Digital Realty: ORD12

Latest Podcast 9333 Grand Ave
Operational
Fully operational facility
Operated by:

Digital Realty: ORD12

Short Code: ORD12
Lot Size: 40 acres

Sites leasing space from Digital Realty Trust:

░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Map and Nearby Locations

9333 Grand Ave
Digital Realty Trust Sites
Nearby Facilities

Sites within 15 miles of Digital Realty: ORD12

Distance Site About
0.04 miles Digital Realty: ORD14
0.05 miles Digital Realty: ORD13
0.12 miles Digital Realty: ORD15
In 2017, Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
0.12 miles Tierpoint Chicago West
0.19 miles Digital Realty: Franklin Park Expansion
Digital Realty acquired two land parcels near their existing Franklin Park campus in separate transactions on July 2025, for a total of approximately $18 million.
2.78 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
2.95 miles T5: Chicago lll
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
3.06 miles EastInterested in this information?Contact us
3.15 miles Aligned: ORD-01
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
3.20 miles Aligned: ORD-02
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
5.11 miles Lumen Broadview
5.77 miles Iron Mountain Chicago
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
6.05 miles DataBank (ORD4) Oak Brook
6.05 miles Verizon: Swift Dr
6.05 miles LexusNexis Oak Brook
6.29 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.31 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
6.31 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
6.62 miles TA Realty: Elk Grove
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
6.70 miles Centersquare: Chicago ORD2
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
6.82 miles 2299 Busse (CH2) Digital Realty
6.85 miles EdgeConneX CHI01
CHI01 is EdgeConneX's first Chicago data center, a 132,000 sq ft retrofit at 1800 Nicholas Blvd in Elk Grove Village, Illinois.
6.91 miles EdgeConneX: CHI03
EdgeConneX CHI03 is a new 167,000 sq ft, two-story data center building on its Elk Grove Village campus near Chicago.
6.95 miles EdgeConneX CHI02
6.96 miles Rackspace Elk Grove ORD1
6.98 miles HostPapa CH1
Formerly known as "ColoCrossing CH1"
6.98 miles Deft: Elk Grove DF-CH1
6.98 miles Stream Chicago I
Free-Standing, Data Center Designed to Tier III Standards
6.99 miles Equinix: CH5
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
7.01 miles 2200 Busse Rd (CH1) DRT
7.02 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
7.02 miles US Signal Oakbrook IL01
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
7.02 miles Verizon: (Oak Brook)
7.02 miles Equinix Chicago CH3
Equinix CH3 is a three-story colocation data center at 1905 Lunt Avenue in Elk Grove Village, Illinois, that Equinix opened in 2007 and expanded in five more phases through 2020.
7.04 miles T5: Chicago V
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
7.05 miles Stream Chicago II
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
7.07 miles 1400 E Devon Ave (CH3) DRT
7.16 miles NYI Chicago (Oak Brook)
7.44 miles DigiCo: Chicago
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
7.45 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.51 miles Stream: Chicago ORDC2
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
7.64 miles Stream: Chicago ORDC3
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
7.64 miles Stack: CHI01A
Single-story data center at 1441 Touhy Avenue in Elk Grove Village. Forsythe Technology broke ground on it in 2014, T5 bought it in 2016, and IPI Partners made it part of STACK. It adjoins CHI01B on a shared 14-acre parcel.
7.71 miles EdgeConneX: CHI04
CHI04 is a two-story, 164,000 sq ft EdgeConneX data center under construction at 901 Busse Road in Elk Grove Village, Illinois, near O'Hare Airport.
7.72 miles Stack: CHI01B
Two-story data center at 1301 Touhy Avenue, built by STACK next to CHI01A on the same parcel, with four data halls and diverse underground ComEd feeds.
7.72 miles CoreWeave: US Central ORD1
7.81 miles EdgeConneX: CHI05
CHI05 is EdgeConneX's planned second data center on Busse Road in Elk Grove Village, Illinois, on the parcel next to CHI04.
7.88 miles Stack: CHI02
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
8.34 miles NTT: Chicago CH5
CH5 is a planned three-story data center on the former Marino Court subdivision east of Arlington Heights Road, the fifth and final building on NTT's Itasca campus.
8.37 miles Prime: ORD01-01
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
8.44 miles Prime: ORD01-03
Building C will be another three-story construction, offering 294,429 gross square feet of space.
8.45 miles Prime: ORD01-02
Building B will be another three-story construction, offering 279,360 gross square feet of space.
8.56 miles NTT: Chicago CH4
CH4 is a planned data center at 1200 N. Arlington Heights Road on NTT's Itasca campus, on the site of two office buildings NTT bought and cleared.
8.59 miles CenturyLink: Arlington Heights
8.63 miles NTT: Chicago CH3
CH3 is a data center under construction at 235 Pierce Road on NTT's Itasca campus in Itasca, Illinois, with four data vaults.
8.63 miles NTT: Chicago CH1
The first building on NTT's Itasca campus: a two-story data center at 255 Pierce Road with six data vaults and four primary 34.5 kV ComEd feeds plus one alternate.
8.67 miles NTT: Chicago CH2
CH2 is a two-story data center at 275 Pierce Road on NTT's Itasca campus in Itasca, Illinois, with six data halls.
8.73 miles CloudHQ: ORD2
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
8.74 miles Plaza OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.78 miles Center ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.83 miles T5 Chicago II
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
8.86 miles CloudHQ: ORD1
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
8.86 miles CloudHQ: ORD3
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
8.86 miles ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.11 miles MicroLink: Chicago, IL
MicroLink is planning to build a data center in Chicago, Illinois.
9.43 miles Digital Fortress: Chicago Lombard
9.43 miles 360TCS-Lombard
9.60 miles Aligned: ORD-04
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
9.67 miles Aligned: ORD-03
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
9.91 miles Equinix Chicago CH7
Equinix CH7 is a single-story colocation data center at 111 Plaza Drive in Westmont, Illinois, built in 1999 and acquired from Verizon, where it was ORD1, in 2017.
10.32 miles CyrusOne: Lombard CHI5
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
10.49 miles Metro Edge: Illinois Medical District (IMD)
Commercial real estate investment firm Metro Edge Development is building a data center in Chicago, Illinois.
10.53 miles H5: Chicago
10.53 miles Nexstar: Elk Grove Bldg3
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
10.63 miles Nexstar: Elk Grove Bldg2
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
10.72 miles Nexstar: Elk Grove Bldg4
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
10.73 miles Nexstar: Elk Grove Bldg1
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
10.76 miles Apotech: Illinois 1
Apotech Group operates its Illiois 1 data center facility in the Chicago market, situated at 1331 E Business Center Drive. This facility is a retrofitted structure, encompassing 32,000 square feet of space.
10.78 miles DataBank ORD3 Mount Prospect
10.78 miles Colocation America CH3
11.23 miles Lumen Chicago 2
11.31 miles Lumen Chicago 4
11.40 miles QTS: CHI1 DC3
QTS plans to build another data center building on its Chicago Campus.
11.47 miles QTS: CHI1 DC2
QTS is developing 366,000 sq ft (34,000 sqm) of data center space across three stories, alongside 80,000 sq ft (7,432 sqm) of office and loading areas in its Chicago Campus.
11.52 miles QTS: CHI1 DC1
The campus was a former Sun Times Press Facility and was acquired in 2014
11.73 miles Lumen Chicago 1
11.73 miles EXA - 111 North Canal
Former GTT suite
11.80 miles TierPoint Chicago Polk
11.81 miles First Communications Chicago
11.88 miles Lumen Chicago 6
11.96 miles Server Farm Realty 840 South Canal
4 MW Critical Load on Each Floor (Floors 1-5) 130-160 Watts per Raised Floor SF
11.96 miles DataBank (ORD2) 840 S Canal
11.99 miles Igor Gabal: Chicago, IL
Local real estate developer Igor Gabal in partnership with Strategic Value Partners, is advancing a project to convert a portion of the historic 300 West Adams Building in downtown Chicago into a data center.
12.00 miles Lumen Chicago 3
12.08 miles Cogent: 216 W Jackson
12.12 miles CoreSite Chicago CH2
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
12.23 miles Legacy: Chicago Byte Exchange CBE1
An affiliate of real estate firm Prime Group bought an office building in Chicago from options exchange company Cboe Global Markets for $12 million.
12.25 miles Netrality Chicago: 717 S Wells
The 10 story building was constructed in 1923 and eventually was converted into a data center.
12.25 miles Crown Castle 725 S Wells
12.26 miles 725 S Wells - 1547 Critical Systems
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
12.27 miles QuadraNet Chicago
12.27 miles 365 Chicago
The site is a former Switch and Data site (also owned by Equinix for a short period.)
12.27 miles CoreSite Chicago CH1
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
12.27 miles Cogent: 427 S LaSalle
12.28 miles Verizon: 140 S Dearborn
12.38 miles Colocation America CH2
12.38 miles Cogent: 600 S Federal
12.38 miles Lumen Chicago 5
12.38 miles Digital Realty: Chicago ORD11
12.38 miles DataBank (ORD1) 600 S Federal
13.21 miles Connect Data Centers: Chicago
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
13.42 miles Centersquare: Chicago ORD1(B, C & D)
Digital Realty Trust owns the building at 350 Cermak and is CTL's Landlord.
13.42 miles Steadfast Chicago 350 E Cermak
13.42 miles Centersquare: Chicago ORD1
Centersquare's ORD1 site is located in the heart of the Chicago Financial District on the 7th floor of an 8-story building on a fiber-linked campus.
13.42 miles Equinix Chicago CH1, CH2, & CH4
Equinix distinctly separates CH1, CH2, and CH4 into separate data centers, but in reality, the sites are in the same building.
13.42 miles Colocation America CH1
13.42 miles Digital Realty: ORD10
Digital Realty acquired the colocation services business of Hivelocity in 2025.
13.43 miles Deft: Downtown CH1
13.65 miles CloudCenters: Lisle, IL
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
13.93 miles Complete Source Schaumburg
14.92 miles Centersquare: Lisle CHI1
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
15.23 miles 1547 Chicago Midway Technology Centre
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
15.68 miles Karis: Naperville, IL
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
17.00 miles Cogent Naperville
17.09 miles Karis: Naperville (INEOS)
Real estate developer Karis Critical is in early-stage exploratory discussions to potentially acquire the 168-acre former BP/INEOS campus at in Naperville, Illinois, within the Suburban Chicago market.
17.51 miles Plaza BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.57 miles Plaza PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.57 miles Campus OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.62 miles EdgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.09 miles NetSource Chicago
19.49 miles Summit: Naperville
19.60 miles Colovore: West Chicago ORD02
ORD02 is Colovore's second Chicago-area facility, located in West Chicago and extending the company's distributed footprint across the metro. The liquid-cooled, HVDC-ready site is under construction and pre-leasing for edge AI and high-performance colocation workloads.

Digital Realty: ORD12 Data Center Photos See all

9333 Grand: Floor Plan showing 6 Pods (60' x 250' each)
Source: Baxtel

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) wants to build its first [Indiana](https://baxtel.com/regions/indiana) data centers in Kokomo, proposing a three-building camp...

Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana

October 17, 2026 Digital Realty Trust

Digital Realty wants to build its first Indiana data centers in Kokomo, proposing a three-building campus with roughly 1GW of IT capacity on 476 acres of greenfield land. The global REIT published a project page for the development after city officials confirmed its interest earlier this month,...

Read more
Read Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site...

Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

October 16, 2026 Digital Realty Trust

Digital Realty is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site plan that calls for roughly 1GW of IT capacity and completion in 2033. The company published the details on its Kokomo project page, and Kokomo Mayor Tyler...

Read more
Read Digital Realty Completes Structural Topping-Out of Second Seoul Data Center
Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027.

“The topping out isn't just a constr...

Digital Realty Completes Structural Topping-Out of Second Seoul Data Center

October 15, 2026 Digital Realty Trust

Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027. “The topping out isn't just a construction milestone; it's a powerful symbol of what happens when incredible teams come together to build...

Read more
Read Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the com...

Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus

October 10, 2026 Digital Realty Trust

Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...

Read more
Read Digital Realty Starts Construction of KIX15 Data Center in Japan
Digital Realty’s KIX15 data center will add 24MW of capacity to its KIX Campus in Ibaraki City, Osaka Prefecture, Japan. Developed by MC Digital Realty, a 50/50 joint venture between Digital Realty...

Digital Realty Starts Construction of KIX15 Data Center in Japan

October 09, 2026 Digital Realty Trust

Digital Realty’s KIX15 data center will add 24MW of capacity to its KIX Campus in Ibaraki City, Osaka Prefecture, Japan. Developed by MC Digital Realty, a 50/50 joint venture between Digital Realty and Mitsubishi Corporation, KIX15 will be the campus’s fifth building. Operations are expected to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?