0.07 miles
|
Equinix: CH5
|
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
|
|
0.12 miles
|
EdgeConneX CHI02
|
|
|
0.19 miles
|
Stream Chicago I
|
Free-Standing, Data Center Designed to Tier III Standards
|
|
0.22 miles
|
EdgeConneX CHI01
|
|
|
0.22 miles
|
Stream Chicago II
|
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
|
|
0.23 miles
|
EdgeConneX: CHI03
|
EdgeConneX CHI03 is a new 167,000-square-foot, two-story data center building on its Elkgrove campus near Chicago.
|
|
0.51 miles
|
2299 Busse (CH2) Digital Realty
|
|
|
0.56 miles
|
2200 Busse Rd (CH1) DRT
|
|
|
0.60 miles
|
Rackspace Elk Grove ORD1
|
|
|
0.60 miles
|
Digital Elk Grove Village Campus
|
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
|
|
0.60 miles
|
HostPapa CH1
|
Formerly known as "ColoCrossing CH1"
|
|
0.60 miles
|
Deft: Elk Grove DF-CH1
|
|
|
0.62 miles
|
STACK Chicago CHI01
|
|
|
0.63 miles
|
Centersquare: Chicago ORD2
|
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
|
|
0.69 miles
|
1450 E Devon Ave (CH3) DRT
|
|
|
0.70 miles
|
Carrier-Neutral Data Center
Request Dataset
|
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
|
0.71 miles
|
STACK CHI01B
|
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
|
|
0.79 miles
|
Carrier-Neutral Data Center
Request Dataset
|
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
|
0.81 miles
|
CoreWeave: US Central ORD1
|
|
|
0.87 miles
|
TA Realty: Elk Grove
|
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
|
|
0.89 miles
|
Stack: CHI02
|
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
|
|
0.90 miles
|
Carrier-Neutral Data Center
Request Dataset
|
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
|
1.00 miles
|
T5: Chicago V
|
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
|
|
1.16 miles
|
DigiCo: Chicago
|
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
|
|
1.54 miles
|
Prime Elk Grove
|
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
|
|
1.59 miles
|
Prime: ORD01-02
|
Building B will be another three-story construction, offering 279,360 gross square feet of space.
|
|
1.62 miles
|
Prime: ORD01-03
|
Building C will be another three-story construction, offering 294,429 gross square feet of space.
|
|
1.68 miles
|
Carrier-Neutral Data Center
Request Dataset
|
CyrusOne is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
|
|
1.76 miles
|
Hyperscale Data Center
Request Dataset
|
The 37-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
|
1.81 miles
|
Hyperscale Data Center
Request Dataset
|
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
|
1.82 miles
|
T5 Chicago II
|
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
|
|
1.84 miles
|
Element Critical CH1
|
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
|
1.89 miles
|
Hyperscale Data Center
Request Dataset
|
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
|
2.02 miles
|
Element Critical CH2
|
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
|
2.07 miles
|
CenturyLink: Arlington Heights
|
|
|
2.31 miles
|
CloudHQ: Mount Prospect ORD2
|
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
|
2.34 miles
|
CloudHQ: Mount Prospect ORD1
|
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
|
2.44 miles
|
CloudHQ Mount Prospect ORD3
|
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
|
2.64 miles
|
Aligned: ORD-04
|
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
|
|
2.66 miles
|
NTT: Chicago CH5
|
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
|
|
2.67 miles
|
NTT: Chicago CH4
|
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
|
|
2.69 miles
|
Aligned: ORD-03
|
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
|
|
2.81 miles
|
NTT: CH2
|
This facility is a part of NTT's Chicago data center campus in Illinois.
|
|
2.83 miles
|
NTT Chicago CH1
|
NTT acquired its Chicago site in 2018 through its RagingWire subsidiary. Launched in 2021, the first two-story data center, CH1, spans 126,000 sq ft (11,705 sqm) of data floor space.
|
|
2.89 miles
|
NTT: CH3
|
This facility is a part of NTT's Chicago data center campus in Illinois.
|
|
3.84 miles
|
Iron Mountain Chicago
|
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
|
|
4.05 miles
|
Nexstar: Elk Grove Bldg 3
|
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
|
4.17 miles
|
Nexstar: Elk Grove Bldg 2
|
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
|
4.22 miles
|
Nexstar: Elk Grove Bldg 4
|
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
|
4.27 miles
|
Nexstar: Elk Grove
|
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
|
|
5.05 miles
|
T5: Chicago lll
|
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
|
|
5.49 miles
|
Colocation America CH3
|
|
|
5.49 miles
|
DataBank ORD3 Mount Prospect
|
|
|
5.71 miles
|
Apotech: Illinois 1
|
Apotech Group operates its Illiois 1 data center facility in the Chicago market, situated at 1331 E Business Center Drive. This facility is a retrofitted structure, encompassing 32,000 square feet of space.
|
|
5.82 miles
|
Hyperscale Data Center
Request Dataset
|
|
|
6.07 miles
|
505 N Railroad Ave - Digital Realty
|
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
|
6.36 miles
|
Aligned Chicago ORD-01
|
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
|
|
6.40 miles
|
Aligned ORD-02
|
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
|
|
6.93 miles
|
Digital Realty: ORD15
|
In 2017, Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
|
|
6.99 miles
|
Complete Source Schaumburg
|
|
|
7.02 miles
|
Digital Realty: Chicago ORD12
|
|
|
7.03 miles
|
Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty
|
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
|
|
7.04 miles
|
Digital Realty: ORD14
|
|
|
7.07 miles
|
Digital Realty: ORD13
|
|
|
7.15 miles
|
Tierpoint Chicago West
|
|
|
7.19 miles
|
Digital Realty: Franklin Park Expansion
|
Digital Realty acquired two land parcels near their existing Franklin Park campus in separate transactions on July 2025, for a total of approximately $18 million.
|
|
10.33 miles
|
LexusNexis Oak Brook
|
|
|
10.33 miles
|
Verizon: Swift Dr
|
|
|
10.33 miles
|
DataBank (ORD4) Oak Brook
|
|
|
10.34 miles
|
Connect Data Centers: Chicago
|
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
|
|
10.51 miles
|
Hyperscale Data Center
Request Dataset
|
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|
|
10.64 miles
|
Hyperscale Data Center
Request Dataset
|
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|
|
10.73 miles
|
Hyperscale Data Center
Request Dataset
|
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
|
|
10.73 miles
|
Server Farm Oak Brook
|
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
|
|
10.73 miles
|
US Signal Oakbrook IL01
|
800a 480V 3 phase
450kW diesel generator with 24 hour run time at full load
500kVa UPS capacity with battery backup
|
|
10.73 miles
|
Verizon: (Oak Brook)
|
|
|
10.77 miles
|
Hyperscale Data Center
Request Dataset
|
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
|
|
10.81 miles
|
NYI Chicago (Oak Brook)
|
|
|
10.91 miles
|
Digital Fortress: Chicago Lombard
|
|
|
10.91 miles
|
360TCS-Lombard
|
|
|
11.18 miles
|
CyrusOne: Lombard CHI5
|
9 MW of critical capacity
Both a 1.5MW and a 2MW transformer
|
|
11.28 miles
|
Lumen Broadview
|
|
|
13.07 miles
|
Equinix Chicago CH7
|
|
|
13.28 miles
|
Karis: Hoffman Estates Campus
|
Karis Critical purchased 180 acres of land in the Hoffman Estates area from 5a7 for $45 million.
|
|
13.40 miles
|
Karis: Hoffman 2
|
This planned facility would be part of Karis Critical's Hoffman Estates Campus in Chicago, Illinois.
|
|
14.67 miles
|
Compass Hoffman Estates
|
Located in Cook County, the campus will feature five buildings and represents a total planned investment of $10 billion.
|
|
14.87 miles
|
CloudCenters: Lisle, IL
|
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
|
|
15.50 miles
|
Centersquare: Lisle CHI1
|
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
|
|
15.65 miles
|
Karis: Naperville, IL
|
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
|
|
15.85 miles
|
Brennan Investment: Barrington, IL
|
The Brennan Investment Group has officially withdrawn its ambitious plans for a $2 billion data center project in Barrington Hills, a village located roughly 40 miles northwest of Chicago, Illinois.
|
|
15.98 miles
|
Carrier-Neutral Data Center
Request Dataset
|
MicroLink is planning to build a data center in Chicago, Illinois.
|
|
16.77 miles
|
Cogent Naperville
|
|
|
17.25 miles
|
Metro Edge: Illinois Medical District (IMD)
|
Commercial real estate investment firm Metro Edge Development is building a data center in Chicago, Illinois.
|
|
17.42 miles
|
SBA Edge: 603 Discovery
|
Former New Continuum site that was acquired in 2019
|
|
17.44 miles
|
Lumen Chicago 2
|
|
|
17.55 miles
|
Lumen Chicago 4
|
|
|
18.04 miles
|
NetSource Chicago
|
|
|
18.13 miles
|
Lumen Chicago 1
|
|
|
18.13 miles
|
EXA - 111 North Canal
|
Former GTT suite
|
|
18.28 miles
|
Lumen Chicago 6
|
|
|
18.28 miles
|
QTS: Chicago 3
|
QTS plans to build another data center building on its Chicago Campus.
|
|
18.35 miles
|
QTS: Chicago 2
|
QTS is developing 366,000 sq ft (34,000 sqm) of data center space across three stories, alongside 80,000 sq ft (7,432 sqm) of office and loading areas in its Chicago Campus.
|
|
18.35 miles
|
Lumen Chicago 3
|
|
|
18.35 miles
|
TierPoint Chicago Polk
|
|
|
18.37 miles
|
First Communications Chicago
|
|
|
18.41 miles
|
QTS: Chicago Campus
|
The campus was a former Sun Times Press Facility and was acquired in 2014
|
|
18.52 miles
|
DataBank (ORD2) 840 S Canal
|
|
|
18.52 miles
|
Server Farm Realty 840 South Canal
|
4 MW Critical Load on Each Floor (Floors 1-5)
130-160 Watts per Raised Floor SF
|
|
18.53 miles
|
Cogent: 216 W Jackson
|
|
|
18.70 miles
|
Legacy: Chicago Byte Exchange CBE1
|
An affiliate of real estate firm Prime Group bought an office building in Chicago from options exchange company Cboe Global Markets for $12 million.
|
|
18.70 miles
|
Verizon: 140 S Dearborn
|
|
|
18.74 miles
|
QuadraNet Chicago
|
|
|
18.74 miles
|
Cogent: 427 S LaSalle
|
|
|
18.74 miles
|
CoreSite Chicago CH1
|
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
|
|
18.74 miles
|
365 Chicago
|
The site is a former Switch and Data site (also owned by Equinix for a short period.)
|
|
18.76 miles
|
Netrality Chicago: 717 S Wells
|
The 10 story building was constructed in 1923 and eventually was converted into a data center.
|
|
18.77 miles
|
CoreSite Chicago CH2
|
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
|
|
18.77 miles
|
Crown Castle 725 S Wells
|
|
|
18.77 miles
|
725 S Wells - 1547 Critical Systems
|
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
|
|
18.86 miles
|
Lumen Chicago 5
|
|
|
18.86 miles
|
Colocation America CH2
|
|
|
18.86 miles
|
Cogent: 600 S Federal
|
|
|
18.87 miles
|
Digital Realty: Chicago ORD11
|
|
|
18.87 miles
|
DataBank (ORD1) 600 S Federal
|
|
|
18.92 miles
|
Hut 8: Batavia, IL
|
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
|
|
19.90 miles
|
Edged Energy: Aurora ORD01
|
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
|