Carrier-Neutral Data CenterInterested in this information?Contact us

Latest Podcast Ed Meyer Rd
Planned
Future facility in planning stage
Operated by:

Carrier-Neutral Data Center

Short Code: CHI1
Year Planned: 2028
PUE: 1.1
Utility Provider: ComEd

MicroLink is planning to build a data center in Chicago, Illinois.

This facility features liquid-cooled, high-density AI compute infrastructure integrated with the Stickney water reclamation plant, returning recovered heat to the host's process and digesters. It utilizes grid power with a behind-the-meter gas bridge. The system features a design PUE of 1.10 and an ERE below 1.0 where heat is captured.

Map and Nearby Locations

Ed Meyer Rd
MicroLink Data Centers Sites
Nearby Facilities

Carrier-Neutral Data CenterInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Carrier-Neutral Data CenterInterested in this information?Contact us

Distance Site About
5.17 miles Lumen Broadview
5.85 miles QTS: Chicago 3
QTS plans to build another data center building on its Chicago Campus.
5.89 miles QTS: Chicago Campus
The campus was a former Sun Times Press Facility and was acquired in 2014
5.96 miles QTS: Chicago 2
QTS is developing 366,000 sq ft (34,000 sqm) of data center space across three stories, alongside 80,000 sq ft (7,432 sqm) of office and loading areas in its Chicago Campus.
6.27 miles Metro Edge: Illinois Medical District (IMD)
Commercial real estate investment firm Metro Edge Development is building a data center in Chicago, Illinois.
7.73 miles CoreSite Chicago CH2
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
7.88 miles 1547 Chicago Midway Technology Centre
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
7.94 miles TierPoint Chicago Polk
7.95 miles First Communications Chicago
8.03 miles Verizon: Swift Dr
8.03 miles DataBank (ORD4) Oak Brook
8.03 miles LexusNexis Oak Brook
8.04 miles Server Farm Realty 840 South Canal
4 MW Critical Load on Each Floor (Floors 1-5) 130-160 Watts per Raised Floor SF
8.04 miles DataBank (ORD2) 840 S Canal
8.40 miles 725 S Wells - 1547 Critical Systems
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
8.41 miles Crown Castle 725 S Wells
8.42 miles Netrality Chicago: 717 S Wells
The 10 story building was constructed in 1923 and eventually was converted into a data center.
8.54 miles Centersquare: Chicago ORD1(B, C & D)
Digital Realty Trust owns the building at 350 Cermak and is CTL's Landlord.
8.55 miles Lumen Chicago 1
8.55 miles EXA - 111 North Canal
Former GTT suite
8.56 miles Cogent: 216 W Jackson
8.56 miles Deft: Downtown CH1
8.56 miles Steadfast Chicago 350 E Cermak
8.56 miles Equinix Chicago CH1, CH2, & CH4
Equinix distinctly separates CH1, CH2, and CH4 into separate data centers, but in reality, the sites are in the same building.
8.56 miles Centersquare: Chicago ORD1
Centersquare's ORD1 site is located in the heart of the Chicago Financial District on the 7th floor of an 8-story building on a fiber-linked campus.
8.56 miles Colocation America CH1
8.56 miles Digital Realty: ORD10
Digital Realty acquired the colocation services business of Hivelocity in 2025.
8.59 miles Legacy: Chicago Byte Exchange CBE1
An affiliate of real estate firm Prime Group bought an office building in Chicago from options exchange company Cboe Global Markets for $12 million.
8.60 miles Cogent: 427 S LaSalle
8.60 miles CoreSite Chicago CH1
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
8.60 miles 365 Chicago
The site is a former Switch and Data site (also owned by Equinix for a short period.)
8.61 miles Cogent: 600 S Federal
8.61 miles Colocation America CH2
8.61 miles Lumen Chicago 5
8.61 miles QuadraNet Chicago
8.61 miles Digital Realty: Chicago ORD11
8.61 miles DataBank (ORD1) 600 S Federal
8.67 miles Lumen Chicago 6
8.78 miles Verizon: (Oak Brook)
8.78 miles US Signal Oakbrook IL01
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
8.78 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
8.81 miles Verizon: 140 S Dearborn
8.87 miles NYI Chicago (Oak Brook)
8.90 miles Lumen Chicago 3
8.92 miles Digital Realty: Franklin Park Expansion
Digital Realty acquired two land parcels near their existing Franklin Park campus in separate transactions on July 2025, for a total of approximately $18 million.
8.94 miles Lumen Chicago 4
8.98 miles Lumen Chicago 2
8.98 miles Tierpoint Chicago West
9.06 miles Digital Realty: ORD13
9.10 miles Digital Realty: ORD14
9.11 miles Digital Realty: Chicago ORD12
9.12 miles Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
9.18 miles Digital Realty: ORD15
In 2017, Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
10.09 miles Aligned ORD-02
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
10.10 miles Aligned Chicago ORD-01
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
10.18 miles Equinix Chicago CH7
10.20 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
10.56 miles Point PrimeInterested in this information?Contact us
11.09 miles T5: Chicago lll
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
12.22 miles 360TCS-Lombard
12.22 miles Digital Fortress: Chicago Lombard
13.06 miles Related Digital: Chicago Expansion
13.06 miles Related Digital: Chicago, IL
Related Digital is planning a 430-acre campus in Chicago, Illinois, at the old US Steel South Works location.
13.34 miles CyrusOne: Lombard CHI5
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
14.71 miles Iron Mountain Chicago
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
14.83 miles CloudCenters: Lisle, IL
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
14.84 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
14.90 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
14.91 miles CoreWeave: Hammond, IN
14.93 miles Carrier-Neutral Data CenterInterested in this information?Contact us
CyrusOne is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
14.94 miles Digital Crossroad: Hammond, IN (Phase 2)
Digital Crossroad is planning to expand its campus in Hammond, Indiana. The company plans to add another 450,000 sq ft (16,720 sqm) building in the second phase.
15.03 miles Digital Crossroad (Indiana NAP)
The facility (DX-1) is a 105,000 square foot data center located on the former State Line Generating Plant, Hammond, IN.
15.56 miles Centersquare: Chicago ORD2
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
15.67 miles TA Realty: Elk Grove
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
15.69 miles 2299 Busse (CH2) Digital Realty
15.81 miles Rackspace Elk Grove ORD1
15.82 miles Digital Elk Grove Village Campus
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
15.82 miles HostPapa CH1
Formerly known as "ColoCrossing CH1"
15.82 miles Deft: Elk Grove DF-CH1
15.83 miles EdgeConneX CHI01
15.86 miles 2200 Busse Rd (CH1) DRT
15.89 miles 1450 E Devon Ave (CH3) DRT
15.89 miles EdgeConneX: CHI03
EdgeConneX CHI03 is a new 167,000-square-foot, two-story data center building on its Elkgrove campus near Chicago.
15.92 miles EdgeConneX CHI02
15.96 miles Equinix: CH5
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
15.96 miles Stream Chicago I
Free-Standing, Data Center Designed to Tier III Standards
15.96 miles Stream Chicago II
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
15.98 miles Equinix Chicago CH3
16.11 miles T5: Chicago V
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
16.17 miles DigiCo: Chicago
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
16.47 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
16.48 miles Centersquare: Lisle CHI1
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
16.54 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
16.57 miles STACK Chicago CHI01
16.60 miles CoreWeave: US Central ORD1
16.65 miles STACK CHI01B
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
16.67 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
16.77 miles Stack: CHI02
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
16.94 miles NTT: Chicago CH4
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
16.97 miles NTT: CH3
This facility is a part of NTT's Chicago data center campus in Illinois.
16.98 miles NTT: Chicago CH5
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
17.01 miles NTT Chicago CH1
NTT acquired its Chicago site in 2018 through its RagingWire subsidiary. Launched in 2021, the first two-story data center, CH1, spans 126,000 sq ft (11,705 sqm) of data floor space.
17.06 miles NTT: CH2
This facility is a part of NTT's Chicago data center campus in Illinois.
17.41 miles Prime Elk Grove
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
17.48 miles Prime: ORD01-02
Building B will be another three-story construction, offering 279,360 gross square feet of space.
17.48 miles Prime: ORD01-03
Building C will be another three-story construction, offering 294,429 gross square feet of space.
17.67 miles CenturyLink: Arlington Heights
17.73 miles Central PointInterested in this information?Contact us
The 37-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
17.76 miles Karis: Naperville, IL
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
17.77 miles MaxInterested in this information?Contact us
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
17.80 miles T5 Chicago II
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
17.82 miles CloudHQ: Mount Prospect ORD2
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
17.86 miles East CenterInterested in this information?Contact us
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
17.94 miles CloudHQ: Mount Prospect ORD1
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
17.95 miles CloudHQ Mount Prospect ORD3
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
18.60 miles Aligned: ORD-04
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
18.67 miles Aligned: ORD-03
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
18.77 miles Connect Data Centers: Chicago
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
19.00 miles Nexstar: Elk Grove Bldg 3
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
19.00 miles Cogent Naperville
19.08 miles Nexstar: Elk Grove Bldg 2
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
19.17 miles Nexstar: Elk Grove
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
19.19 miles Nexstar: Elk Grove Bldg 4
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
19.39 miles Karis: Naperville (INEOS)
Real estate developer Karis Critical is in early-stage exploratory discussions to potentially acquire the 168-acre former BP/INEOS campus at in Naperville, Illinois, within the Suburban Chicago market.
19.74 miles Apotech: Illinois 1
Apotech Group operates its Illiois 1 data center facility in the Chicago market, situated at 1331 E Business Center Drive. This facility is a retrofitted structure, encompassing 32,000 square feet of space.
19.80 miles Colocation America CH3
19.80 miles DataBank ORD3 Mount Prospect
19.95 miles Summit: Naperville

Carrier-Neutral Data CenterInterested in this information?Contact us Data Center Photos See all

Operating Company

Operated by:
8
Facilities
8
Markets

News See all

Read Closed Chicago-area incinerator Being Explored for Data Center Development
A shuttered incinerator in Robbins, near Chicago, is attracting interest from multiple data center developers. According to NBC and the Chicago Tribune, at least five potential buyers have approach...

Closed Chicago-area incinerator Being Explored for Data Center Development

June 26, 2026 Chicago

A shuttered incinerator in Robbins, near Chicago, is attracting interest from multiple data center developers. According to NBC and the Chicago Tribune, at least five potential buyers have approached owner Paul Duggan this year about acquiring the 16-acre Robbins Resource Recovery Center site at...

Read more
Read New Firm Announces Plans for 20MW Liquid-Cooled Data Center
New Firm Announces Plans for 20MW Liquid-Cooled Data Center

New Firm Announces Plans for 20MW Liquid-Cooled Data Center

September 12, 2025 Chicago

A new liquid-cooled data center is being developed in downtown Chicago, Illinois by HydraVault, a new data center developer. The developer says the facility will be “designed from the ground up” for AI and financial systems.The 20MW two-story facility, located at 2538 South Wabash Avenue, will...

Read more
Read Prologis sells Chicago warehouse to HMC Capital
Prologis sells Chicago warehouse to HMC Capital

Prologis sells Chicago warehouse to HMC Capital

December 12, 2024 Chicago

Prologis has sold a data center development in Chicago, Illinois to HMC Capital. The industrial real estate giant said the warehouse is held in the US Logistics Fund, a Prologis co-investment vehicle focused on premier logistics real estate, including higher and better-use conversions.HMC Capital...

Read more
Read Colovore to expand footprint of liquid-cooled colocation data centers beyond Silicon Valley
Colovore to expand footprint of liquid-cooled colocation data centers beyond Silicon Valley

Colovore to expand footprint of liquid-cooled colocation data centers beyond Silicon Valley

November 20, 2024 Chicago

Colovore is to expand its footprint of liquid-cooled colocation data centers beyond Silicon Valley and into Reno and Chicago. The company this week announced its second facility in Santa Clara, California, will open next month, and confirmed the locations of its next two sites.“We are staying...

Read more
Read The site plan for Metro Edge Development Partners' Chicago data center approved
The site plan for Metro Edge Development Partners' Chicago data center approved

The site plan for Metro Edge Development Partners' Chicago data center approved

June 29, 2023 Chicago

The Chicago, Illinois data center of commercial real estate finance firm Metro Edge Development Partners has been granted site approval. The corporation received site plan approval for its IMD1 data center from the Chicago Department of Planning and Development this month. IMD1 will be a...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?