Street Address
Interested in this information? Contact us
Under Construction
New facility under construction
Operated by:

Meta: Project Anthem

Year Planned: 2028
Lot Size: 340 acres

Meta is developing a new AI-focused data center campus in east Tulsa near East 11th Street and the Creek Turnpike. The project, previously known as Project Anthem, is now under construction and will serve as the first anchor tenant at Fair Oaks Innovation Park. The campus is expected to be operational in 2028.

Map and Nearby Locations:

This Facility
Meta Sites
Nearby Facilities

Meta: Project Anthem Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Two

Distance Site About
1.22 miles Project Anthem (Phase 2)
Developer Atmoss LLC has withdrawn its rezoning application for the second phase of "Project Anthem," a massive data center development in Tulsa, Oklahoma.
6.71 miles TulsaConnect DC3
Campus has true dual-substation electrical feeds with automatic switchgear to switch between substations True "A" and "B" UPS configuration via reliable Eaton 9395 and Powerware 9315 systems with fully independent output feeds to customer equipment with no common/shared points of failure
6.90 miles Compass Tulsa
6.93 miles TierPoint Tulsa-State Farm
7.66 miles Project Astro (Broken Arrow)
The data center project proposed for Broken Arrow, Oklahoma, was completely withdrawn in June 2026 after the anonymous developer’s Letter of Intent to purchase the 51-acre site expired.
12.06 miles HP Cherokee Data Center (Tulsa)
In 2009, EDS expanded the data center to 404,000 square feet with four data halls that each have 40,000 sqft of floor space.
12.55 miles Project Clydesdale Expansion
12.61 miles Project Clydesdale
Blue Owl-backed data center developer Beale Infrastructure has broken ground on a new campus outside Tulsa, Oklahoma.
13.95 miles OneNet OSC
14.03 miles OCOSA 321 S Boston
14.03 miles TulsaConnect DC1
All access to the facility is via TulsaConnect escort Cross-connects for analog phone service (POTS), T-1, DS-3, etc available to every rack at no additional charge SSAE 16 audited facilities
14.04 miles TierPoint Tulsa
Located in the historic Brady district north of downtown, TierPoint’s Tulsa data center is the largest carrier-neutral telecommunications space in the area.
14.10 miles Prescott Realty Group-110 West 7th
14.12 miles TulsaConnect DC2
SSAE 16 audited facility Biometric access control system at facility entrances DC1 is on a different power grid than DC2
14.26 miles Lumen Tulsa 1
15.34 miles Beale: Project Mustang
Beale Infrastructure is reportedly in negotiations to develop Project Mustang, a new data center campus located in Claremore, Oklahoma, just outside of Tulsa.
16.56 miles Beale: Project Atlas
Project Atlas, a proposed hyperscale data center campus spanning approximately 270 acres in south Coweta, has been officially withdrawn by Beale Infrastructure.

Plaza One Data Center Photos (See all)

Operating Company

Operated by:

Founded in 2004, Facebook needs no introduction as the world's largest social network. All the status updates, family photos and videos add up and create a need for a massive amount of storage and compute. Facebook maintains a growing stable of data centers spread across the world.

166
Facilities
9
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?