CyrusOne: Lombard CHI5

Latest Podcast 1850 Springer Drive
Operational
Fully operational facility
Operated by:

CyrusOne: Lombard CHI5

Short Code: CHI5
Ownership: CyrusOne does not own the real estate.
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Power:

  • Multiple levels of redundancy available within same footprint (e.g. N, N+1)
  • 150kVA PDUs with single feed
  • Scalable 2.4 MW Cummins dedicated generators
  • 8,000 gallon site capacity

Cooling:

  • 24 and 36-inch raised floor design
  • N+1 cooling configuration
  • Glycol cooling loop
  • Utilizes CRAC unit with 420 ton cooling capacity

Compliance:

  • SSAE 16 (SOC I type II)
  • PCI DSS (sec 9 & 12)
  • HIPAA
  • ISO 27001
  • FISMA
  • Biometric security scans
  • Video surveillance and recording of the exterior and interior of facility
  • Biometric and key card (color coded) security for rigid access control
  • Cabinet and cage security options include individual locks and biometric scanners

Map and Nearby Locations

1850 Springer Drive
CyrusOne Sites
Nearby Facilities

Sites within 15 miles of CyrusOne: Lombard CHI5

Distance Site
1.12 miles Digital Fortress: Chicago Lombard
1.12 miles 360TCS-Lombard
3.71 miles CloudCenters: Lisle, IL
3.86 miles Equinix Chicago CH7
4.52 miles NYI Chicago (Oak Brook)
4.63 miles Verizon: (Oak Brook)
4.63 miles US Signal Oakbrook IL01
4.63 miles Server Farm Oak Brook
4.66 miles Centersquare: Lisle CHI1
5.36 miles Karis: Naperville, IL
5.60 miles LexusNexis Oak Brook
5.60 miles Verizon: Swift Dr
5.60 miles DataBank (ORD4) Oak Brook
6.13 miles Connect Data Centers: Chicago
6.68 miles Cogent Naperville
6.82 miles Karis: Naperville (INEOS)
7.23 miles Aligned: ORD-02
7.29 miles Aligned: ORD-01
7.63 miles Metro PlazaInterested in this information?Contact us
7.74 miles 505 N Railroad Ave - Digital Realty
8.26 miles T5: Chicago lll
8.82 miles Lumen Broadview
8.93 miles NetSource Chicago
9.16 miles Element Critical CH2
9.35 miles Element Critical CH1
9.52 miles Carrier-Neutral Data CenterInterested in this information?Contact us
9.57 miles NTT: Chicago CH3
9.66 miles NTT: Chicago CH1
9.73 miles NTT: Chicago CH2
9.75 miles NTT: Chicago CH4
9.76 miles NTT: Chicago CH5
10.24 miles Digital Realty: ORD15
10.26 miles Digital Realty: Franklin Park Expansion
10.30 miles Digital Realty: ORD13
10.32 miles Digital Realty: ORD12
10.33 miles Tierpoint Chicago West
10.35 miles DigiCo: Chicago
10.36 miles Digital Realty: ORD14
10.56 miles Centersquare: Chicago ORD2
10.58 miles 1400 E Devon Ave (CH3) DRT
10.61 miles Rackspace Elk Grove ORD1
10.61 miles Deft: Elk Grove DF-CH1
10.61 miles HostPapa CH1
10.66 miles 2200 Busse Rd (CH1) DRT
10.67 miles 2299 Busse (CH2) Digital Realty
10.72 miles Colovore: West Chicago ORD02
10.99 miles Stream Chicago II
11.02 miles 4267 Meridian Pkwy: Lincoln Rackhouse
11.02 miles US Signal: IL02 Aurora
11.03 miles DataBridge: Aurora, IL
11.07 miles Colovore: ORD04
11.07 miles Nexstar: Elk Grove Bldg3
11.07 miles Nexstar: Elk Grove Bldg2
11.11 miles Colovore: ORD03
11.11 miles Nexstar: Elk Grove Bldg1
11.12 miles CoreWeave: US Central ORD1
11.18 miles Equinix Chicago CH3
11.19 miles Colovore: ORD01
11.20 miles Nexstar: Elk Grove Bldg4
11.22 miles Equinix: CH5
11.23 miles EdgeConneX CHI01
11.24 miles EdgeConneX CHI02
11.26 miles Edged Energy: Aurora ORD01
11.29 miles EdgeConneX: CHI03
11.33 miles Stream Chicago I
11.38 miles Stack: CHI01B
11.39 miles Stack: CHI01A
11.39 miles Edged Energy: Chicago ORD03
11.42 miles Edged Energy: Chicago ORD02
11.45 miles SBA Edge: 603 Discovery
11.57 miles CyrusOne: Aurora CME (CHI1)
11.60 miles DataCanopy: Chicago, IL
11.61 miles CyrusOne: CHI3 DC1
11.63 miles CyrusOne: CHI2 DC1
11.69 miles TA Realty: Elk Grove
11.72 miles CyrusOne: CHI3 DC2
11.79 miles CyrusOne: CHI2 DC2
11.86 miles EdgeConneX: CHI04
11.87 miles Carrier-Neutral Data CenterInterested in this information?Contact us
11.96 miles Stream: Chicago ORDC2
11.98 miles EdgeConneX: CHI05
12.06 miles Stream: Chicago ORDC3
12.07 miles T5: Chicago V
12.13 miles Stack: CHI02
12.34 miles T5 Chicago II
12.35 miles Hut 8: Batavia, IL
12.38 miles ParkInterested in this information?Contact us
12.46 miles Metro StationInterested in this information?Contact us
12.51 miles Prime: ORD01-01
12.51 miles Prime: ORD01-02
12.52 miles West ValleyInterested in this information?Contact us
12.59 miles Prime: ORD01-03
12.99 miles Aligned: ORD-03
13.04 miles Aligned: ORD-04
13.17 miles CenturyLink: Arlington Heights
13.39 miles CloudHQ: ORD1
13.42 miles CloudHQ: ORD2
13.49 miles Iron Mountain Chicago
13.53 miles CloudHQ: ORD3
14.45 miles Complete Source Schaumburg
16.31 miles WhiteRose: South Elgin, IL
16.55 miles Plaza MaxInterested in this information?Contact us
16.63 miles Plaza ThreeInterested in this information?Contact us
16.67 miles DataBank ORD3 Mount Prospect
16.67 miles Colocation America CH3
16.71 miles StationInterested in this information?Contact us
16.74 miles Hub PlusInterested in this information?Contact us
16.89 miles Apotech: Illinois 1
18.01 miles Karis: Hoffman Estates Campus
18.28 miles Metro Edge: Illinois Medical District (IMD)
18.30 miles H5: Chicago
18.45 miles Compass Hoffman Estates
18.54 miles QTS: CHI1 DC3
18.62 miles QTS: CHI1 DC1
18.64 miles QTS: CHI1 DC2
19.95 miles TierPoint Chicago Polk
19.96 miles First Communications Chicago

CyrusOne: Lombard CHI5 Data Center Photos See all

Lombard Site Floor Plan
Source: CyrusOne
Front of the Facility
Source: CONE

Operating Company

Operated by:

CyrusOne is a data center owner, operator, and developer that manages more than 50 facilities, with its footprint concentrated in the U.S. and Europe. The company is based in Dallas and was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in a transaction valued at approximately 15 billion dollars including debt.

Its portfolio centers on hyperscale and enterprise colocation across multi-building campuses. CyrusOne has also pursued international growth initiatives alongside its core North American and European markets.

CyrusOne History:

  • March 2022: Taken private by funds managed by KKR and Global Infrastructure Partners in an approximately 15 billion dollar all-cash transaction including debt.
  • July 2015: Acquired Cervalis, adding four data centers and two disaster recovery sites in the New York metro.
  • July 2014: Acquired Cervalis
  • January 2013: Completed initial public offering on NASDAQ as a carve-out of Cincinnati Bell’s data center business.
  • June 2010: Cincinnati Bell acquired CyrusOne for approximately 525 million dollars.
  • 2000: Founded by David Ferdman.
0
Facilities
0
Markets

News See all

Read Rolling Meadows Approves Digital Realty's 156MW Data Center Campus
Rolling Meadows backed a tax incentive on Nov. 24 for Digital Realty's 156MW data center, over objections from residents who packed the council chambers. Councilors voted 4-2 to support a Cook Coun...

Rolling Meadows Approves Digital Realty's 156MW Data Center Campus

November 25, 2026 Digital Realty Trust

Rolling Meadows backed a tax incentive on Nov. 24 for Digital Realty's 156MW data center, over objections from residents who packed the council chambers. Councilors voted 4-2 to support a Cook County Class 6b tax break for the project at 3800 Golf Road, CBS Chicago reported. The council also...

Read more
Read CyrusOne and KEP Top Out 48MW OSK1 Data Center in Japan
CyrusOne and Kansai Electric Power Company have [topped out OSK1](https://www.facebook.com/CyrusOne/posts/cyrusone-keps-first-data-center-in-japan-designed-to-deliver-48-mw-of-it-capacit/1631891085...

CyrusOne and KEP Top Out 48MW OSK1 Data Center in Japan

November 20, 2026 CyrusOne

CyrusOne and Kansai Electric Power Company have topped out OSK1, the first data center under their Japanese joint venture, at a planned 48MW of IT capacity. CyrusOne and KEP marked the structural completion this week with a traditional Jōtōshiki ceremony. CyrusOne KEP, the 50:50 joint venture the...

Read more
Read CyrusOne Files Plans for Three-Building, $1.5bn Data Center Campus in Fairfield, Texas
CyrusOne has filed plans for three buildings at a new data center campus in Fairfield, Texas, located adjacent to Calpine’s Freestone natural gas power plant. The project, on FM 488 in Freestone Co...

CyrusOne Files Plans for Three-Building, $1.5bn Data Center Campus in Fairfield, Texas

August 01, 2026 CyrusOne

CyrusOne has filed plans for three buildings at a new data center campus in Fairfield, Texas, located adjacent to Calpine’s Freestone natural gas power plant. The project, on FM 488 in Freestone County, about 90 miles (144.8km) south of Dallas, is part of a 760MW data center development being...

Read more
Read CyrusOne Begins Construction on 380MW Data Center in Texas
CyrusOne has begun construction on a new data center campus in Texas, breaking ground last week in Freestone County, about 90 miles (144 km) south of Dallas. Full details of the planned development...

CyrusOne Begins Construction on 380MW Data Center in Texas

June 08, 2026 CyrusOne

CyrusOne has begun construction on a new data center campus in Texas, breaking ground last week in Freestone County, about 90 miles (144 km) south of Dallas. Full details of the planned development have not yet been disclosed. CyrusOne has partnered with Constellation on a 380MW agreement to...

Read more
Read CyrusOne to Internalize US Data Center Operations
CyrusOne to Internalize US Data Center Operations

CyrusOne to Internalize US Data Center Operations

May 07, 2026 CyrusOne

US data center operator CyrusOne is bringing a significant portion of its on-site operations in-house, ending large sections of its existing outsourcing partnership with JLL. The KKR-owned company confirmed to DCD this week that it is restructuring its US operating model by internalizing on-site...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.