Edged Opens 36MW Data Center in Phoenix, Arizona
April 08, 2026
Edged Energy
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
| Distance | Site | About |
|---|---|---|
| 0.13 miles | Edged Energy: Chicago ORD02 |
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
|
| 0.21 miles | CyrusOne: Aurora III (CHI3) |
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
| 0.24 miles | Edged Energy: Aurora ORD01 |
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
|
| 0.33 miles | CyrusOne: CHI3 DC2 |
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
| 0.47 miles | DataCanopy: Chicago, IL | |
| 0.48 miles | CyrusOne: Aurora CHI2 |
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
|
| 0.49 miles | CyrusOne Chicago Aurora CME |
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
|
| 0.63 miles | CyrusOne: CHI2 DC2 |
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
|
| 2.47 miles | NetSource Chicago | |
| 2.54 miles | 4267 Meridian Pkwy: Lincoln Rackhouse |
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
|
| 2.55 miles | DataBridge: Aurora, IL |
DataBridge Sites is the new name for ESite Systems, a company with two decades of history in the industry.
|
| 4.04 miles | Crypto Mining Data Center Request Dataset |
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
|
| 5.00 miles | Colovore: Chicago |
Colovore is developing a liquid-cooled colocation data center in Chicago, Illinois, with construction expected to be completed in the fourth quarter of 2026.
|
| 5.00 miles | SBA Edge: 603 Discovery |
Former New Continuum site that was acquired in 2019
|
| 5.07 miles | Cogent Naperville | |
| 5.86 miles | Summit: Naperville | |
| 6.31 miles | Karis: Naperville, IL |
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
|
| 7.59 miles | Centersquare: Lisle CHI1 |
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
|
| 9.25 miles | CloudCenters: Lisle, IL |
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
|
| 9.87 miles | Connect Data Centers: Chicago |
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
|
| 11.39 miles | CyrusOne: Lombard CHI5 |
9 MW of critical capacity
Both a 1.5MW and a 2MW transformer
|
| 12.46 miles | 360TCS-Lombard | |
| 12.46 miles | Digital Fortress: Chicago Lombard | |
| 13.52 miles | Project Cardinal |
Pioneer Development, LLC has filed an application for Project Cardinal, a sprawling data center campus planned for over 1,000 acres in Yorkville, Kendall County.
|
| 13.74 miles | Project Cardinal Expansion | |
| 13.89 miles | Equinix Chicago CH7 |
|
| 13.95 miles | Prologis: Project Steel |
Project Steel involves developing a 540-acre campus featuring 24 two-story data center buildings, totaling over 9 million square feet (836,125 sqm), along with three substations.
|
| 14.05 miles | Prologis: Project Steel Expansion | |
| 14.73 miles | CyrusOne: Yorkville 8 |
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
| 14.78 miles | CyrusOne: Yorkville 9 |
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
| 14.86 miles | CyrusOne: Yorkville 7 |
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
| 14.91 miles | CyrusOne: Yorkville 6 |
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
| 14.94 miles | Hyperscale Data Center Request Dataset |
Microsoft acquired 500 acres of land around Eldamain and Corneils roads from three landowners in Plano, Illinois.
|
| 15.02 miles | CyrusOne: Yorkville 5 |
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
| 15.13 miles | CyrusOne: Yorkville 4 |
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
| 15.16 miles | CyrusOne: Yorkville 3 |
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
| 15.22 miles | CyrusOne: Yorkville 2 |
This data center is a part of CyrusOne's Little Rock Township Campus in Illinois.
|
| 15.34 miles | CyrusOne: Yorkville Campus |
CyrusOne is building a huge data center campus on 228 acres in Kendall County outside of Chicago, Illinois. The data center campus will have up to nine (9) two-story buildings and a centralized 800,000-square-foot electric substation.
|
| 15.73 miles | NYI Chicago (Oak Brook) | |
| 15.86 miles | Verizon: (Oak Brook) | |
| 15.86 miles | US Signal Oakbrook IL01 |
800a 480V 3 phase
450kW diesel generator with 24 hour run time at full load
500kVa UPS capacity with battery backup
|
| 15.86 miles | Server Farm Oak Brook |
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
|
| 16.60 miles | Savion: Plano, Illinois |
Savion, the company developing the massive 250MW Plano Skies Energy Center solar project in Kendall County, Illinois, is now proposing to add a large data center campus to the development.
|
| 16.89 miles | Savion: Plano Expansion | |
| 16.90 miles | LexusNexis Oak Brook | |
| 16.90 miles | Verizon: Swift Dr |
|
| 16.90 miles | DataBank (ORD4) Oak Brook |
|
| 17.47 miles | NTT: CH3 |
This facility is a part of NTT's Chicago data center campus in Illinois.
|
| 17.56 miles | NTT Chicago CH1 |
NTT acquired its Chicago site in 2018 through its RagingWire subsidiary. Launched in 2021, the first two-story data center, CH1, spans 126,000 sq ft (11,705 sqm) of data floor space.
|
| 17.61 miles | NTT: CH2 |
This facility is a part of NTT's Chicago data center campus in Illinois.
|
| 17.70 miles | NTT: Chicago CH4 |
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
|
| 17.72 miles | Nexstar: Elk Grove |
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
|
| 17.73 miles | NTT: Chicago CH5 |
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
|
| 17.75 miles | Nexstar: Elk Grove Bldg 2 |
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
| 17.82 miles | Nexstar: Elk Grove Bldg 3 |
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
| 17.83 miles | Nexstar: Elk Grove Bldg 4 |
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
| 18.31 miles | Aligned ORD-02 |
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
|
| 18.37 miles | Aligned Chicago ORD-01 |
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
|
| 18.39 miles | Element Critical CH2 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
| 18.50 miles | Hyperscale Data Center Request Dataset |
|
| 18.57 miles | Element Critical CH1 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
| 18.69 miles | Compass Hoffman Estates |
Located in Cook County, the campus will feature five buildings and represents a total planned investment of $10 billion.
|
| 18.74 miles | CyrusOne: Wood Dale CHI6 |
CyrusOne is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
|
| 18.77 miles | 505 N Railroad Ave - Digital Realty |
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
| 18.99 miles | DigiCo: Chicago |
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
|
| 19.03 miles | T5: Chicago lll |
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
|
| 19.21 miles | Karis: Hoffman Estates Campus |
Karis Critical purchased 180 acres of land in the Hoffman Estates area from 5a7 for $45 million.
|
| 19.30 miles | Karis: Hoffman 2 |
This planned facility would be part of Karis Critical's Hoffman Estates Campus in Chicago, Illinois.
|
| 19.42 miles | 1450 E Devon Ave (CH3) DRT | |
| 19.51 miles | Digital Elk Grove Village Campus |
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
|
| 19.51 miles | Deft: Elk Grove DF-CH1 |
|
| 19.51 miles | HostPapa CH1 |
Formerly known as "ColoCrossing CH1"
|
| 19.52 miles | Rackspace Elk Grove ORD1 | |
| 19.55 miles | 2200 Busse Rd (CH1) DRT | |
| 19.55 miles | Hyperscale Data Center Request Dataset |
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
|
| 19.57 miles | Complete Source Schaumburg | |
| 19.60 miles | Centersquare: Chicago ORD2 |
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
|
| 19.61 miles | Hyperscale Data Center Request Dataset |
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|
| 19.63 miles | Hyperscale Data Center Request Dataset |
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
|
| 19.66 miles | 2299 Busse (CH2) Digital Realty |
|
| 19.67 miles | Hyperscale Data Center Request Dataset | |
| 19.79 miles | Hyperscale Data Center Request Dataset |
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|
| 19.89 miles | Stream Chicago II |
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
|
| 19.96 miles | STACK CHI01B |
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
|
April 08, 2026
Edged Energy
January 17, 2026
Edged Energy
November 21, 2025
Edged Energy
September 24, 2025
Edged Energy
August 08, 2025
Edged Energy
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas