|
0.17 miles
|
CyrusOne: CHI2 DC1
|
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
|
|
0.21 miles
|
DataCanopy: Chicago, IL
|
|
|
0.22 miles
|
CyrusOne: Aurora CME (CHI1)
|
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
|
|
0.47 miles
|
CyrusOne: CHI3 DC2
|
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
|
0.52 miles
|
CyrusOne: CHI3 DC1
|
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
|
|
0.63 miles
|
Edged Energy: Chicago ORD03
|
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
|
|
0.72 miles
|
Edged Energy: Chicago ORD02
|
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
|
|
0.87 miles
|
Edged Energy: Aurora ORD01
|
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
|
|
2.13 miles
|
Colovore: ORD04
|
Colovore's fourth Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus, adjacent to the company's ORD01 site. Two-hall design with service dates in late 2028 and early 2029.
|
|
2.17 miles
|
Colovore: ORD03
|
Colovore's third Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Two-hall design with service dates in 2028.
|
|
2.18 miles
|
Colovore: ORD01
|
Colovore's first Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Single data hall slated for service in late 2026.
|
|
2.22 miles
|
US Signal: IL02 Aurora
|
US Signal's Aurora, Illinois data center at 4267 Meridian Parkway in the Meridian Business Campus, acquired in December 2025. The 70,000 sq ft facility carries about 33,000 sq ft of white space and is being upgraded in phases with new UPS, cooling and generator capacity, with liquid-cooled high-density space planned. It connects to US Signal's Oak Brook site and national fiber backbone and hosts the company's OpenCloud platform.
|
|
2.22 miles
|
4267 Meridian Pkwy: Lincoln Rackhouse
|
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
|
|
2.23 miles
|
DataBridge: Aurora, IL
|
DataBridge Sites is the new name for ESite Systems, a company with two decades of history in the industry.
|
|
2.87 miles
|
NetSource Chicago
|
|
|
4.52 miles
|
Hut 8: Batavia, IL
|
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
|
|
5.02 miles
|
Karis: Naperville (INEOS)
|
Real estate developer Karis Critical is in early-stage exploratory discussions to potentially acquire the 168-acre former BP/INEOS campus at in Naperville, Illinois, within the Suburban Chicago market.
|
|
5.33 miles
|
Cogent Naperville
|
|
|
5.57 miles
|
SBA Edge: 603 Discovery
|
Former New Continuum site that was acquired in 2019
|
|
5.71 miles
|
Summit: Naperville
|
|
|
5.72 miles
|
Colovore: West Chicago ORD02
|
ORD02 is Colovore's second Chicago-area facility, located in West Chicago and extending the company's distributed footprint across the metro. The liquid-cooled, HVDC-ready site is under construction and pre-leasing for edge AI and high-performance colocation workloads.
|
|
6.62 miles
|
Karis: Naperville, IL
|
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
|
|
7.85 miles
|
Centersquare: Lisle CHI1
|
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
|
|
9.50 miles
|
CloudCenters: Lisle, IL
|
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
|
|
10.46 miles
|
Connect Data Centers: Chicago
|
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
|
|
11.79 miles
|
CyrusOne: Lombard CHI5
|
9 MW of critical capacity
Both a 1.5MW and a 2MW transformer
|
|
12.31 miles
|
Pioneer: Project Cardinal 1
|
First building of the northeast phase of Pioneer Development's Project Cardinal campus in Yorkville, Illinois. Planned as a two-story data center of about 1.36 million sq ft beside the campus ComEd switchyard and customer substation.
|
|
12.36 miles
|
Pioneer: Project Cardinal Expansion
|
The other 13 planned buildings of Pioneer Development's Project Cardinal campus in Yorkville, Illinois, built in northeast, south and west phases after the first building.
|
|
12.42 miles
|
Magnolia Hill: Yorkville Corneils Road
|
Proposed data center site of about 143 acres at Corneils Road and IL Route 47 near Bristol, Illinois, east of Yorkville, linked to Orlando family office Magnolia Hill Partners. Yorkville logged it as a site inquiry in 2025; no petition has been filed.
|
|
12.85 miles
|
360TCS-Lombard
|
|
|
12.85 miles
|
Digital Fortress: Chicago Lombard
|
|
|
13.33 miles
|
Prologis: Project Steel 1
|
Phase 1 of Prologis's Project Steel campus in Yorkville: four two-story data center buildings of about 425,000 sq ft each and two substations, east of the ComEd corridor off Corneils and Beecher roads. Construction is planned to start in 2027.
|
|
13.36 miles
|
Prologis: Project Steel Expansion
|
Future Phases 2 and 3 of Prologis's Project Steel campus in Yorkville, Illinois: twelve two-story buildings and two substations at Galena and Eldamain roads, planned over the 2030s and 2040s.
|
|
13.92 miles
|
Green Door: Yorkville Hagemann
|
Green Door Capital land-bank data center tract of about 138 acres on Eldamain Road in Yorkville, Illinois, held by Yorkville Nexus III LLC. Annexed and rezoned M-2 in 2024; no end user or site plan has been filed. Borders Prologis Project Steel near ComEd's Plano substation.
|
|
14.17 miles
|
Equinix Chicago CH7
|
|
|
14.19 miles
|
DMYF: Yorkville Daniels North
|
Land-bank data center tract of about 54 acres between the BNSF railroad and Faxon Road at Beecher Road in Yorkville, Illinois, owned by the Daniels Malinski Yorkville Family partnership. Rezoned M-2 in 2025, next to CyrusOne's campus. No end user or site plan filed.
|
|
14.24 miles
|
CyrusOne: Yorkville 8
|
Building 11H of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft on the campus's east edge along Beecher Road.
|
|
14.25 miles
|
CyrusOne: Yorkville 9
|
Former ninth building of CyrusOne's 2024 Yorkville Technology Campus plan in Yorkville, Illinois. CyrusOne cut the campus to eight buildings in 2026, so this building is no longer planned.
|
|
14.36 miles
|
Green Door: Yorkville 50 Acres
|
Green Door Capital land-bank data center tract of about 50 acres at Eldamain and Corneils roads in Yorkville, Illinois, held by Yorkville Nexus LLC. Zoned M-2 for data center use; no end user or site plan has been filed. Lies just north of CyrusOne's Yorkville campus.
|
|
14.38 miles
|
WhiteRose: South Elgin, IL
|
Whiterose Partners LLC is proposing a 200,000-square-foot data center on nine acres in South Elgin, Illinois, located roughly 40 miles west of Chicago.
|
|
14.40 miles
|
CyrusOne: Yorkville 7
|
Building 11G of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the east end of the south row, south of the on-site substation.
|
|
14.51 miles
|
CyrusOne: Yorkville 4
|
Building 11D of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the campus's middle row, just west of the on-site substation.
|
|
14.54 miles
|
CyrusOne: Yorkville 2
|
Building 11B of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 129,000 sq ft, the campus's smallest building, beside Building 11A in the northwest section.
|
|
14.58 miles
|
CyrusOne: Yorkville 6
|
Building 11F of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the middle of the campus's south row.
|
|
14.61 miles
|
CyrusOne: Yorkville 1
|
Building 11A of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft in the campus's northwest section. CyrusOne plans to build it first.
|
|
14.68 miles
|
CyrusOne: Yorkville 3
|
Building 11C of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the west end of the campus's middle row.
|
|
14.70 miles
|
Green Door: Yorkville Kelaka
|
Green Door Capital land-bank data center tract of about 154 acres south of Faxon Road in Yorkville, Illinois, held by Yorkville Nexus IV LLC. Yorkville approved its annexation and rezoning; no end user or site plan has been filed. Lies just south of CyrusOne's Yorkville campus.
|
|
14.74 miles
|
CyrusOne: Yorkville 5
|
Building 11E of CyrusOne's Yorkville Technology Campus (CHI11) at Eldamain and Faxon roads in Yorkville, Illinois. A planned single-story data center of about 246,000 sq ft at the west end of the campus's south row, near Faxon Road.
|
|
14.77 miles
|
MetroInterested in this information?Contact us
|
Microsoft owns about 506 acres west of Eldamain Road at Corneils Road in Plano, Illinois, bought from three landowners in April 2024. Plano annexed and rezoned the land for a data center campus in 2024. Microsoft paused the project in June 2025.
|
|
15.04 miles
|
DMYF: Yorkville Daniels South
|
Land-bank data center tract of about 268 acres at the northwest corner of US 34 and Beecher Road in Yorkville, Illinois, owned by the Daniels Malinski Yorkville Family partnership. Yorkville annexed and rezoned it M-2 in 2025. No end user or site plan has been filed.
|
|
15.25 miles
|
Kelaka: Yorkville Hamman
|
Kelaka LLC land-bank data center tract of about 112 acres in Yorkville, Illinois, in two pieces: south of Faxon Road beside Kylyn's Ridge, and at US 34 and Eldamain Road. Yorkville annexed and rezoned it M-2 in 2025. No end user or site plan has been filed.
|
|
16.08 miles
|
NYI Chicago (Oak Brook)
|
|
|
16.11 miles
|
Savion: Plano 1
|
Plano 1 is the first building in Savion's proposed data center campus beside the Plano Skies Energy Center north of Plano, Illinois.
|
|
16.21 miles
|
Verizon: (Oak Brook)
|
|
|
16.21 miles
|
US Signal Oakbrook IL01
|
800a 480V 3 phase
450kW diesel generator with 24 hour run time at full load
500kVa UPS capacity with battery backup
|
|
16.21 miles
|
Server Farm Oak Brook
|
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
|
|
16.40 miles
|
Savion: Plano Expansion
|
|
|
17.26 miles
|
LexusNexis Oak Brook
|
|
|
17.26 miles
|
DataBank (ORD4) Oak Brook
|
|
|
17.26 miles
|
Verizon: Swift Dr
|
|
|
18.06 miles
|
NTT: Chicago CH3
|
CH3 is a data center under construction at 235 Pierce Road on NTT's Itasca campus in Itasca, Illinois, with four data vaults.
|
|
18.14 miles
|
NTT: Chicago CH1
|
The first building on NTT's Itasca campus: a two-story data center at 255 Pierce Road with six data vaults and four primary 34.5 kV ComEd feeds plus one alternate.
|
|
18.20 miles
|
NTT: Chicago CH2
|
CH2 is a two-story data center at 275 Pierce Road on NTT's Itasca campus in Itasca, Illinois, with six data halls.
|
|
18.29 miles
|
NTT: Chicago CH4
|
CH4 is a planned data center at 1200 N. Arlington Heights Road on NTT's Itasca campus, on the site of two office buildings NTT bought and cleared.
|
|
18.33 miles
|
Nexstar: Elk Grove Bldg1
|
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
|
|
18.36 miles
|
Nexstar: Elk Grove Bldg2
|
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
|
18.43 miles
|
Nexstar: Elk Grove Bldg3
|
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
|
18.44 miles
|
NTT: Chicago CH5
|
CH5 is a planned three-story data center on the former Marino Court subdivision east of Arlington Heights Road, the fifth and final building on NTT's Itasca campus.
|
|
18.45 miles
|
Nexstar: Elk Grove Bldg4
|
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
|
|
18.78 miles
|
Aligned: ORD-02
|
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
|
|
18.83 miles
|
Aligned: ORD-01
|
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
|
|
18.95 miles
|
Element Critical CH2
|
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
|
19.05 miles
|
ProInterested in this information?Contact us
|
|
|
19.13 miles
|
Element Critical CH1
|
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
|
19.24 miles
|
505 N Railroad Ave - Digital Realty
|
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
|
19.29 miles
|
Compass Hoffman Estates
|
Located in Cook County, the campus will feature five buildings and represents a total planned investment of $10 billion.
|
|
19.30 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Carrier-Neutral Operator is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
|
|
19.52 miles
|
T5: Chicago lll
|
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
|
|
19.57 miles
|
DigiCo: Chicago
|
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
|
|
19.82 miles
|
Karis: Hoffman Estates Campus
|
Karis Critical and site owner Hoffman Estates Holdings officially withdrew their rezoning application for the proposed data center project in Hoffman Estates, Illinois, in June 2026, putting all active approvals on hold.
|