Cogent Naperville

Latest Podcast
40 Shuman Boulevard
Operational
Fully operational facility
Operated by:

Cogent Naperville

Ownership: Cogent Communications does not own the building.
░░░░ Request Dataset MW
Total Power
░░░░░ Login to view SqFt
Gross Colocation Size

Map and Nearby Locations:

40 Shuman Boulevard
Cogent Communications Sites
Nearby Facilities

Sites within 15 miles of Cogent Naperville

Distance Site About
1.33 miles Karis: Naperville, IL
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
2.53 miles Centersquare: Lisle CHI1
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
2.69 miles NetSource Chicago
3.66 miles Summit: Naperville
4.18 miles CloudCenters: Lisle, IL
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
4.34 miles 4267 Meridian Pkwy: Lincoln Rackhouse
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
4.34 miles DataBridge: Aurora, IL
DataBridge Sites is the new name for ESite Systems, a company with two decades of history in the industry.
5.00 miles Edged Energy: Aurora ORD01
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
5.07 miles Edged Energy: Chicago ORD03
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
5.13 miles CyrusOne Chicago Aurora CME
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
5.13 miles Edged Energy: Chicago ORD02
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
5.15 miles DataCanopy: Chicago, IL
5.19 miles CyrusOne: Aurora CHI2
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
5.27 miles CyrusOne: Aurora III (CHI3)
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
5.33 miles CyrusOne: CHI2 DC2
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
5.37 miles CyrusOne: CHI3 DC2
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
6.68 miles CyrusOne: Lombard CHI5
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
7.38 miles SBA Edge: 603 Discovery
Former New Continuum site that was acquired in 2019
7.50 miles Crypto Mining Data Center Request Dataset
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
7.56 miles Connect Data Centers: Chicago
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
7.67 miles 360TCS-Lombard
7.67 miles Digital Fortress: Chicago Lombard
8.83 miles Equinix Chicago CH7
9.54 miles Colovore: Chicago
Colovore is developing a liquid-cooled colocation data center in Chicago, Illinois, with construction expected to be completed in the fourth quarter of 2026.
10.79 miles NYI Chicago (Oak Brook)
10.93 miles Verizon: (Oak Brook)
10.93 miles US Signal Oakbrook IL01
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
10.93 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
11.99 miles LexusNexis Oak Brook
12.00 miles Verizon: Swift Dr
12.00 miles DataBank (ORD4) Oak Brook
13.87 miles Aligned ORD-02
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
13.93 miles Aligned Chicago ORD-01
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
14.14 miles Hyperscale Data Center Request Dataset
14.37 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
14.48 miles NTT: CH3
This facility is a part of NTT's Chicago data center campus in Illinois.
14.56 miles NTT Chicago CH1
NTT acquired its Chicago site in 2018 through its RagingWire subsidiary. Launched in 2021, the first two-story data center, CH1, spans 126,000 sq ft (11,705 sqm) of data floor space.
14.63 miles NTT: CH2
This facility is a part of NTT's Chicago data center campus in Illinois.
14.69 miles NTT: Chicago CH4
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
14.73 miles NTT: Chicago CH5
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
14.78 miles T5: Chicago lll
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
14.86 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
15.05 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
15.12 miles Lumen Broadview
15.23 miles CyrusOne: Wood Dale CHI6
CyrusOne is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
15.29 miles Nexstar: Elk Grove Bldg 2
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
15.29 miles Nexstar: Elk Grove
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
15.33 miles Nexstar: Elk Grove Bldg 3
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
15.40 miles Nexstar: Elk Grove Bldg 4
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
15.75 miles DigiCo: Chicago
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
16.09 miles 1450 E Devon Ave (CH3) DRT
16.17 miles Digital Elk Grove Village Campus
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
16.17 miles HostPapa CH1
Formerly known as "ColoCrossing CH1"
16.17 miles Deft: Elk Grove DF-CH1
16.17 miles Rackspace Elk Grove ORD1
16.20 miles Centersquare: Chicago ORD2
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
16.21 miles 2200 Busse Rd (CH1) DRT
16.28 miles 2299 Busse (CH2) Digital Realty
16.48 miles Hyperscale Data Center Request Dataset
16.56 miles Stream Chicago II
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
16.77 miles Equinix Chicago CH3
16.77 miles STACK CHI01B
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
16.81 miles STACK Chicago CHI01
16.82 miles Equinix: CH5
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
16.85 miles EdgeConneX CHI02
16.87 miles EdgeConneX CHI01
16.91 miles Digital Realty: ORD15
In 2017, Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
16.93 miles EdgeConneX: CHI03
EdgeConneX CHI03 is a new 167,000-square-foot, two-story data center building on its Elkgrove campus near Chicago.
16.94 miles Digital Realty: Franklin Park Expansion
Digital Realty acquired two land parcels near their existing Franklin Park campus in separate transactions on July 2025, for a total of approximately $18 million.
16.95 miles Stream Chicago I
Free-Standing, Data Center Designed to Tier III Standards
16.98 miles Digital Realty: ORD13
17.00 miles Digital Realty: Chicago ORD12
17.01 miles Tierpoint Chicago West
17.03 miles Digital Realty: ORD14
17.07 miles Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
17.40 miles Stream: Chicago III DC3
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
17.44 miles TA Realty: Elk Grove
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
17.44 miles Stack: CHI02
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
17.49 miles T5 Chicago II
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
17.52 miles Stream: Chicago III DC2
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
17.57 miles Hyperscale Data Center Request Dataset
The 37-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
17.59 miles Stream: Chicago III
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
17.65 miles Hyperscale Data Center Request Dataset
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
17.69 miles Hyperscale Data Center Request Dataset
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
17.74 miles T5: Chicago V
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
17.82 miles Prime: ORD01-02
Building B will be another three-story construction, offering 279,360 gross square feet of space.
17.84 miles Prime Elk Grove
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
17.88 miles Complete Source Schaumburg
17.91 miles Prime: ORD01-03
Building C will be another three-story construction, offering 294,429 gross square feet of space.
17.95 miles Aligned: ORD-03
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
18.04 miles Aligned: ORD-04
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
18.20 miles Project Cardinal
Pioneer Development, LLC has filed an application for Project Cardinal, a sprawling data center campus planned for over 1,000 acres in Yorkville, Kendall County.
18.46 miles Project Cardinal Expansion
18.53 miles CenturyLink: Arlington Heights
18.57 miles Prologis: Project Steel
Project Steel involves developing a 540-acre campus featuring 24 two-story data center buildings, totaling over 9 million square feet (836,125 sqm), along with three substations.
18.64 miles Prologis: Project Steel Expansion
18.71 miles CloudHQ: Mount Prospect ORD1
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
18.78 miles CloudHQ: Mount Prospect ORD2
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
18.83 miles Hyperscale Data Center Request Dataset
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
18.83 miles Hyperscale Data Center Request Dataset
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
18.87 miles CloudHQ Mount Prospect ORD3
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
18.91 miles Hyperscale Data Center Request Dataset
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
19.03 miles Hyperscale Data Center Request Dataset
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
19.07 miles CyrusOne: Yorkville 8
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
19.11 miles CyrusOne: Yorkville 9
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
19.14 miles Compass Hoffman Estates
Located in Cook County, the campus will feature five buildings and represents a total planned investment of $10 billion.
19.21 miles Karis: Hoffman Estates Campus
Karis Critical purchased 180 acres of land in the Hoffman Estates area from 5a7 for $45 million.
19.21 miles CyrusOne: Yorkville 7
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
19.25 miles CyrusOne: Yorkville 6
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
19.33 miles Karis: Hoffman 2
This planned facility would be part of Karis Critical's Hoffman Estates Campus in Chicago, Illinois.
19.36 miles CyrusOne: Yorkville 5
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
19.43 miles Hyperscale Data Center Request Dataset
Microsoft acquired 500 acres of land around Eldamain and Corneils roads from three landowners in Plano, Illinois.
19.47 miles CyrusOne: Yorkville 4
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
19.53 miles CyrusOne: Yorkville 3
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
19.58 miles CyrusOne: Yorkville 2
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
19.67 miles Iron Mountain Chicago
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
19.71 miles CyrusOne: Yorkville Campus
CyrusOne is building a huge data center campus on 228 acres in Kendall County outside of Chicago, Illinois. The data center campus will have up to nine (9) two-story buildings and a centralized 800,000-square-foot electric substation.

Cogent Naperville Data Center Photos (See all)

Operating Company

Operated by:

Quick Facts:


  • Founded in 1999; publicly traded company (NASDAQ: CCOI).
  • Headquartered in Washington, DC.
  • Serves 190 markets in North America, Europe and Asia
  • Provides Internet access, Ethernet transport and colocation services.

Cogent Network


  • 2,125 On-Net buildings
    • 69% multi-tenant office buildings
    • 31% carrier neutral and Cogent data centers
  • 50 Cogent data centers with 550,000+ square feet
  • 610+ metro networks; 27,200+ metro fiber miles
  • 59,000+ intercity fiber route miles
  • Long-haul capacity up to 580 Gbps
  • Transatlantic capacity over 800 Gbps across multiple cables/routes Interconnected with 5,270+ different networks

Acquisition History

Although debuting at the height of the telecom industry, Cogent soon found vast market wealth eradicated and many other ISPs thrown into a state of turmoil. In a survival of the fittest competition, Cogent became the consolidator in a consolidating market. Over three brief years, Cogent completed 13 acquisitions of other flailing providers. Whether it was an entire company or just select assets, Cogent was able to acquire valuable network assets, customers, peering relationships and building access agreements for pennies on the dollar.

Among Cogent's 13 acquisitions to date include three of the original generation Internet Service Providers who were pioneers in the late 1980s and early 1990s. These companies—PSINet (originally Performance Systems International), NetRail and Aleron (originally AGIS/Net99)—were the earliest providers of commercial Internet service.

Other strategic acquisitions include assets from: Allied Riser, OnSite Access, Fiber City, Fiber Network Solutions, Applied Theory, LambdaNet France and Spain, Carrier1, Unlimited Fiber Optics, Global Access, Aleron, NTT/Verio.

46
Facilities
20
Markets
36MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?