Whiterose Partners LLC is proposing a 200,000-square-foot data center on nine acres in South Elgin, Illinois, located roughly 40 miles west of Chicago.

Situated at the northwest corner of Kenyon Road and Illinois Route 25 on farmland owned by former Kane County board member Mike Kenyon, the facility requires annexation into South Elgin to proceed. To minimize environmental impact, the project incorporates a closed-loop cooling system to conserve water, though it faces local opposition, including a community petition citing concerns over corporate development on agricultural land.

Map and Nearby Locations

33W304 Kenyon Rd
White Rose Partners Sites
Nearby Facilities

WhiteRose: South Elgin, IL Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of WhiteRose: South Elgin, IL

Distance Site About
5.49 miles Compass Hoffman Estates
Located in Cook County, the campus will feature five buildings and represents a total planned investment of $10 billion.
6.61 miles Karis: Hoffman Estates Campus
Karis Critical and site owner Hoffman Estates Holdings officially withdrew their rezoning application for the proposed data center project in Hoffman Estates, Illinois, in June 2026, putting all active approvals on hold.
6.97 miles Brennan Investment: Barrington, IL
The Brennan Investment Group has officially withdrawn its ambitious plans for a $2 billion data center project in Barrington Hills, a village located roughly 40 miles northwest of Chicago, Illinois.
8.48 miles Ridge ThreeInterested in this information?Contact us
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
8.52 miles CoreInterested in this information?Contact us
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
8.67 miles UltraInterested in this information?Contact us
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
8.76 miles Hub PrimeInterested in this information?Contact us
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
8.82 miles SBA Edge: 603 Discovery
Former New Continuum site that was acquired in 2019
9.95 miles Hut 8: Batavia, IL
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
10.20 miles Connect Data Centers: Chicago
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
10.97 miles Complete Source Schaumburg
11.99 miles Nexstar: Elk Grove
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
12.06 miles Nexstar: Elk Grove Bldg 4
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
12.08 miles Nexstar: Elk Grove Bldg 2
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
12.20 miles Nexstar: Elk Grove Bldg 3
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
13.54 miles NTT: CH3
This facility is a part of NTT's Chicago data center campus in Illinois.
13.56 miles NTT: CH2
This facility is a part of NTT's Chicago data center campus in Illinois.
13.56 miles NTT Chicago CH1
NTT acquired its Chicago site in 2018 through its RagingWire subsidiary. Launched in 2021, the first two-story data center, CH1, spans 126,000 sq ft (11,705 sqm) of data floor space.
13.60 miles Edged Energy: Aurora ORD01
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
13.69 miles Edged Energy: Chicago ORD02
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
13.70 miles NTT: Chicago CH5
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building.
13.71 miles NTT: Chicago CH4
NTT has acquired two office buildings in Chicago, Illinois, and plans to replace them with data centers.
13.80 miles NetSource Chicago
13.82 miles Edged Energy: Chicago ORD03
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
13.86 miles CyrusOne: Aurora III (CHI3)
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
13.91 miles CyrusOne: CHI3 DC2
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
14.27 miles CyrusOne: Aurora CHI2
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
14.27 miles DataCanopy: Chicago, IL
14.29 miles CyrusOne Chicago Aurora CME
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
14.38 miles CyrusOne: CHI2 DC2
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
14.58 miles Karis: Naperville (INEOS)
Real estate developer Karis Critical is in early-stage exploratory discussions to potentially acquire the 168-acre former BP/INEOS campus at in Naperville, Illinois, within the Suburban Chicago market.
14.91 miles Aligned: ORD-03
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
15.06 miles Aligned: ORD-04
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
15.20 miles DigiCo: Chicago
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
15.23 miles Cogent Naperville
15.25 miles T5 Chicago II
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
15.34 miles Karis: Naperville, IL
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
15.38 miles Valley ProInterested in this information?Contact us
The 37-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
15.39 miles ThreeInterested in this information?Contact us
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
15.42 miles CoreWeave: US Central ORD1
15.42 miles Plaza GammaInterested in this information?Contact us
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
15.62 miles STACK CHI01B
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
15.72 miles STACK Chicago CHI01
15.73 miles 1450 E Devon Ave (CH3) DRT
15.75 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
15.82 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
15.84 miles HostPapa CH1
Formerly known as "ColoCrossing CH1"
15.84 miles Digital Elk Grove Village Campus
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
15.84 miles Deft: Elk Grove DF-CH1
15.84 miles 2200 Busse Rd (CH1) DRT
15.85 miles Prime: ORD01-02
Building B will be another three-story construction, offering 279,360 gross square feet of space.
15.86 miles Rackspace Elk Grove ORD1
15.91 miles Carrier-Neutral Data CenterInterested in this information?Contact us
CyrusOne is developing a 62-acre campus in Wood Dale, Illinois, with plans to construct six data center buildings encompassing approximately 1.4 million square feet.
15.93 miles Prime Elk Grove
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
15.94 miles Prime: ORD01-03
Building C will be another three-story construction, offering 294,429 gross square feet of space.
16.04 miles Stream Chicago II
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
16.04 miles 2299 Busse (CH2) Digital Realty
16.09 miles Centersquare: Chicago ORD2
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
16.11 miles Stack: CHI02
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
16.16 miles 4267 Meridian Pkwy: Lincoln Rackhouse
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
16.17 miles DataBridge: Aurora, IL
DataBridge Sites is the new name for ESite Systems, a company with two decades of history in the industry.
16.21 miles Equinix Chicago CH3
16.27 miles Equinix: CH5
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
16.31 miles CyrusOne: Lombard CHI5
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
16.32 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
16.33 miles EdgeConneX CHI02
16.34 miles CloudHQ: Mount Prospect ORD1
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
16.34 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
16.36 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
16.37 miles Stream Chicago I
Free-Standing, Data Center Designed to Tier III Standards
16.39 miles CenturyLink: Arlington Heights
16.42 miles EdgeConneX CHI01
16.43 miles EdgeConneX: CHI03
EdgeConneX CHI03 is a new 167,000-square-foot, two-story data center building on its Elkgrove campus near Chicago.
16.50 miles CloudHQ Mount Prospect ORD3
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
16.51 miles CloudHQ: Mount Prospect ORD2
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
16.52 miles Centersquare: Lisle CHI1
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
16.92 miles Colovore: Chicago
Colovore is developing a liquid-cooled colocation data center in Chicago, Illinois, with construction expected to be completed in the fourth quarter of 2026.
16.97 miles T5: Chicago V
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
17.05 miles TA Realty: Elk Grove
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
17.21 miles Digital Fortress: Chicago Lombard
17.22 miles 360TCS-Lombard
17.53 miles CloudCenters: Lisle, IL
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
18.41 miles Summit: Naperville
18.54 miles Colocation America CH3
18.54 miles DataBank ORD3 Mount Prospect
18.81 miles T5: Chicago lll
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
18.90 miles Campus MaxInterested in this information?Contact us
18.95 miles Apotech: Illinois 1
Apotech Group operates its Illiois 1 data center facility in the Chicago market, situated at 1331 E Business Center Drive. This facility is a retrofitted structure, encompassing 32,000 square feet of space.
19.15 miles Aligned ORD-02
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
19.17 miles Aligned Chicago ORD-01
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
19.30 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
20.00 miles Iron Mountain Chicago
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.

WhiteRose: South Elgin, IL Data Center Photos See all

Operating Company

Operated by:

White Rose Partners is a development firm focused on digital infrastructure, with deep expertise and a global network of relationships in the data center industry. Working collaboratively with project stakeholders and communities, the firm identifies and executes development opportunities including powered land development, powered shell, and customer build-to-suit.

1
Facilities
1
Markets

News See all

Read Developer Pulls Proposed Data Center Project in Pekin, Illinois
Developer Pulls Proposed Data Center Project in Pekin, Illinois

Developer Pulls Proposed Data Center Project in Pekin, Illinois

May 13, 2026 Illinois

Developer Western Hospitality Partners (WHP) has officially withdrawn its proposal to develop a data center in Pekin, Illinois, roughly two months after Mayor Mary Burress announced publicly that the city would not proceed with the project. “This letter shall serve as purchaser’s notice to...

Read more
Read SunRocket Capital Funds $15m Solar and Storage Project in Illinois
SunRocket Capital Funds $15m Solar and Storage Project in Illinois

SunRocket Capital Funds $15m Solar and Storage Project in Illinois

July 18, 2025 Illinois

US-based private lender SunRocket Capital has closed a $15 million financing package for a solar with battery storage project designed to provide power to the data center sector in Illinois.“SunRocket Capital is proud to facilitate the growth of renewable energy infrastructure that powers the...

Read more
Read MISO approves regional transmission plan
 MISO approves regional transmission plan

MISO approves regional transmission plan

December 17, 2024 Illinois

The Midcontinent Independent System Operator’s (MISO) board has approved a $21.9 billion long-range transmission plan. The new transmission lines will span 1,800 miles and include some that will connect directly to PJM Interconnection’s 765kV system in Illinois, Indiana, and Ohio. “The main thing...

Read more
Read Google Cloud to provide private cloud region and colocation facility for CME Group
Google Cloud to provide private cloud region and colocation facility for CME Group

Google Cloud to provide private cloud region and colocation facility for CME Group

June 28, 2024 Illinois

Google Cloud is providing a private cloud region for financial services company CME Group in Aurora, Illinois which will host a specialized platform to support global trading of CME's futures and options markets and will provide traders with access to a cloud-based low-latency network and...

Read more
Read NCSA expands Radiant Supercomputer
NCSA expands Radiant Supercomputer

NCSA expands Radiant Supercomputer

May 09, 2024 Illinois

The University of Illinois Urbana-Champaign’s (UIUC) National Center for Supercomputing Applications (NCSA) this week announced it has installed additional graphics processing units (GPUs) to its private cloud Radiant system. The University acquired the GPU with a funding commitment of $50...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?