NetSource Chicago

Latest Podcast 2368 Corporate Lane
Operational
Fully operational facility
Operated by: NetSource

NetSource Chicago

░░░ Request Dataset MW
Operational Power

Map and Nearby Locations

2368 Corporate Lane
NetSource Sites
Nearby Facilities

Sites within 15 miles of NetSource Chicago

Distance Site About
2.24 miles Karis: Naperville (INEOS)
Real estate developer Karis Critical is in early-stage exploratory discussions to potentially acquire the 168-acre former BP/INEOS campus at in Naperville, Illinois, within the Suburban Chicago market.
2.36 miles Edged Energy: Aurora ORD01
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
2.47 miles Edged Energy: Chicago ORD03
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
2.51 miles Edged Energy: Chicago ORD02
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
2.65 miles CyrusOne: Aurora CME (CHI1)
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
2.67 miles DataCanopy: Chicago, IL
2.69 miles CyrusOne: CHI3 DC1
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
2.69 miles Cogent Naperville
2.71 miles CyrusOne: CHI2 DC1
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
2.79 miles CyrusOne: CHI3 DC2
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
2.87 miles CyrusOne: CHI2 DC2
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
2.88 miles Colovore: ORD04
Colovore's fourth Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus, adjacent to the company's ORD01 site. Two-hall design with service dates in late 2028 and early 2029.
2.90 miles US Signal: IL02 Aurora
US Signal's Aurora, Illinois data center at 4267 Meridian Parkway in the Meridian Business Campus, acquired in December 2025. The 70,000 sq ft facility carries about 33,000 sq ft of white space and is being upgraded in phases with new UPS, cooling and generator capacity, with liquid-cooled high-density space planned. It connects to US Signal's Oak Brook site and national fiber backbone and hosts the company's OpenCloud platform.
2.90 miles 4267 Meridian Pkwy: Lincoln Rackhouse
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
2.91 miles DataBridge: Aurora, IL
DataBridge Sites is the new name for ESite Systems, a company with two decades of history in the industry.
2.96 miles Colovore: ORD03
Colovore's third Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Two-hall design with service dates in 2028.
3.04 miles Colovore: ORD01
Colovore's first Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Single data hall slated for service in late 2026.
3.87 miles Karis: Naperville, IL
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
4.68 miles Summit: Naperville
5.03 miles Colovore: West Chicago ORD02
ORD02 is Colovore's second Chicago-area facility, located in West Chicago and extending the company's distributed footprint across the metro. The liquid-cooled, HVDC-ready site is under construction and pre-leasing for edge AI and high-performance colocation workloads.
5.04 miles Hut 8: Batavia, IL
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
5.20 miles Centersquare: Lisle CHI1
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
5.28 miles SBA Edge: 603 Discovery
Former New Continuum site that was acquired in 2019
6.86 miles CloudCenters: Lisle, IL
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
8.03 miles Connect Data Centers: Chicago
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
8.93 miles CyrusOne: Lombard CHI5
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
9.99 miles 360TCS-Lombard
9.99 miles Digital Fortress: Chicago Lombard
11.46 miles Equinix Chicago CH7
13.26 miles NYI Chicago (Oak Brook)
13.38 miles Verizon: (Oak Brook)
13.39 miles US Signal Oakbrook IL01
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
13.39 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
13.80 miles WhiteRose: South Elgin, IL
Whiterose Partners LLC is proposing a 200,000-square-foot data center on nine acres in South Elgin, Illinois, located roughly 40 miles west of Chicago.
14.43 miles LexusNexis Oak Brook
14.43 miles Verizon: Swift Dr
14.43 miles DataBank (ORD4) Oak Brook
15.17 miles Pioneer: Project Cardinal 1
First building of the northeast phase of Pioneer Development's Project Cardinal campus in Yorkville, Illinois. Planned as a two-story data center of about 1.36 million sq ft beside the campus ComEd switchyard and customer substation.
15.21 miles Magnolia Hill: Yorkville Corneils Road
Proposed data center site of about 143 acres at Corneils Road and IL Route 47 near Bristol, Illinois, east of Yorkville, linked to Orlando family office Magnolia Hill Partners. Yorkville logged it as a site inquiry in 2025; no petition has been filed.
15.22 miles Pioneer: Project Cardinal Expansion
The other 13 planned buildings of Pioneer Development's Project Cardinal campus in Yorkville, Illinois, built in northeast, south and west phases after the first building.
15.51 miles NTT: Chicago CH3
CH3 is a data center under construction at 235 Pierce Road on NTT's Itasca campus in Itasca, Illinois, with four data vaults.
15.59 miles NTT: Chicago CH1
The first building on NTT's Itasca campus: a two-story data center at 255 Pierce Road with six data vaults and four primary 34.5 kV ComEd feeds plus one alternate.
15.65 miles NTT: Chicago CH2
CH2 is a two-story data center at 275 Pierce Road on NTT's Itasca campus in Itasca, Illinois, with six data halls.
15.73 miles NTT: Chicago CH4
CH4 is a planned data center at 1200 N. Arlington Heights Road on NTT's Itasca campus, on the site of two office buildings NTT bought and cleared.
15.87 miles NTT: Chicago CH5
CH5 is a planned three-story data center on the former Marino Court subdivision east of Arlington Heights Road, the fifth and final building on NTT's Itasca campus.
15.91 miles Aligned: ORD-02
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
15.97 miles Aligned: ORD-01
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
15.97 miles Nexstar: Elk Grove Bldg1
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
15.99 miles Nexstar: Elk Grove Bldg2
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
16.05 miles Nexstar: Elk Grove Bldg3
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
16.08 miles Nexstar: Elk Grove Bldg4
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
16.18 miles Prologis: Project Steel 1
Phase 1 of Prologis's Project Steel campus in Yorkville: four two-story data center buildings of about 425,000 sq ft each and two substations, east of the ComEd corridor off Corneils and Beecher roads. Construction is planned to start in 2027.
16.19 miles CloudInterested in this information?Contact us
16.22 miles Prologis: Project Steel Expansion
Future Phases 2 and 3 of Prologis's Project Steel campus in Yorkville, Illinois: twelve two-story buildings and two substations at Galena and Eldamain roads, planned over the 2030s and 2040s.
16.25 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
16.38 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
16.43 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
16.61 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Carrier-Neutral Operator is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
16.68 miles T5: Chicago lll
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
16.78 miles Green Door: Yorkville Hagemann
Green Door Capital land-bank data center tract of about 138 acres on Eldamain Road in Yorkville, Illinois, held by Yorkville Nexus III LLC. Annexed and rezoned M-2 in 2024; no end user or site plan has been filed. Borders Prologis Project Steel near ComEd's Plano substation.
16.95 miles DigiCo: Chicago
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
17.00 miles DMYF: Yorkville Daniels North
Land-bank data center tract of about 54 acres between the BNSF railroad and Faxon Road at Beecher Road in Yorkville, Illinois, owned by the Daniels Malinski Yorkville Family partnership. Rezoned M-2 in 2025, next to CyrusOne's campus. No end user or site plan filed.
17.05 miles CyrusOne: Yorkville 8
Building 11H of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft on the campus's east edge along Beecher Road.
17.07 miles CyrusOne: Yorkville 9
Former ninth building of CyrusOne's 2024 Yorkville Technology Campus plan in Yorkville, Illinois. CyrusOne cut the campus to eight buildings in 2026, so this building is no longer planned.
17.20 miles Green Door: Yorkville 50 Acres
Green Door Capital land-bank data center tract of about 50 acres at Eldamain and Corneils roads in Yorkville, Illinois, held by Yorkville Nexus LLC. Zoned M-2 for data center use; no end user or site plan has been filed. Lies just north of CyrusOne's Yorkville campus.
17.22 miles CyrusOne: Yorkville 7
Building 11G of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the east end of the south row, south of the on-site substation.
17.34 miles CyrusOne: Yorkville 4
Building 11D of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the campus's middle row, just west of the on-site substation.
17.37 miles 1400 E Devon Ave (CH3) DRT
17.37 miles CyrusOne: Yorkville 2
Building 11B of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 129,000 sq ft, the campus's smallest building, beside Building 11A in the northwest section.
17.40 miles CyrusOne: Yorkville 6
Building 11F of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the middle of the campus's south row.
17.44 miles Deft: Elk Grove DF-CH1
17.44 miles HostPapa CH1
Formerly known as "ColoCrossing CH1"
17.44 miles CyrusOne: Yorkville 1
Building 11A of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the campus's northwest section. CyrusOne plans to build it first.
17.45 miles Rackspace Elk Grove ORD1
17.48 miles 2200 Busse Rd (CH1) DRT
17.51 miles CyrusOne: Yorkville 3
Building 11C of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the west end of the campus's middle row.
17.51 miles Centersquare: Chicago ORD2
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
17.51 miles Green Door: Yorkville Kelaka
Green Door Capital land-bank data center tract of about 154 acres south of Faxon Road in Yorkville, Illinois, held by Yorkville Nexus IV LLC. Yorkville approved its annexation and rezoning; no end user or site plan has been filed. Lies just south of CyrusOne's Yorkville campus.
17.56 miles CyrusOne: Yorkville 5
Building 11E of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the west end of the campus's south row, near Faxon Road.
17.57 miles 2299 Busse (CH2) Digital Realty
17.60 miles Lumen Broadview
17.63 miles North PointInterested in this information?Contact us
Microsoft owns about 506 acres west of Eldamain Road at Corneils Road in Plano, Illinois, bought from three landowners in April 2024. Plano annexed and rezoned the land for a data center campus in 2024. Microsoft paused the project in June 2025.
17.65 miles CoreWeave: US Central ORD1
17.82 miles Stream Chicago II
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
17.82 miles DMYF: Yorkville Daniels South
Land-bank data center tract of about 268 acres at the northwest corner of US 34 and Beecher Road in Yorkville, Illinois, owned by the Daniels Malinski Yorkville Family partnership. Yorkville annexed and rezoned it M-2 in 2025. No end user or site plan has been filed.
17.95 miles Stack: CHI01B
Two-story data center at 1301 Touhy Avenue, built by STACK next to CHI01A on the same parcel, with four data halls and diverse underground ComEd feeds.
17.99 miles Stack: CHI01A
Single-story data center at 1441 Touhy Avenue in Elk Grove Village. Forsythe Technology broke ground on it in 2014, T5 bought it in 2016, and IPI Partners made it part of STACK. It adjoins CHI01B on a shared 14-acre parcel.
18.04 miles Equinix Chicago CH3
18.05 miles Kelaka: Yorkville Hamman
Kelaka LLC land-bank data center tract of about 112 acres in Yorkville, Illinois, in two pieces: south of Faxon Road beside Kylyn's Ridge, and at US 34 and Eldamain Road. Yorkville annexed and rezoned it M-2 in 2025. No end user or site plan has been filed.
18.10 miles Equinix: CH5
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
18.13 miles EdgeConneX CHI02
18.14 miles Complete Source Schaumburg
18.16 miles EdgeConneX CHI01
CHI01 is EdgeConneX's first Chicago data center, a 132,000 sq ft retrofit at 1800 Nicholas Blvd in Elk Grove Village, Illinois.
18.21 miles EdgeConneX: CHI03
EdgeConneX CHI03 is a new 167,000 sq ft, two-story data center building on its Elk Grove Village campus near Chicago.
18.23 miles Stream Chicago I
Free-Standing, Data Center Designed to Tier III Standards
18.23 miles Compass Hoffman Estates
Located in Cook County, the campus will feature five buildings and represents a total planned investment of $10 billion.
18.42 miles East CampusInterested in this information?Contact us
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
18.50 miles EdgeConneX: CHI04
CHI04 is a two-story, 164,000 sq ft EdgeConneX data center under construction at 901 Busse Road in Elk Grove Village, Illinois, near O'Hare Airport.
18.52 miles T5 Chicago II
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
18.54 miles OneInterested in this information?Contact us
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
18.55 miles Karis: Hoffman Estates Campus
Karis Critical and site owner Hoffman Estates Holdings officially withdrew their rezoning application for the proposed data center project in Hoffman Estates, Illinois, in June 2026, putting all active approvals on hold.
18.59 miles EdgeConneX: CHI05
CHI05 is EdgeConneX's planned second data center on Busse Road in Elk Grove Village, Illinois, on the parcel next to CHI04.
18.62 miles Center ProInterested in this information?Contact us
The 37-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
18.62 miles PlusInterested in this information?Contact us
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
18.63 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
18.69 miles Central TowerInterested in this information?Contact us
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
18.71 miles Stream: Chicago ORDC2
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
18.73 miles Metro PlazaInterested in this information?Contact us
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
18.74 miles Stack: CHI02
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
18.76 miles Center TwoInterested in this information?Contact us
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
18.77 miles Stream: Chicago ORDC3
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
18.78 miles TA Realty: Elk Grove
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
18.88 miles Aligned: ORD-03
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
18.92 miles Prime: ORD01-02
Building B will be another three-story construction, offering 279,360 gross square feet of space.
18.95 miles Prime: ORD01-01
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
18.96 miles Savion: Plano 1
Plano 1 is the first building in Savion's proposed data center campus beside the Plano Skies Energy Center north of Plano, Illinois.
18.99 miles Aligned: ORD-04
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
18.99 miles Digital Realty: ORD15
In 2017, Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
19.02 miles Prime: ORD01-03
Building C will be another three-story construction, offering 294,429 gross square feet of space.
19.04 miles T5: Chicago V
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
19.05 miles Digital Realty: Franklin Park Expansion
Digital Realty acquired two land parcels near their existing Franklin Park campus in separate transactions on July 2025, for a total of approximately $18 million.
19.07 miles Digital Realty: ORD13
19.09 miles Digital Realty: ORD12
19.12 miles Tierpoint Chicago West
19.13 miles Digital Realty: ORD14
19.26 miles Savion: Plano Expansion
19.64 miles CenturyLink: Arlington Heights
19.79 miles CloudHQ: ORD1
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
19.88 miles CloudHQ: ORD2
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
19.96 miles CloudHQ: ORD3
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.

Operating Company

Operated by: NetSource

NetSource is a Chicago based hosting company that also offers colocation.

0
Facilities
0
Markets
0MW
Megawatts

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?