1.63 miles
|
Karis: Hoffman 2
|
This planned facility would be part of Karis Critical's Hoffman Estates Campus in Chicago, Illinois.
|
|
1.68 miles
|
Karis: Hoffman Estates Campus
|
Karis Critical purchased 180 acres of land in the Hoffman Estates area from 5a7 for $45 million.
|
|
1.86 miles
|
Brennan Investment: Barrington, IL
|
The Brennan Investment Group has officially withdrawn its ambitious plans for a $2 billion data center project in Barrington Hills, a village located roughly 40 miles northwest of Chicago, Illinois.
|
|
4.38 miles
|
Hyperscale Data Center
Request Dataset
|
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
|
|
4.38 miles
|
Hyperscale Data Center
Request Dataset
|
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
|
|
4.60 miles
|
Hyperscale Data Center
Request Dataset
|
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|
|
4.63 miles
|
Hyperscale Data Center
Request Dataset
|
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
|
|
8.00 miles
|
Complete Source Schaumburg
|
|
|
10.53 miles
|
Nexstar: Elk Grove
|
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
|
|
10.55 miles
|
Nexstar: Elk Grove Bldg 4
|
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
|
10.63 miles
|
Nexstar: Elk Grove Bldg 2
|
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
|
10.74 miles
|
Nexstar: Elk Grove Bldg 3
|
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
|
12.56 miles
|
NTT: CH2
|
This facility is a part of NTT's Chicago data center campus in Illinois.
|
|
12.57 miles
|
Connect Data Centers: Chicago
|
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
|
|
12.59 miles
|
NTT Chicago CH1
|
NTT acquired its Chicago site in 2018 through its RagingWire subsidiary. Launched in 2021, the first two-story data center, CH1, spans 126,000 sq ft (11,705 sqm) of data floor space.
|
|
12.60 miles
|
NTT: CH3
|
This facility is a part of NTT's Chicago data center campus in Illinois.
|
|
12.63 miles
|
Aligned: ORD-03
|
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
|
|
12.67 miles
|
NTT: Chicago CH5
|
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
|
|
12.70 miles
|
NTT: Chicago CH4
|
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
|
|
12.77 miles
|
Aligned: ORD-04
|
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
|
|
13.23 miles
|
T5 Chicago II
|
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
|
|
13.32 miles
|
Hyperscale Data Center
Request Dataset
|
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
|
13.36 miles
|
Hyperscale Data Center
Request Dataset
|
The 37-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
|
13.37 miles
|
Hyperscale Data Center
Request Dataset
|
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
|
|
13.74 miles
|
SBA Edge: 603 Discovery
|
Former New Continuum site that was acquired in 2019
|
|
13.81 miles
|
Prime: ORD01-02
|
Building B will be another three-story construction, offering 279,360 gross square feet of space.
|
|
13.86 miles
|
CoreWeave: US Central ORD1
|
|
|
13.88 miles
|
Prime: ORD01-03
|
Building C will be another three-story construction, offering 294,429 gross square feet of space.
|
|
13.90 miles
|
Prime Elk Grove
|
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
|
|
13.92 miles
|
DigiCo: Chicago
|
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
|
|
13.98 miles
|
STACK CHI01B
|
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
|
|
14.02 miles
|
CloudHQ: Mount Prospect ORD1
|
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
|
14.08 miles
|
STACK Chicago CHI01
|
|
|
14.14 miles
|
CloudHQ Mount Prospect ORD3
|
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
|
14.16 miles
|
CenturyLink: Arlington Heights
|
|
|
14.20 miles
|
CloudHQ: Mount Prospect ORD2
|
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
|
|
14.28 miles
|
Stack: CHI02
|
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
|
|
14.39 miles
|
1450 E Devon Ave (CH3) DRT
|
|
|
14.47 miles
|
Carrier-Neutral Data Center
Request Dataset
|
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
|
14.47 miles
|
2200 Busse Rd (CH1) DRT
|
|
|
14.49 miles
|
HostPapa CH1
|
Formerly known as "ColoCrossing CH1"
|
|
14.49 miles
|
Digital Elk Grove Village Campus
|
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
|
|
14.49 miles
|
Deft: Elk Grove DF-CH1
|
|
|
14.51 miles
|
Rackspace Elk Grove ORD1
|
|
|
14.56 miles
|
Carrier-Neutral Data Center
Request Dataset
|
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
|
14.56 miles
|
Stream Chicago II
|
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
|
|
14.57 miles
|
Carrier-Neutral Data Center
Request Dataset
|
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
|
|
14.67 miles
|
Equinix Chicago CH3
|
|
|
14.68 miles
|
2299 Busse (CH2) Digital Realty
|
|
|
14.72 miles
|
Equinix: CH5
|
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
|
|
14.77 miles
|
Centersquare: Chicago ORD2
|
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
|
|
14.78 miles
|
EdgeConneX CHI02
|
|
|
14.79 miles
|
Stream Chicago I
|
Free-Standing, Data Center Designed to Tier III Standards
|
|
14.86 miles
|
EdgeConneX: CHI03
|
EdgeConneX CHI03 is a new 167,000-square-foot, two-story data center building on its Elkgrove campus near Chicago.
|
|
14.88 miles
|
EdgeConneX CHI01
|
|
|
14.91 miles
|
Element Critical CH2
|
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
|
14.92 miles
|
Element Critical CH1
|
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
|
14.96 miles
|
Carrier-Neutral Data Center
Request Dataset
|
CyrusOne is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
|
|
15.06 miles
|
Hut 8: Batavia, IL
|
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
|
|
15.18 miles
|
T5: Chicago V
|
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
|
|
15.39 miles
|
Colocation America CH3
|
|
|
15.39 miles
|
DataBank ORD3 Mount Prospect
|
|
|
15.40 miles
|
TA Realty: Elk Grove
|
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
|
|
15.79 miles
|
Apotech: Illinois 1
|
Apotech Group operates its Illiois 1 data center facility in the Chicago market, situated at 1331 E Business Center Drive. This facility is a retrofitted structure, encompassing 32,000 square feet of space.
|
|
18.10 miles
|
Iron Mountain Chicago
|
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
|
|
18.23 miles
|
NetSource Chicago
|
|
|
18.45 miles
|
CyrusOne: Lombard CHI5
|
9 MW of critical capacity
Both a 1.5MW and a 2MW transformer
|
|
18.46 miles
|
Edged Energy: Aurora ORD01
|
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
|
|
18.50 miles
|
T5: Chicago lll
|
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
|
|
18.58 miles
|
Edged Energy: Chicago ORD02
|
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
|
|
18.64 miles
|
T5: Grayslake, Illinois
|
T5 Data Centers is developing a new data center campus in Grayslake, Illinois, about 40 miles northwest of Chicago.
|
|
18.69 miles
|
Edged Energy: Chicago ORD03
|
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
|
|
18.77 miles
|
CyrusOne: Aurora III (CHI3)
|
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
|
18.83 miles
|
CyrusOne: CHI3 DC2
|
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
|
18.85 miles
|
Hyperscale Data Center
Request Dataset
|
|
|
18.94 miles
|
Karis: Naperville, IL
|
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
|
|
19.13 miles
|
Digital Fortress: Chicago Lombard
|
|
|
19.13 miles
|
360TCS-Lombard
|
|
|
19.14 miles
|
Cogent Naperville
|
|
|
19.16 miles
|
DataCanopy: Chicago, IL
|
|
|
19.17 miles
|
CyrusOne: Aurora CHI2
|
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
|
|
19.18 miles
|
CyrusOne Chicago Aurora CME
|
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
|
|
19.23 miles
|
505 N Railroad Ave - Digital Realty
|
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
|
19.24 miles
|
Aligned ORD-02
|
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
|
|
19.24 miles
|
Aligned Chicago ORD-01
|
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
|
|
19.29 miles
|
CyrusOne: CHI2 DC2
|
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
|
|
19.88 miles
|
Centersquare: Lisle CHI1
|
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
|