Harrison Street & 1547 CSR Buys Texas Carrier Hotel
January 02, 2023
1547 Critical Systems Realty (fifteenfortyseven)
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
The 725 South Wells building is a fiber rich property which sits directly on top of the Chicago “F Ring” Fiber enters the facility via 3 separate entrances and terminates on the 3rd floor.
Zayo (Above Net)
AT&T/SBC
CentryLink
Cogent
FiberLink
Geneseo Communications
Level 3
LookingGlass
OnFiber
Pinpoint
CenturyLink(Qwest)
Reliance(Yipes)
XO
Zayo
| Distance | Site | About |
|---|---|---|
| 0.00 miles | Crown Castle 725 S Wells |
|
| 0.02 miles | Netrality Chicago: 717 S Wells |
The 10 story building was constructed in 1923 and eventually was converted into a data center.
|
| 0.20 miles | Lumen Chicago 5 | |
| 0.20 miles | Cogent: 600 S Federal | |
| 0.20 miles | Colocation America CH2 | |
| 0.21 miles | Digital Realty: Chicago ORD11 | |
| 0.21 miles | DataBank (ORD1) 600 S Federal | |
| 0.24 miles | CoreSite Chicago CH1 |
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
|
| 0.24 miles | 365 Chicago |
The site is a former Switch and Data site (also owned by Equinix for a short period.)
|
| 0.24 miles | Cogent: 427 S LaSalle | |
| 0.26 miles | QuadraNet Chicago | |
| 0.28 miles | Legacy: Chicago Byte Exchange CBE1 |
An affiliate of real estate firm Prime Group bought an office building in Chicago from options exchange company Cboe Global Markets for $12 million.
|
| 0.37 miles | DataBank (ORD2) 840 S Canal |
|
| 0.37 miles | Server Farm Realty 840 South Canal |
4 MW Critical Load on Each Floor (Floors 1-5)
130-160 Watts per Raised Floor SF
|
| 0.40 miles | Cogent: 216 W Jackson | |
| 0.50 miles | First Communications Chicago | |
| 0.51 miles | TierPoint Chicago Polk |
|
| 0.53 miles | Verizon: 140 S Dearborn | |
| 0.78 miles | Lumen Chicago 6 |
|
| 0.80 miles | CoreSite Chicago CH2 |
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
|
| 0.83 miles | Lumen Chicago 1 |
|
| 0.83 miles | EXA - 111 North Canal |
Former GTT suite
|
| 0.93 miles | Lumen Chicago 3 |
|
| 1.50 miles | Centersquare: Chicago ORD1 |
Centersquare's ORD1 site is located in the heart of the Chicago Financial District on the 7th floor of an 8-story building on a fiber-linked campus.
|
| 1.50 miles | Colocation America CH1 |
|
| 1.50 miles | Digital Realty: ORD10 |
Digital Realty acquired the colocation services business of Hivelocity in 2025.
|
| 1.50 miles | Steadfast Chicago 350 E Cermak |
|
| 1.50 miles | Equinix Chicago CH1, CH2, & CH4 |
Equinix distinctly separates CH1, CH2, and CH4 into separate data centers, but in reality, the sites are in the same building.
|
| 1.51 miles | Deft: Downtown CH1 | |
| 1.52 miles | Centersquare: Chicago ORD1(B, C & D) |
Digital Realty Trust owns the building at 350 Cermak and is CTL's Landlord.
|
| 1.76 miles | Lumen Chicago 4 | |
| 1.91 miles | Lumen Chicago 2 | |
| 2.22 miles | Metro Edge: Illinois Medical District (IMD) |
Commercial real estate investment firm Metro Edge Development is building a data center in Chicago, Illinois.
|
| 2.65 miles | QTS: Chicago 2 |
QTS is developing 366,000 sq ft (34,000 sqm) of data center space across three stories, alongside 80,000 sq ft (7,432 sqm) of office and loading areas in its Chicago Campus.
|
| 2.74 miles | QTS: Chicago 3 |
QTS plans to build another data center building on its Chicago Campus.
|
| 2.77 miles | QTS: Chicago Campus |
The campus was a former Sun Times Press Facility and was acquired in 2014
|
| 5.39 miles | 1547 Chicago Midway Technology Centre |
In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
|
| 10.28 miles | Related Digital: Chicago, IL |
Related Digital is planning a 430-acre campus in Chicago, Illinois, at the old US Steel South Works location.
|
| 10.31 miles | Related Digital: Chicago Expansion | |
| 11.65 miles | Lumen Broadview | |
| 12.16 miles | Tierpoint Chicago West | |
| 12.16 miles | Digital Realty: Franklin Park Expansion |
Digital Realty acquired two land parcels near their existing Franklin Park campus in separate transactions on July 2025, for a total of approximately $18 million.
|
| 12.22 miles | Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty |
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
|
| 12.23 miles | Digital Realty: ORD14 | |
| 12.23 miles | Digital Realty: ORD13 | |
| 12.26 miles | Digital Realty: Chicago ORD12 | |
| 12.37 miles | Digital Realty: ORD15 |
In 2017, Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
|
| 12.73 miles | Digital Crossroad: Hammond, IN (Phase 2) |
Digital Crossroad is planning to expand its campus in Hammond, Indiana. The company plans to add another 180,000 sq ft (16,720 sqm) building in the second phase.
|
| 12.83 miles | Digital Crossroad (Indiana NAP) |
The facility (DX-1) is a 105,000 square foot data center located on the former State Line Generating Plant, Hammond, IN.
|
| 14.70 miles | 505 N Railroad Ave - Digital Realty |
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
| 14.86 miles | Verizon: Swift Dr |
|
| 14.86 miles | DataBank (ORD4) Oak Brook |
|
| 14.86 miles | LexusNexis Oak Brook | |
| 14.88 miles | Aligned Chicago ORD-01 |
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
|
| 14.90 miles | Aligned ORD-02 |
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
|
| 15.09 miles | Hyperscale Data Center Request Dataset |
|
| 15.16 miles | T5: Chicago lll |
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
|
| 15.87 miles | Server Farm Oak Brook |
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
|
| 15.87 miles | US Signal Oakbrook IL01 |
800a 480V 3 phase
450kW diesel generator with 24 hour run time at full load
500kVa UPS capacity with battery backup
|
| 15.87 miles | Verizon: (Oak Brook) | |
| 15.91 miles | Iron Mountain Chicago |
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
|
| 16.00 miles | NYI Chicago (Oak Brook) | |
| 17.97 miles | Equinix Chicago CH7 |
|
| 18.13 miles | TA Realty: Elk Grove |
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
|
| 18.42 miles | CyrusOne: Wood Dale CHI6 |
CyrusOne is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
|
| 18.44 miles | T5: Chicago V |
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
|
| 18.47 miles | Element Critical CH1 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
| 18.49 miles | Element Critical CH2 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
| 18.57 miles | EdgeConneX CHI01 |
|
| 18.60 miles | EdgeConneX: CHI03 |
EdgeConneX CHI03 is a new 167,000-square-foot, two-story data center building on its Elkgrove campus near Chicago.
|
| 18.61 miles | Centersquare: Chicago ORD2 |
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
|
| 18.67 miles | Stream Chicago I |
Free-Standing, Data Center Designed to Tier III Standards
|
| 18.67 miles | EdgeConneX CHI02 | |
| 18.71 miles | 2299 Busse (CH2) Digital Realty |
|
| 18.72 miles | Equinix: CH5 |
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
|
| 18.77 miles | Equinix Chicago CH3 |
|
| 18.86 miles | Stream Chicago II |
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
|
| 18.87 miles | Rackspace Elk Grove ORD1 | |
| 18.89 miles | HostPapa CH1 |
Formerly known as "ColoCrossing CH1"
|
| 18.89 miles | Deft: Elk Grove DF-CH1 |
|
| 18.89 miles | Digital Elk Grove Village Campus |
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
|
| 18.91 miles | 2200 Busse Rd (CH1) DRT | |
| 18.99 miles | 1450 E Devon Ave (CH3) DRT | |
| 19.05 miles | Stream: Chicago III DC2 |
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
| 19.07 miles | Stream: Chicago III DC3 |
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
| 19.15 miles | Stream: Chicago III |
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
| 19.30 miles | Stack: CHI02 |
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
|
| 19.34 miles | 360TCS-Lombard | |
| 19.34 miles | Digital Fortress: Chicago Lombard | |
| 19.38 miles | STACK Chicago CHI01 |
|
| 19.44 miles | DigiCo: Chicago |
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
|
| 19.48 miles | STACK CHI01B |
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
|
| 19.56 miles | Hyperscale Data Center Request Dataset | |
| 19.77 miles | CenturyLink: Arlington Heights | |
| 19.81 miles | Prime Elk Grove |
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
|
| 19.83 miles | CloudHQ: Mount Prospect ORD2 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
| 19.85 miles | Prime: ORD01-03 |
Building C will be another three-story construction, offering 294,429 gross square feet of space.
|
| 19.89 miles | Prime: ORD01-02 |
Building B will be another three-story construction, offering 279,360 gross square feet of space.
|
| 19.93 miles | CloudHQ Mount Prospect ORD3 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
| 19.99 miles | CloudHQ: Mount Prospect ORD1 |
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
fifteenfortyseven Critical Systems Realty ("1547") is a leading developer and operator of custom-designed data centers with over 1,300,000 SF of data center space in Orangeburg, NY; Toronto, ON; Chicago, IL (2); Cheyenne, WY; San Francisco, CA; Kapolei, HI; Milwaukee, WI; and Portland, OR. Central to the company's strategy is its ability to uncover the true intrinsic value of properties and opportunistically develop world-class data center facilities. 1547's focus is providing tenants with strategic, customized mission critical solutions from concept through completion.
January 02, 2023
1547 Critical Systems Realty (fifteenfortyseven)
September 05, 2022
1547 Critical Systems Realty (fifteenfortyseven)
November 05, 2021
1547 Critical Systems Realty (fifteenfortyseven)
June 09, 2021
1547 Critical Systems Realty (fifteenfortyseven)
January 02, 2019
725 S Wells - 1547 Critical Systems
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas