Stack Infrastructure breaks ground on 60MW data center expansion in California
March 29, 2024
STACK INFRASTRUCTURE
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02. Set on 18 acres, the two-story, 263,000 sq ft (24,433 sqm) data center will be located around a mile away from the company’s existing CHI01 campus. It will feature a close-loop cooling system able to support air and liquid cooling.
| Distance | Site | About |
|---|---|---|
| 0.21 miles | Stream: Chicago III |
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
| 0.24 miles | Stream: Chicago III DC3 |
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
| 0.25 miles | Stream: Chicago III DC2 |
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
| 0.63 miles | STACK Chicago CHI01 |
|
| 0.66 miles | Prime Elk Grove |
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
|
| 0.68 miles | STACK CHI01B |
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
|
| 0.72 miles | Prime: ORD01-02 |
Building B will be another three-story construction, offering 279,360 gross square feet of space.
|
| 0.74 miles | Prime: ORD01-03 |
Building C will be another three-story construction, offering 294,429 gross square feet of space.
|
| 0.84 miles | Stream Chicago I |
Free-Standing, Data Center Designed to Tier III Standards
|
| 0.88 miles | Equinix: CH5 |
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
|
| 0.89 miles | Equinix Chicago CH3 |
|
| 0.89 miles | T5: Chicago V |
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
|
| 0.90 miles | EdgeConneX CHI02 | |
| 0.91 miles | EdgeConneX: CHI03 |
EdgeConneX CHI03 is a new 167,000-square-foot, two-story data center building on its Elkgrove campus near Chicago.
|
| 0.97 miles | EdgeConneX CHI01 |
|
| 0.97 miles | Hyperscale Data Center Request Dataset | |
| 1.01 miles | Hyperscale Data Center Request Dataset |
The 37-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
| 1.03 miles | Hyperscale Data Center Request Dataset |
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
| 1.03 miles | Stream Chicago II |
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
|
| 1.11 miles | T5 Chicago II |
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
|
| 1.11 miles | Hyperscale Data Center Request Dataset |
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
| 1.17 miles | TA Realty: Elk Grove |
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
|
| 1.20 miles | CenturyLink: Arlington Heights | |
| 1.33 miles | 2200 Busse Rd (CH1) DRT | |
| 1.37 miles | 2299 Busse (CH2) Digital Realty |
|
| 1.38 miles | HostPapa CH1 |
Formerly known as "ColoCrossing CH1"
|
| 1.38 miles | Digital Elk Grove Village Campus |
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
|
| 1.38 miles | Deft: Elk Grove DF-CH1 |
|
| 1.39 miles | Rackspace Elk Grove ORD1 | |
| 1.42 miles | 1450 E Devon Ave (CH3) DRT | |
| 1.44 miles | CloudHQ: Mount Prospect ORD2 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
| 1.45 miles | CloudHQ: Mount Prospect ORD1 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
| 1.50 miles | Centersquare: Chicago ORD2 |
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
|
| 1.57 miles | CloudHQ Mount Prospect ORD3 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
| 1.69 miles | DigiCo: Chicago |
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
|
| 1.85 miles | Aligned: ORD-04 |
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
|
| 1.92 miles | Aligned: ORD-03 |
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
|
| 2.53 miles | CyrusOne: Wood Dale CHI6 |
CyrusOne is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
|
| 2.68 miles | Element Critical CH1 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
| 2.86 miles | Element Critical CH2 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
| 2.96 miles | NTT: Chicago CH5 |
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
|
| 2.98 miles | NTT: Chicago CH4 |
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
|
| 3.10 miles | NTT: CH2 |
This facility is a part of NTT's Chicago data center campus in Illinois.
|
| 3.14 miles | NTT Chicago CH1 |
NTT acquired its Chicago site in 2018 through its RagingWire subsidiary. Launched in 2021, the first two-story data center, CH1, spans 126,000 sq ft (11,705 sqm) of data floor space.
|
| 3.21 miles | NTT: CH3 |
This facility is a part of NTT's Chicago data center campus in Illinois.
|
| 3.90 miles | Iron Mountain Chicago |
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
|
| 3.92 miles | Nexstar: Elk Grove Bldg 3 |
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
| 4.04 miles | Nexstar: Elk Grove Bldg 2 |
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
| 4.06 miles | Nexstar: Elk Grove Bldg 4 |
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
| 4.13 miles | Nexstar: Elk Grove |
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
|
| 4.69 miles | Colocation America CH3 | |
| 4.69 miles | DataBank ORD3 Mount Prospect |
|
| 4.93 miles | Apotech: Illinois 1 |
Apotech Group operates its Illiois 1 data center facility in the Chicago market, situated at 1331 E Business Center Drive. This facility is a retrofitted structure, encompassing 32,000 square feet of space.
|
| 5.91 miles | T5: Chicago lll |
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
|
| 6.46 miles | Complete Source Schaumburg | |
| 6.69 miles | Hyperscale Data Center Request Dataset |
|
| 6.94 miles | 505 N Railroad Ave - Digital Realty |
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
| 7.24 miles | Aligned Chicago ORD-01 |
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
|
| 7.28 miles | Aligned ORD-02 |
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
|
| 7.66 miles | Digital Realty: ORD15 |
In 2017, Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
|
| 7.75 miles | Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty |
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
|
| 7.75 miles | Digital Realty: Chicago ORD12 | |
| 7.77 miles | Digital Realty: ORD14 | |
| 7.80 miles | Digital Realty: ORD13 | |
| 7.87 miles | Tierpoint Chicago West | |
| 7.92 miles | Digital Realty: Franklin Park Expansion |
Digital Realty acquired two land parcels near their existing Franklin Park campus in separate transactions on July 2025, for a total of approximately $18 million.
|
| 10.00 miles | Hyperscale Data Center Request Dataset |
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|
| 10.12 miles | Hyperscale Data Center Request Dataset |
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|
| 10.23 miles | Hyperscale Data Center Request Dataset |
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
|
| 10.26 miles | Hyperscale Data Center Request Dataset |
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
|
| 10.81 miles | Connect Data Centers: Chicago |
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
|
| 11.22 miles | LexusNexis Oak Brook | |
| 11.22 miles | Verizon: Swift Dr |
|
| 11.22 miles | DataBank (ORD4) Oak Brook |
|
| 11.62 miles | Server Farm Oak Brook |
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
|
| 11.62 miles | US Signal Oakbrook IL01 |
800a 480V 3 phase
450kW diesel generator with 24 hour run time at full load
500kVa UPS capacity with battery backup
|
| 11.63 miles | Verizon: (Oak Brook) | |
| 11.70 miles | NYI Chicago (Oak Brook) | |
| 11.74 miles | Digital Fortress: Chicago Lombard | |
| 11.75 miles | 360TCS-Lombard | |
| 11.98 miles | CyrusOne: Lombard CHI5 |
9 MW of critical capacity
Both a 1.5MW and a 2MW transformer
|
| 12.13 miles | Lumen Broadview | |
| 12.85 miles | Karis: Hoffman Estates Campus |
Karis Critical purchased 180 acres of land in the Hoffman Estates area from 5a7 for $45 million.
|
| 12.96 miles | Karis: Hoffman 2 |
This planned facility would be part of Karis Critical's Hoffman Estates Campus in Chicago, Illinois.
|
| 13.94 miles | Equinix Chicago CH7 |
|
| 14.28 miles | Compass Hoffman Estates |
Located in Cook County, the campus will feature five buildings and represents a total planned investment of $10 billion.
|
| 15.66 miles | CloudCenters: Lisle, IL |
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
|
| 16.24 miles | Centersquare: Lisle CHI1 |
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
|
| 16.35 miles | Karis: Naperville, IL |
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
|
| 17.44 miles | Cogent Naperville | |
| 17.78 miles | SBA Edge: 603 Discovery |
Former New Continuum site that was acquired in 2019
|
| 17.84 miles | Metro Edge: Illinois Medical District (IMD) |
Commercial real estate investment firm Metro Edge Development is building a data center in Chicago, Illinois.
|
| 17.91 miles | Lumen Chicago 2 | |
| 18.03 miles | Lumen Chicago 4 | |
| 18.62 miles | NetSource Chicago | |
| 18.64 miles | EXA - 111 North Canal |
Former GTT suite
|
| 18.64 miles | Lumen Chicago 1 |
|
| 18.78 miles | Lumen Chicago 6 |
|
| 18.85 miles | Lumen Chicago 3 |
|
| 18.89 miles | TierPoint Chicago Polk |
|
| 18.91 miles | QTS: Chicago 3 |
QTS plans to build another data center building on its Chicago Campus.
|
| 18.91 miles | First Communications Chicago | |
| 18.97 miles | QTS: Chicago 2 |
QTS is developing 366,000 sq ft (34,000 sqm) of data center space across three stories, alongside 80,000 sq ft (7,432 sqm) of office and loading areas in its Chicago Campus.
|
| 19.03 miles | QTS: Chicago Campus |
The campus was a former Sun Times Press Facility and was acquired in 2014
|
| 19.05 miles | Cogent: 216 W Jackson | |
| 19.06 miles | Server Farm Realty 840 South Canal |
4 MW Critical Load on Each Floor (Floors 1-5)
130-160 Watts per Raised Floor SF
|
| 19.06 miles | DataBank (ORD2) 840 S Canal |
|
| 19.21 miles | Verizon: 140 S Dearborn | |
| 19.21 miles | Legacy: Chicago Byte Exchange CBE1 |
An affiliate of real estate firm Prime Group bought an office building in Chicago from options exchange company Cboe Global Markets for $12 million.
|
| 19.25 miles | QuadraNet Chicago | |
| 19.26 miles | Cogent: 427 S LaSalle | |
| 19.26 miles | CoreSite Chicago CH1 |
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
|
| 19.26 miles | 365 Chicago |
The site is a former Switch and Data site (also owned by Equinix for a short period.)
|
| 19.29 miles | Netrality Chicago: 717 S Wells |
The 10 story building was constructed in 1923 and eventually was converted into a data center.
|
| 19.30 miles | Crown Castle 725 S Wells |
|
| 19.30 miles | 725 S Wells - 1547 Critical Systems |
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
|
| 19.30 miles | Crypto Mining Data Center Request Dataset |
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
|
| 19.32 miles | CoreSite Chicago CH2 |
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
|
| 19.38 miles | Cogent: 600 S Federal | |
| 19.38 miles | Colocation America CH2 | |
| 19.38 miles | Lumen Chicago 5 | |
| 19.39 miles | DataBank (ORD1) 600 S Federal | |
| 19.39 miles | Digital Realty: Chicago ORD11 |
STACK Infrastructure is a privately held platform sponsored by IPI Partners that focuses on large scale wholesale capacity and campus development for hyperscale and enterprise customers.
The company was launched in 2019 when IPI combined the remaining Infomart Data Centers assets with selected T5 Data Centers facilities, and industry coverage at launch cited eight data centers across six U.S. markets totaling about 100 MW. In March 2022,
IPI unified DigiPlex in the Nordics and SUPERNAP Italia in Milan under the STACK brand to form STACK EMEA, expanding the platform across Europe. STACK has since added international sites, including the first phase of a 56 MW campus in Toronto and its first Australian data center in Melbourne. Core services referenced by the company and trade press include wholesale colocation, build to suit, and powered shell solutions.
March 29, 2024
STACK INFRASTRUCTURE
January 11, 2024
STACK INFRASTRUCTURE
December 08, 2023
STACK INFRASTRUCTURE
September 22, 2023
STACK INFRASTRUCTURE
September 20, 2023
STACK INFRASTRUCTURE
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas