CloudHQ to Begin Constructing 276MW Data Center in Germany Next Year
December 15, 2025
CloudHQ
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois, a town located approximately 20 miles northwest of downtown Chicago.
| Distance | Site | About |
|---|---|---|
| 0.13 miles | CloudHQ Mount Prospect ORD3 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
| 0.18 miles | CloudHQ: Mount Prospect ORD1 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
| 0.25 miles | CenturyLink: Arlington Heights | |
| 0.87 miles | Prime: ORD01-03 |
Building C will be another three-story construction, offering 294,429 gross square feet of space.
|
| 0.94 miles | Prime Elk Grove |
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
|
| 0.96 miles | Prime: ORD01-02 |
Building B will be another three-story construction, offering 279,360 gross square feet of space.
|
| 1.23 miles | Hyperscale Data Center Request Dataset |
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
| 1.24 miles | Hyperscale Data Center Request Dataset |
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
| 1.31 miles | Hyperscale Data Center Request Dataset |
The 37-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
| 1.37 miles | Stream: Chicago III |
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
| 1.43 miles | T5 Chicago II |
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
|
| 1.44 miles | Stack: CHI02 |
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
|
| 1.46 miles | Aligned: ORD-04 |
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
|
| 1.49 miles | Stream: Chicago III DC2 |
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
| 1.58 miles | Stream: Chicago III DC3 |
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
| 1.61 miles | Aligned: ORD-03 |
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
|
| 1.75 miles | T5: Chicago V |
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
|
| 2.03 miles | STACK Chicago CHI01 |
|
| 2.04 miles | STACK CHI01B |
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
|
| 2.21 miles | Stream Chicago I |
Free-Standing, Data Center Designed to Tier III Standards
|
| 2.21 miles | TA Realty: Elk Grove |
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
|
| 2.26 miles | EdgeConneX: CHI03 |
EdgeConneX CHI03 is a new 167,000-square-foot, two-story data center building on its Elkgrove campus near Chicago.
|
| 2.29 miles | Equinix: CH5 |
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
|
| 2.29 miles | EdgeConneX CHI02 | |
| 2.31 miles | Equinix Chicago CH3 |
|
| 2.32 miles | Hyperscale Data Center Request Dataset | |
| 2.34 miles | EdgeConneX CHI01 |
|
| 2.47 miles | Stream Chicago II |
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
|
| 2.78 miles | 2200 Busse Rd (CH1) DRT | |
| 2.80 miles | 2299 Busse (CH2) Digital Realty |
|
| 2.83 miles | Deft: Elk Grove DF-CH1 |
|
| 2.83 miles | Digital Elk Grove Village Campus |
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
|
| 2.83 miles | HostPapa CH1 |
Formerly known as "ColoCrossing CH1"
|
| 2.83 miles | Rackspace Elk Grove ORD1 | |
| 2.86 miles | 1450 E Devon Ave (CH3) DRT | |
| 2.93 miles | Centersquare: Chicago ORD2 |
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
|
| 3.08 miles | DigiCo: Chicago |
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
|
| 3.28 miles | Colocation America CH3 | |
| 3.28 miles | DataBank ORD3 Mount Prospect |
|
| 3.56 miles | Apotech: Illinois 1 |
Apotech Group operates its Illiois 1 data center facility in the Chicago market, situated at 1331 E Business Center Drive. This facility is a retrofitted structure, encompassing 32,000 square feet of space.
|
| 3.97 miles | CyrusOne: Wood Dale CHI6 |
CyrusOne is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
|
| 3.99 miles | Iron Mountain Chicago |
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
|
| 4.12 miles | NTT: Chicago CH5 |
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
|
| 4.13 miles | Element Critical CH1 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
| 4.15 miles | NTT: Chicago CH4 |
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
|
| 4.24 miles | NTT: CH2 |
This facility is a part of NTT's Chicago data center campus in Illinois.
|
| 4.29 miles | NTT Chicago CH1 |
NTT acquired its Chicago site in 2018 through its RagingWire subsidiary. Launched in 2021, the first two-story data center, CH1, spans 126,000 sq ft (11,705 sqm) of data floor space.
|
| 4.30 miles | Element Critical CH2 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
| 4.38 miles | NTT: CH3 |
This facility is a part of NTT's Chicago data center campus in Illinois.
|
| 4.52 miles | Nexstar: Elk Grove Bldg 3 |
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
| 4.61 miles | Nexstar: Elk Grove Bldg 4 |
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
| 4.63 miles | Nexstar: Elk Grove Bldg 2 |
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
| 4.70 miles | Nexstar: Elk Grove |
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
|
| 6.21 miles | Complete Source Schaumburg | |
| 7.18 miles | T5: Chicago lll |
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
|
| 8.00 miles | Hyperscale Data Center Request Dataset |
|
| 8.22 miles | 505 N Railroad Ave - Digital Realty |
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
| 8.55 miles | Aligned Chicago ORD-01 |
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
|
| 8.59 miles | Aligned ORD-02 |
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
|
| 8.65 miles | Digital Realty: ORD15 |
In 2017, Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
|
| 8.72 miles | Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty |
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
|
| 8.73 miles | Digital Realty: Chicago ORD12 | |
| 8.74 miles | Digital Realty: ORD14 | |
| 8.78 miles | Digital Realty: ORD13 | |
| 8.85 miles | Tierpoint Chicago West | |
| 8.91 miles | Digital Realty: Franklin Park Expansion |
Digital Realty acquired two land parcels near their existing Franklin Park campus in separate transactions on July 2025, for a total of approximately $18 million.
|
| 9.74 miles | Hyperscale Data Center Request Dataset |
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|
| 9.84 miles | Hyperscale Data Center Request Dataset |
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|
| 9.98 miles | Hyperscale Data Center Request Dataset |
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
|
| 10.00 miles | Hyperscale Data Center Request Dataset |
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
|
| 11.99 miles | Connect Data Centers: Chicago |
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
|
| 12.59 miles | LexusNexis Oak Brook | |
| 12.59 miles | Verizon: Swift Dr |
|
| 12.59 miles | DataBank (ORD4) Oak Brook |
|
| 12.68 miles | Karis: Hoffman Estates Campus |
Karis Critical purchased 180 acres of land in the Hoffman Estates area from 5a7 for $45 million.
|
| 12.79 miles | Karis: Hoffman 2 |
This planned facility would be part of Karis Critical's Hoffman Estates Campus in Chicago, Illinois.
|
| 13.02 miles | Server Farm Oak Brook |
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
|
| 13.02 miles | US Signal Oakbrook IL01 |
800a 480V 3 phase
450kW diesel generator with 24 hour run time at full load
500kVa UPS capacity with battery backup
|
| 13.02 miles | Verizon: (Oak Brook) | |
| 13.10 miles | NYI Chicago (Oak Brook) | |
| 13.19 miles | Digital Fortress: Chicago Lombard | |
| 13.19 miles | 360TCS-Lombard | |
| 13.33 miles | Lumen Broadview | |
| 13.42 miles | CyrusOne: Lombard CHI5 |
9 MW of critical capacity
Both a 1.5MW and a 2MW transformer
|
| 14.20 miles | Compass Hoffman Estates |
Located in Cook County, the campus will feature five buildings and represents a total planned investment of $10 billion.
|
| 15.37 miles | Equinix Chicago CH7 |
|
| 17.08 miles | CloudCenters: Lisle, IL |
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
|
| 17.64 miles | Centersquare: Lisle CHI1 |
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
|
| 17.71 miles | Karis: Naperville, IL |
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
|
| 18.35 miles | Lumen Chicago 2 | |
| 18.47 miles | Lumen Chicago 4 | |
| 18.48 miles | Metro Edge: Illinois Medical District (IMD) |
Commercial real estate investment firm Metro Edge Development is building a data center in Chicago, Illinois.
|
| 18.78 miles | Cogent Naperville | |
| 18.80 miles | SBA Edge: 603 Discovery |
Former New Continuum site that was acquired in 2019
|
| 19.13 miles | Lumen Chicago 1 |
|
| 19.13 miles | EXA - 111 North Canal |
Former GTT suite
|
| 19.27 miles | Lumen Chicago 6 |
|
| 19.32 miles | Lumen Chicago 3 |
|
| 19.44 miles | TierPoint Chicago Polk |
|
| 19.46 miles | First Communications Chicago | |
| 19.56 miles | Cogent: 216 W Jackson | |
| 19.61 miles | DataBank (ORD2) 840 S Canal |
|
| 19.61 miles | Server Farm Realty 840 South Canal |
4 MW Critical Load on Each Floor (Floors 1-5)
130-160 Watts per Raised Floor SF
|
| 19.62 miles | QTS: Chicago 3 |
QTS plans to build another data center building on its Chicago Campus.
|
| 19.67 miles | QTS: Chicago 2 |
QTS is developing 366,000 sq ft (34,000 sqm) of data center space across three stories, alongside 80,000 sq ft (7,432 sqm) of office and loading areas in its Chicago Campus.
|
| 19.70 miles | Verizon: 140 S Dearborn | |
| 19.72 miles | Legacy: Chicago Byte Exchange CBE1 |
An affiliate of real estate firm Prime Group bought an office building in Chicago from options exchange company Cboe Global Markets for $12 million.
|
| 19.75 miles | QTS: Chicago Campus |
The campus was a former Sun Times Press Facility and was acquired in 2014
|
| 19.76 miles | QuadraNet Chicago | |
| 19.77 miles | CoreSite Chicago CH1 |
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
|
| 19.77 miles | 365 Chicago |
The site is a former Switch and Data site (also owned by Equinix for a short period.)
|
| 19.77 miles | Cogent: 427 S LaSalle | |
| 19.81 miles | Netrality Chicago: 717 S Wells |
The 10 story building was constructed in 1923 and eventually was converted into a data center.
|
| 19.82 miles | Crown Castle 725 S Wells |
|
| 19.83 miles | 725 S Wells - 1547 Critical Systems |
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
|
| 19.84 miles | T5: Grayslake, Illinois |
T5 Data Centers is developing a new data center campus in Grayslake, Illinois, about 40 miles northwest of Chicago.
|
| 19.88 miles | NetSource Chicago | |
| 19.90 miles | Lumen Chicago 5 | |
| 19.90 miles | Cogent: 600 S Federal | |
| 19.90 miles | Colocation America CH2 | |
| 19.90 miles | DataBank (ORD1) 600 S Federal | |
| 19.90 miles | Digital Realty: Chicago ORD11 | |
| 19.91 miles | CoreSite Chicago CH2 |
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
|
CloudHQ designs, builds and operates mission critical data centers delivered through a tailored, customer service focused platform designed to foster long-term relationships. CloudHQ provides 100% availability with high-density power, flexible configurations and carrier-neutral connectivity. Founded by Hossein Fateh, a pioneer of data center REITs and former CEO of DFT, and bolstered by a team of industry veterans, all with one purpose – to provide flexible solutions in high efficient space and resilient design for businesses of all sizes.
December 15, 2025
CloudHQ
April 09, 2024
CloudHQ
March 07, 2024
CloudHQ
June 07, 2023
CloudHQ
March 02, 2023
CloudHQ
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas