0.00 miles
|
4267 Meridian Pkwy: Lincoln Rackhouse
|
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
|
|
0.01 miles
|
DataBridge: Aurora, IL
|
DataBridge Sites is the new name for ESite Systems, a company with two decades of history in the industry.
|
|
0.09 miles
|
Colovore: ORD03
|
Colovore's third Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Two-hall design with service dates in 2028.
|
|
0.09 miles
|
Colovore: ORD04
|
Colovore's fourth Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus, adjacent to the company's ORD01 site. Two-hall design with service dates in late 2028 and early 2029.
|
|
0.17 miles
|
Colovore: ORD01
|
Colovore's first Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Single data hall slated for service in late 2026.
|
|
2.16 miles
|
CyrusOne: Aurora CME (CHI1)
|
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
|
|
2.19 miles
|
DataCanopy: Chicago, IL
|
|
|
2.21 miles
|
CyrusOne: CHI2 DC1
|
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
|
|
2.22 miles
|
CyrusOne: CHI2 DC2
|
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
|
|
2.54 miles
|
Edged Energy: Chicago ORD03
|
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
|
|
2.60 miles
|
CyrusOne: CHI3 DC1
|
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
|
2.61 miles
|
CyrusOne: CHI3 DC2
|
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
|
2.67 miles
|
Edged Energy: Chicago ORD02
|
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
|
|
2.70 miles
|
Edged Energy: Aurora ORD01
|
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
|
|
2.90 miles
|
NetSource Chicago
|
|
|
3.59 miles
|
Summit: Naperville
|
|
|
4.30 miles
|
Karis: Naperville (INEOS)
|
Real estate developer Karis Critical is in early-stage exploratory discussions to potentially acquire the 168-acre former BP/INEOS campus at in Naperville, Illinois, within the Suburban Chicago market.
|
|
4.34 miles
|
Cogent Naperville
|
|
|
5.67 miles
|
Karis: Naperville, IL
|
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
|
|
6.55 miles
|
Hut 8: Batavia, IL
|
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
|
|
6.63 miles
|
Centersquare: Lisle CHI1
|
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
|
|
7.34 miles
|
Colovore: West Chicago ORD02
|
ORD02 is Colovore's second Chicago-area facility, located in West Chicago and extending the company's distributed footprint across the metro. The liquid-cooled, HVDC-ready site is under construction and pre-leasing for edge AI and high-performance colocation workloads.
|
|
7.36 miles
|
SBA Edge: 603 Discovery
|
Former New Continuum site that was acquired in 2019
|
|
8.20 miles
|
CloudCenters: Lisle, IL
|
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
|
|
10.91 miles
|
Connect Data Centers: Chicago
|
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
|
|
11.02 miles
|
CyrusOne: Lombard CHI5
|
9 MW of critical capacity
Both a 1.5MW and a 2MW transformer
|
|
11.99 miles
|
360TCS-Lombard
|
|
|
11.99 miles
|
Digital Fortress: Chicago Lombard
|
|
|
12.89 miles
|
Equinix Chicago CH7
|
|
|
13.17 miles
|
Pioneer: Project Cardinal Expansion
|
The other 13 planned buildings of Pioneer Development's Project Cardinal campus in Yorkville, Illinois, built in northeast, south and west phases after the first building.
|
|
13.18 miles
|
Pioneer: Project Cardinal 1
|
First building of the northeast phase of Pioneer Development's Project Cardinal campus in Yorkville, Illinois. Planned as a two-story data center of about 1.36 million sq ft beside the campus ComEd switchyard and customer substation.
|
|
14.02 miles
|
Prologis: Project Steel 1
|
Phase 1 of Prologis's Project Steel campus in Yorkville: four two-story data center buildings of about 425,000 sq ft each and two substations, east of the ComEd corridor off Corneils and Beecher roads. Construction is planned to start in 2027.
|
|
14.19 miles
|
Prologis: Project Steel Expansion
|
Future Phases 2 and 3 of Prologis's Project Steel campus in Yorkville, Illinois: twelve two-story buildings and two substations at Galena and Eldamain roads, planned over the 2030s and 2040s.
|
|
14.68 miles
|
Green Door: Yorkville Hagemann
|
Green Door Capital land-bank data center tract of about 138 acres on Eldamain Road in Yorkville, Illinois, held by Yorkville Nexus III LLC. Annexed and rezoned M-2 in 2024; no end user or site plan has been filed. Borders Prologis Project Steel near ComEd's Plano substation.
|
|
14.76 miles
|
CyrusOne: Yorkville 8
|
Building 11H of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft on the campus's east edge along Beecher Road.
|
|
14.78 miles
|
CyrusOne: Yorkville 9
|
Former ninth building of CyrusOne's 2024 Yorkville Technology Campus plan in Yorkville, Illinois. CyrusOne cut the campus to eight buildings in 2026, so this building is no longer planned.
|
|
14.94 miles
|
CyrusOne: Yorkville 7
|
Building 11G of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the east end of the south row, south of the on-site substation.
|
|
15.01 miles
|
Green Door: Yorkville 50 Acres
|
Green Door Capital land-bank data center tract of about 50 acres at Eldamain and Corneils roads in Yorkville, Illinois, held by Yorkville Nexus LLC. Zoned M-2 for data center use; no end user or site plan has been filed. Lies just north of CyrusOne's Yorkville campus.
|
|
15.04 miles
|
NYI Chicago (Oak Brook)
|
|
|
15.08 miles
|
CyrusOne: Yorkville 4
|
Building 11D of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the campus's middle row, just west of the on-site substation.
|
|
15.13 miles
|
CyrusOne: Yorkville 6
|
Building 11F of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the middle of the campus's south row.
|
|
15.14 miles
|
CyrusOne: Yorkville 2
|
Building 11B of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 129,000 sq ft, the campus's smallest building, beside Building 11A in the northwest section.
|
|
15.18 miles
|
Verizon: (Oak Brook)
|
|
|
15.18 miles
|
US Signal Oakbrook IL01
|
800a 480V 3 phase
450kW diesel generator with 24 hour run time at full load
500kVa UPS capacity with battery backup
|
|
15.18 miles
|
Server Farm Oak Brook
|
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
|
|
15.19 miles
|
Green Door: Yorkville Kelaka
|
Green Door Capital land-bank data center tract of about 154 acres south of Faxon Road in Yorkville, Illinois, held by Yorkville Nexus IV LLC. Yorkville approved its annexation and rezoning; no end user or site plan has been filed. Lies just south of CyrusOne's Yorkville campus.
|
|
15.22 miles
|
CyrusOne: Yorkville 1
|
Building 11A of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the campus's northwest section. CyrusOne plans to build it first.
|
|
15.26 miles
|
CyrusOne: Yorkville 3
|
Building 11C of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the west end of the campus's middle row.
|
|
15.30 miles
|
CyrusOne: Yorkville 5
|
Building 11E of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the west end of the campus's south row, near Faxon Road.
|
|
15.51 miles
|
Central RidgeInterested in this information?Contact us
|
Microsoft owns about 506 acres west of Eldamain Road at Corneils Road in Plano, Illinois, bought from three landowners in April 2024. Plano annexed and rezoned the land for a data center campus in 2024. Microsoft paused the project in June 2025.
|
|
16.16 miles
|
WhiteRose: South Elgin, IL
|
Whiterose Partners LLC is proposing a 200,000-square-foot data center on nine acres in South Elgin, Illinois, located roughly 40 miles west of Chicago.
|
|
16.26 miles
|
LexusNexis Oak Brook
|
|
|
16.26 miles
|
DataBank (ORD4) Oak Brook
|
|
|
16.26 miles
|
Verizon: Swift Dr
|
|
|
16.85 miles
|
Savion: Plano 1
|
Plano 1 is the first building in Savion's proposed data center campus beside the Plano Skies Energy Center north of Plano, Illinois.
|
|
17.16 miles
|
Savion: Plano Expansion
|
|
|
18.20 miles
|
Aligned: ORD-02
|
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
|
|
18.26 miles
|
Aligned: ORD-01
|
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
|
|
18.32 miles
|
NTT: Chicago CH3
|
CH3 is a data center under construction at 235 Pierce Road on NTT's Itasca campus in Itasca, Illinois, with four data vaults.
|
|
18.41 miles
|
NTT: Chicago CH1
|
The first building on NTT's Itasca campus: a two-story data center at 255 Pierce Road with six data vaults and four primary 34.5 kV ComEd feeds plus one alternate.
|
|
18.46 miles
|
NTT: Chicago CH2
|
CH2 is a two-story data center at 275 Pierce Road on NTT's Itasca campus in Itasca, Illinois, with six data halls.
|
|
18.54 miles
|
NTT: Chicago CH4
|
CH4 is a planned data center at 1200 N. Arlington Heights Road on NTT's Itasca campus, on the site of two office buildings NTT bought and cleared.
|
|
18.55 miles
|
Campus PrimeInterested in this information?Contact us
|
|
|
18.67 miles
|
NTT: Chicago CH5
|
CH5 is a planned three-story data center on the former Marino Court subdivision east of Arlington Heights Road, the fifth and final building on NTT's Itasca campus.
|
|
18.70 miles
|
505 N Railroad Ave - Digital Realty
|
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
|
18.85 miles
|
Nexstar: Elk Grove Bldg1
|
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
|
|
18.86 miles
|
Nexstar: Elk Grove Bldg2
|
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
|
18.92 miles
|
Nexstar: Elk Grove Bldg3
|
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
|
18.95 miles
|
Element Critical CH2
|
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
|
18.96 miles
|
Nexstar: Elk Grove Bldg4
|
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
|
19.09 miles
|
T5: Chicago lll
|
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
|
|
19.13 miles
|
Element Critical CH1
|
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
|
19.31 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Carrier-Neutral Operator is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
|
|
19.33 miles
|
Lumen Broadview
|
|
|
19.72 miles
|
DigiCo: Chicago
|