load on Each Floor (Floors 1-5) 130-160 Watts per Raised Floor SF
19.62 miles DataBank (ORD2) 840 S Canal
19.65 miles QTS: Chicago Campus
The campus was a former Sun Times Press Facility and was acquired in 2014
19.75 miles Verizon: 140 S Dearborn
19.76 miles Legacy: Chicago Byte Exchange CBE1
An affiliate of real estate firm Prime Group bought an office building in Chicago from options exchange company Cboe Global Markets for $12 million.
19.80 miles QuadraNet Chicago
19.81 miles CoreSite Chicago CH1
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
19.81 miles Cogent: 427 S LaSalle
19.81 miles 365 Chicago
The site is a former Switch and Data site (also owned by Equinix for a short period.)
19.84 miles Netrality Chicago: 717 S Wells
The 10 story building was constructed in 1923 and eventually was converted into a data center.
19.85 miles Crown Castle 725 S Wells
19.85 miles 725 S Wells - 1547 Critical Systems
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
19.90 miles CoreSite Chicago CH2
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
19.93 miles Colocation America CH2
19.93 miles Cogent: 600 S Federal
19.93 miles Lumen Chicago 5
19.93 miles DataBank (ORD1) 600 S Federal
19.93 miles Digital Realty: Chicago ORD11

Prime: ORD01-03 Data Center Photos See all

Rendering of Prime's LAX-01 facility
Source: Prime DC

Operating Company

Operated by:

Prime Data Centers develops, acquires, and operates data centers for large enterprises and hyper-scalers. Through our own properties, customer assets (sale-leaseback), or greenfield developments, Prime delivers build-to-suit, powered-shell and turn-key solutions.

38
Facilities
12
Markets

News See all

Read PDC Breaks Ground on Three Buildings at Phoenix Campus
PDC Breaks Ground on Three Buildings at Phoenix Campus

PDC Breaks Ground on Three Buildings at Phoenix Campus

May 22, 2026 Prime Data Centers

Prime Data Centers has broken ground on three of five buildings at its 240MW PHX01 campus in Phoenix. Each 267,000 sq ft facility will deliver 48MW of IT capacity, while the campus’ new 250MW substation is expected to provide 144MW of IT load in Phase I.The campus is being developed on a...

Read more
Read Prime Plans to Construct Two Data Centers Outside Austin, Texas
Prime Plans to Construct Two Data Centers Outside Austin, Texas

Prime Plans to Construct Two Data Centers Outside Austin, Texas

May 13, 2026 Prime Data Centers

Prime DC has submitted plans to build two data centers near Austin, Texas. The company has registered with the Texas Department of Licensing and Regulation to construct the facilities in Lockhart, Caldwell County. The projects, named AUS01 and AUS02 and located at 1395 Bob White Road, will each...

Read more
Read Prime Begins Construction on New Data Center in Sacramento, California
Prime Begins Construction on New Data Center in Sacramento, California

Prime Begins Construction on New Data Center in Sacramento, California

May 08, 2026 Prime Data Centers

Prime Data Centers has begun construction on a new facility in California. This week, the company broke ground on SMF02, the second data center within its Sacramento campus. Located near its existing SMF01 site at 2408 AK Street, the new facility will span 150,000 square feet (13,935 sqm) and...

Read more
Read Grain Backs Parent Company of Prime Data Centers
Grain Backs Parent Company of Prime Data Centers

Grain Backs Parent Company of Prime Data Centers

April 09, 2026 Prime Data Centers

Grain Management has taken a stake in the owner of data center firm Prime Data Centers. The digital infrastructure-focused investment firm this week announced it has completed a significant preferred equity investment in Data Realty Holding Corp., the founding and controlling shareholder of Prime...

Read more
Read Prime Data Centers Plans 550MW Campus in Esbjerg, Denmark
Prime Data Centers Plans 550MW Campus in Esbjerg, Denmark

Prime Data Centers Plans 550MW Campus in Esbjerg, Denmark

March 27, 2026 Prime Data Centers

US data center firm Prime is expanding into Europe with a new development in Denmark. The company announced plans this week for a campus in Esbjerg in partnership with Brunswick Real Estate.The company is aiming to develop a 640,000 sqm (6.88 million sq ft) campus – known as ESB01 – on land along...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?